Loading...
HomeMy WebLinkAboutResolutionAuthorizingCRPNumbersandProjectsKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: March 20, 2018 ACTION REQUESTED: Approve a Resolution Authorizing County Road Projects for Multiple Projects and Assigning CRP Numbers BACKGROUND: Kittitas County Public Works is beginning work on several projects that are currently on our six year STIP and annual construction program. RCW 36.75.050 requires the BOCC by resolution to authorize each project to allow for Survey, Design, ROW, and Construction. Projects that are currently on the annual construction program are as follows: • Roadside Hazard Safety Improvement — Federally funded county wide safety projects • Fairview Road - replace three failing culverts with a bridge and realign Coleman Creek • Naneum Road — Replace a failing and undersized culvert on Naneum Road and Naneum Creek • Wiehl Road — Road Improvement District project for Wiehl Road. • University Way /BR#88342 — Repair the bridge over BNSF on University Way West of Ellensburg. • Bar 14 Road Turnaround — Construct Turn Arounds on Bar 14 Road Projects that are currently on the six year STIP but need to be added to the annual construction program are as follows: • Mohar Road — Repair the settling roadway on Mohar Road • Kachess Lake Rd — Replace failing and undersized culvert on Kacess Lake Rd • Bender Road — Widen, add bike and pedestrian facilities, update pavement and drainage from Reecer Creek Road to Ellensburg City Limits. • Dolarway Intersection — Construct Roundabout (WSDOT & City of Ellensburg) INTERACTION: Public Works RECOMMENDATION: Approve a Resolution Authorizing County Road Projects for Multiple Projects and Assigning CRP Numbers HANDLING: Return one original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Lucas Huck, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2018 - RESOLUTION AUTHORIZING MULTIPLE COUNTY ROAD PROJECTS AND ASSIGNING CRP NUMBERS WHEREAS: In the matter of initiating county road projects and assigning CRP numbers; and WHEREAS: The roads listed below be improved as shown between the points indicated. These projects are hereby declared to be public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided; and WHEREAS: Appropriations from the officially adopted road fund budget and based on the County Engineer's estimates are hereby made in the amounts and for the purposes shown: 1 2 3 4 5 6 7 8 9 in accordance with RCW 36.77.060 and WAC 136-18. E. A.C. or P.C.C. Pavement TYPE OF (Y) This Project is Hereby Made a Part of the Officially Adopted G. Sidewalks COST ESTIMATE (THOUSANDS) H. Traffic Facilities 36.81.130. ROAD NAME ROAD J. PATHS & TRAILS (RCW 47.30) WORK (See o Annual AND/OR BRIDGE LOG Code) m g Const. NUMBER NO. z Prog. CRP ALL (4) oU o Engin. & Item No. No. R.O.W. CONSTRUCTION M.P. TO M.P. GRANT LOCAL Roadside Hazard VARIES VAR VAR A,H X 58 691 159 2 27847— Safety Improvement Fairview Road 63500 5.03 6.05 A,B,I,E,H,C X 250 2000 7 279-18 Nabeum Road 42000 4.11 4.86 A,C,E,H X 80 650 8 280-18 Wiehl Road N/A PRIV PRIV A.B.C.E.H X 300 350 4 281-18 University Way 93041 1.61 1.61 I,A,E X 175 5 282-18 /BR#88342 Mohar Road 22350 1.75 2.01 A,C,E,H X 45 500 11 Y 283-18 Kachess Lake Rd 12550 2.50 2.50 A,C,E,H X 60 600 12 Y 284-18 Bender Road 93075 0.00 0.68 A,B,C,E,H,G, X 350 2358 192 13 Y 285-18 F Bar 14 Road 42512 0.24 0.25 1 A,B,C X. 10 90 9 286-18 Turnaround Dolarway WSDOT VAR VAR C,F,G, X 445 14 Y 289-18 Roundabout (4) f YPE OF WORK CODE (5) The construction is to be accomplished by contract in A. Preliminary Engineering accordance with RCW 36.77.020 et. seq. B. Right-of-way C. Grading, Draining, Surfacing (6) The construction is to be accomplished by county forces D. Light Bit. Surf. Treatment in accordance with RCW 36.77.060 and WAC 136-18. E. A.C. or P.C.C. Pavement F. Curbs & Gutters (Y) This Project is Hereby Made a Part of the Officially Adopted G. Sidewalks Annual Road Construction Program In Accordance with RCW H. Traffic Facilities 36.81.130. I. Bridge Construction J. PATHS & TRAILS (RCW 47.30) NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, authorize the County Road Projects on the herein designated Kittitas County Roads and Bridges. DATED on this 20th day of March, 2018, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Obie O'Brien, Vice -Chairman Paul Jewell, Commissioner