HomeMy WebLinkAboutResolutionAuthorizingChairSignatureProspectusManastashBridgeKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: March 20, 2018
ACTION REQUESTED: Approve a Resolution Authorizing the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Bridge
Replacement Project
BACKGROUND: The Manastash Road Bridge project will replace the deteriorated bridge
over Manastash Creek at MP 10.60. This bridge is currently load
restricted and is the only access in and out for many residents and
commercial operations.
INTERACTION:
Public Works successfully received a grant from Federal Highways BRAC
program, funding the bridge replacement in the amount of $2,746,970.
Public Works has successfully negotiated the adjustment of the previously
approved County Road Administration Board Rural Arterial Trust
Account (RATA) funds such that RATA funds will be used
to cover the 13.5% local match requirement through the BRAC program.
RATA funds have a 10% match requirement.
The total project cost is anticipated to cost $3,000,000 to $3,500,000 with
a net impact to local road funds to cover the required match following
payment by RATA and BRAC funding of approximately $35,000 to
$50,000.
Public Works is preparing to advertise the project for construction in April
of 2018 and is requesting the release of the Federal Construction Funds.
This requires the Local Agency Federal Aid Project Prospectus to be
signed and approved by the Chair of the Board of County Commissioners.
Public Works
RECOMMENDATION: Approve a Resolution Authorizing the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Bridge
Replacement Project
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution
LEAD STAFF: Lucas Huck, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2018 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS FOR THE MANASTASH ROAD BRIDGE
REPLACEMENT PROJECT
WHEREAS: The Manastash Road Bridge project will replace the deteriorated bridge over
Manastash Creek at MP 10.60. This bridge is currently load restricted and is the
only access in and out for many residents and commercial operations; and
WHEREAS: Public Works received a grant from Federal Highways BRAC program for the
bridge replacement in the amount of $2,746,970 with a 13.5% local match
requirement; and
WHEREAS: Public Works was notified by the County Road Administration Board on August
17, 2017 that the design funding necessary for the project had been awarded in
the amount of $315,480; and
WHEREAS: In preparation to advertise the project for construction in April of 2018 Public
Works is requesting the Washington State Department of Transportation to
release the Federally Funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the agency's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Manastash Road Bridge
Replacement Project.
DATED on this 20th day of March, 2018, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Laura Osiadacz, Chairman
Obie O'Brien, Vice -Chairman
Paul Jewell, Commissioner
Washington State
VAdw
'R Department of Transportation
Local Agency Federal Aid
Project Prospectus
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Prefix
Route
( )
3/14/2018
Federal Aid
Project Number
_Date
DUNSNumber 01-020-2547
BRS
19DE
Local Agency
CRP 276-17
WSDOT
(
Federal Employer
91-6001349
Project Number
Use Only
Tax ID Number
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
Yes ❑ No
❑✓ 20.205 ❑Other
Project Title
Start Latitude N 46.959997
Start Longitude W -120.785222
Manastash Rd -Manastash Creek Bridge Replacement
End Latitude N 46.959313
End Lon itude W -120.686851
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
MP 10.56 MP 10.64
Ellensburg
98926-7989
Begin Mile Post End Mile Post
Length of Project Award Type
10.56 10.64
.08 F✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
0380
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total
Local Agency Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar Nearest Hundred Dollar
Month Year
P:E.
350,480
350,480 0
September 2017
R/1N
38,500
38,500 0
December 2017
Const.
13,122,653
375,683 j2,746,970
May 2018
Total
3,511,633
764,663 2,746,970
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
26
2
Existing bridge is damaged and significantly load restricted, additionally significant scour is occurring from
Manastash creek threatening the integrety of the bridge and put it at risk for closure during high flows.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Replace existing 1975 distressed concrete bridge with a longer, single -span prestressed concrete girder
structure.
Local Agency Contact Person . Title
Phone
Lucas Huck County Engineer
509-962-7523
Mailing Address
City State Zip Code
411 N Ruby ST, Suite 1
Ellensburg WA 98926
By
Approving Authority
Project Prospectus
Title Public Works Director (Date
2
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title Date
Kittitas County Public Works
Manastash Rd - Manastash Creek Bridge Rel 3/14/2018
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width Number of Lanes
✓' New Construction ❑ Path / Trail ❑ 3-R
30 2
✓ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R
F-1Railroad ❑Parking ❑ Other
✓i Bridge
Geometric Design Data j
Description Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal❑ Urban E]❑Urban Minor Arterial
E] MinorArterial
Functional ✓ Rural [:]Collector
❑ Rural ❑Collector
❑ Major Collector
Classification E] NHS
El major Collector
❑NHS
[ Minor Collector
❑Minor Collector
❑ Local Access
❑ Local Access
Terrain ❑ Flat ❑ Roll [ Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
35
Design Speed
35
Existing ADT
ADT<400
! Design Year ADT
400
Design Year
2018
Design Hourly Volume (DHV)
NA
Performance of Work
Preliminary Engineering Will Be Performed By ! Others
Agency
Kittitas County Public Works / Consultant 85 %
15
Construction Will Be Performed By
Contract Agency
Contractor
100 % 0
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 [ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
The project will be required to submit a Joint Aquatic Resources Permit Application (JARPA) Package to the U.S. Army Corps of
Engineers (USACE), Washington Department of Fish and Wildlife (WDFW), and Washington Department of Ecology (Ecology).
Atter submittal of the JARPA Package coordination will be provided with federal and/or state agencies to obtain a Corps 404
permit from the USACE, a Hydraulic Permit Approval (HPA) from WDFW, and an Ecology 401 permit from Ecology. Because of
the federal nexus, Endangered Species Act (ESA) Section 7 and National Historic Preservation Act (NHPA) Section 106
consultations must be completed. A biological assessment and formal consultation will be completed for ESA, and a cultural
assessment and report will be completed for NHPA requirements.
DOT Form ivu-iur Paget
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
Kittitas County Public Works Manastash Rd - Manastash Creek Bridge Ret 3/14/2018
Right of Way
❑ No Right of Way Needed
L✓ Right of Way Needed
* All construction required by the
Zj No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑ No utility work required
U No railroad work required
[✓] All utility work will be completed prior to the start
❑AII railroad work will be completed prior to the start of
of the construction contract
the construction contract
❑AII utility work will be completed in coordination
❑AII the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
existing utilities will be temporarily relocated out of the way for construction once project is complete utility
companies will install permanent utilities on the hangers across the new bridge.
I
I
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes Z No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
Agency Kittitas County Public Works
By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 04/2015 Previous Editions Obsolete