Loading...
HomeMy WebLinkAboutResolutionAuthorizingChairSignatureProspectusManastashBridgeKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: March 20, 2018 ACTION REQUESTED: Approve a Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Manastash Road Bridge Replacement Project BACKGROUND: The Manastash Road Bridge project will replace the deteriorated bridge over Manastash Creek at MP 10.60. This bridge is currently load restricted and is the only access in and out for many residents and commercial operations. INTERACTION: Public Works successfully received a grant from Federal Highways BRAC program, funding the bridge replacement in the amount of $2,746,970. Public Works has successfully negotiated the adjustment of the previously approved County Road Administration Board Rural Arterial Trust Account (RATA) funds such that RATA funds will be used to cover the 13.5% local match requirement through the BRAC program. RATA funds have a 10% match requirement. The total project cost is anticipated to cost $3,000,000 to $3,500,000 with a net impact to local road funds to cover the required match following payment by RATA and BRAC funding of approximately $35,000 to $50,000. Public Works is preparing to advertise the project for construction in April of 2018 and is requesting the release of the Federal Construction Funds. This requires the Local Agency Federal Aid Project Prospectus to be signed and approved by the Chair of the Board of County Commissioners. Public Works RECOMMENDATION: Approve a Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Manastash Road Bridge Replacement Project HANDLING: Return one original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Lucas Huck, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2018 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE MANASTASH ROAD BRIDGE REPLACEMENT PROJECT WHEREAS: The Manastash Road Bridge project will replace the deteriorated bridge over Manastash Creek at MP 10.60. This bridge is currently load restricted and is the only access in and out for many residents and commercial operations; and WHEREAS: Public Works received a grant from Federal Highways BRAC program for the bridge replacement in the amount of $2,746,970 with a 13.5% local match requirement; and WHEREAS: Public Works was notified by the County Road Administration Board on August 17, 2017 that the design funding necessary for the project had been awarded in the amount of $315,480; and WHEREAS: In preparation to advertise the project for construction in April of 2018 Public Works is requesting the Washington State Department of Transportation to release the Federally Funds for construction; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the agency's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Manastash Road Bridge Replacement Project. DATED on this 20th day of March, 2018, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Obie O'Brien, Vice -Chairman Paul Jewell, Commissioner Washington State VAdw 'R Department of Transportation Local Agency Federal Aid Project Prospectus DOT Form 140-101 Page 1 Revised 04/2015 Previous Editions Obsolete Prefix Route ( ) 3/14/2018 Federal Aid Project Number _Date DUNSNumber 01-020-2547 BRS 19DE Local Agency CRP 276-17 WSDOT ( Federal Employer 91-6001349 Project Number Use Only Tax ID Number Agency CAAgency Federal Program Title Kittitas County Public Works Yes ❑ No ❑✓ 20.205 ❑Other Project Title Start Latitude N 46.959997 Start Longitude W -120.785222 Manastash Rd -Manastash Creek Bridge Replacement End Latitude N 46.959313 End Lon itude W -120.686851 Project Termini From -To Nearest City Name Project Zip Code (+4) MP 10.56 MP 10.64 Ellensburg 98926-7989 Begin Mile Post End Mile Post Length of Project Award Type 10.56 10.64 .08 F✓ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 0380 19 Kittitas WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number South Central Region 13 8 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P:E. 350,480 350,480 0 September 2017 R/1N 38,500 38,500 0 December 2017 Const. 13,122,653 375,683 j2,746,970 May 2018 Total 3,511,633 764,663 2,746,970 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 26 2 Existing bridge is damaged and significantly load restricted, additionally significant scour is occurring from Manastash creek threatening the integrety of the bridge and put it at risk for closure during high flows. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Replace existing 1975 distressed concrete bridge with a longer, single -span prestressed concrete girder structure. Local Agency Contact Person . Title Phone Lucas Huck County Engineer 509-962-7523 Mailing Address City State Zip Code 411 N Ruby ST, Suite 1 Ellensburg WA 98926 By Approving Authority Project Prospectus Title Public Works Director (Date 2 DOT Form 140-101 Page 1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Manastash Rd - Manastash Creek Bridge Rel 3/14/2018 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ✓' New Construction ❑ Path / Trail ❑ 3-R 30 2 ✓ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R F-1Railroad ❑Parking ❑ Other ✓i Bridge Geometric Design Data j Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal❑ Urban E]❑Urban Minor Arterial E] MinorArterial Functional ✓ Rural [:]Collector ❑ Rural ❑Collector ❑ Major Collector Classification E] NHS El major Collector ❑NHS [ Minor Collector ❑Minor Collector ❑ Local Access ❑ Local Access Terrain ❑ Flat ❑ Roll [ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 35 Design Speed 35 Existing ADT ADT<400 ! Design Year ADT 400 Design Year 2018 Design Hourly Volume (DHV) NA Performance of Work Preliminary Engineering Will Be Performed By ! Others Agency Kittitas County Public Works / Consultant 85 % 15 Construction Will Be Performed By Contract Agency Contractor 100 % 0 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 [ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations The project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) Package to the U.S. Army Corps of Engineers (USACE), Washington Department of Fish and Wildlife (WDFW), and Washington Department of Ecology (Ecology). Atter submittal of the JARPA Package coordination will be provided with federal and/or state agencies to obtain a Corps 404 permit from the USACE, a Hydraulic Permit Approval (HPA) from WDFW, and an Ecology 401 permit from Ecology. Because of the federal nexus, Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA) Section 106 consultations must be completed. A biological assessment and formal consultation will be completed for ESA, and a cultural assessment and report will be completed for NHPA requirements. DOT Form ivu-iur Paget Revised 04/2015 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Manastash Rd - Manastash Creek Bridge Ret 3/14/2018 Right of Way ❑ No Right of Way Needed L✓ Right of Way Needed * All construction required by the Zj No Relocation ❑ Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required U No railroad work required [✓] All utility work will be completed prior to the start ❑AII railroad work will be completed prior to the start of of the construction contract the construction contract ❑AII utility work will be completed in coordination ❑AII the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project existing utilities will be temporarily relocated out of the way for construction once project is complete utility companies will install permanent utilities on the hangers across the new bridge. I I FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes Z No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Date Agency Kittitas County Public Works By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete