HomeMy WebLinkAboutChange Order No. 14 for the Kittitas Highway Improvements ProjectSHEET 1 OF 2 DATE: 01119116 KITTITAS COUNTY DEPARTMENT OF PUBLIC SERVICES CHANGE ORDER CHANGE ORDER NUMBER 14 129 Ordered by Engineer in accordance with Section 1- 04.4 of the Standard Specifications TO : Belsaas and Smith Construction Inc . ~ Change order proposed by Contractor ENDORSED BY: ~ ~~t2--1/74/1" S~gnature y. /:J Date TItle : L /-r CONSENT GIVEN BY SURETY: (When required) By : __________ _ Attorney -in-fact Date PO Box 926 Ellensburg, W A 98926 PROJECT TITLE: Kittitas Highway Safety Improvements Contract No . RC1S4S-Jl Federal Aid No. STPD-CI90(003) DESCRIPTION OF WORK YOU ARE ORDERED TO PERFORM THE FOLLOWING DESCRIBED WORK UPON RECEIPT OF AN APPROVED COPY OF THIS CHANGE ORDER. THE UNDERSIGNED HEREBY PROPOSES TO UNDERTAKE AND COMPLETE THIS IMPROVEMENT, IN ACCORDANCE WITH SAID PLANS , SPECIFICA TIONS , AND CONTRACT, AND THE FOLLOWING SCHEDULE OR RATES AND PRICES : • This change order facilitates payment for quantity adjustments in several line item cost overruns and underruns as itemized in Pay Request #12. CONTRACT TIME o additional working days are added to this contract due to this change order. ORIGINAL CONTRACT AMOUNT $3 ,978 ,871.50 APPROV AL RECOMMENDED CURRENT CONTRACT AMOUNT $4136180.36 ESTIMATED NET CHANGE THIS ORDER $196,547.84 APPROVED ESTIMATED CONTRACT TOTAL AFTER CHANGE $4,332 ,728.20 Project Engineer Date ( ~---. -I bitt/I&, Chairperson Date APPROVED ~ ()bo/~/b Board of County Commissioners Director Date SHEET 20f2 KITTITAS COUNTY Kittitas Highway Safety DEPARTMENT OF PUBLIC WORKS Improvements Project CHANGE ORDER ESTIMATE Change Order # 14 ITEM BID. DESCRIPTION UNIT UNIT PRICE Quantity CHANGE FROM NO. NO. MEAS THE ORIGINAL CONTRACT 129 Change Order # 14 (cost over runs) LS $196,547 .84 1 $196 ,547 .84 TOTAL COST $196,547.84 K:ITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director CHANGE ORDER JUSTIFICA TION & COST ANAL YSIS Date: January 19, 2016 Project Name: Kittitas Highway Safety Improvements Project Number: RC 1545-J1 Prepared by: Roy Chance, Construction Manager Justification: Change Order #14 Throughout the project numerous bid items exceeded contract quantity associated with the following construction operations. Project inspection identified multiple culverts in need of repair, extension or replacement that were unanticipated because their condition could not be assessed until exposure during construction . Further, the project encountered an increase in concrete slab replacement volume necessitated upon discovery of deteriorated existing condition after exposure. A significant increase in the paint line removal pay item was experienced due to the old paint line's relationship to design road centerline. To facilitate proper location of the new paint line, the old paint line needed to be removed . Unsuitable material at various locations resulted in excavation increases and suitable replacement material increases . Cost analysis: The contractor offered extensions of unit costs on all material over runs, which was deemed reasonable by Public Works . 411 N. Ruby St., Suite #1 Ellensburg, WA 98926 TEL (509) 962-7523 FAX (509) 962-7663