Loading...
HomeMy WebLinkAboutResolutionCRABLetterManastashRdBridgeKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA SESSION DATE: February 611', 2018 ACTION REQUESTED: Approve the Chair's signature on a Letter to the County Road Administration Board for RAP project #1917-01 requesting the reduction of Rural Arterial Trust Account Funds and advancement of construction funding for the Manastash Road Bridge Replacement Project BACKGROUND: The Manastash Road Bridge project will replace the deteriorated bridge over Manastash Creek at MP 10.60. This bridge is currently load restricted and is the only access in and out for many residents and commercial operations. Public Works submitted a Project Prospectus requesting Rural Arterial Program funds from the County Road Administration Board (CRAB) for the replacement of said bridge in the amount of $1,958,000. Resolution 2017-146 authorized the signing of the project agreement with CRAB for the expenditure of the design funding that had been awarded in the amount of $315,480. Public Works successfully received a grant from Federal Highways BRAC program funding the bridge replacement. This has resulted in our ability to reduce the RATA funds needed request that CRAB authorize the reduction in funding, advance the funding from 2020/2021 to 2018 in an attempt to cover Public Works 13.5% local match requirement through the BRAC program. If successful this $3,000,000 bridge replacement project would only end up requiring the use of approximately $60,000 of local funds to cover the 10% local match requirement of the RATA funds used for the design and construction. INTERACTION: Public Works RECOMMENDATION: Motion to Approve the Chair's signature on a Letter to the County Road Administration Board for RAP project #1917-01 requesting the reduction of Rural Arterial Trust Account Funds and advancement of construction funding for the Manastash Road Bridge Replacement Project HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution, Letter LEAD STAFF: Lucas Huck, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2018 - TO APPROVE THE CHAIR'S SIGNATURE ON A LETTER TO THE COUNTY ROAD ADMINISTRATION BOARD FOR RAP PROJECT #1917-01 REQUESTING THE REDUCTION OF RURAL ARTERIAL TRUCT ACCOUNT FUNDS AND ADVANCEMENT OF CONSTRUCTION FUNDING FOR THE MANASTASH ROAD BRIDGE REPLACEMENT PROJECT WHEREAS: The Manastash Road Bridge project will replace the deteriorated bridge over Manastash Creek at MP 10.60. This bridge is currently load restricted and is the only access in and out for many residents and commercial operations; and WHEREAS: Public Works submitted a Project Prospectus requesting Rural Arterial Program funds (RATA) from the County Road Administration Board (CRAB) for the replacement of said bridge in the amount of $1,300,000; and WHEREAS: Public Works was notified by CRAB on August 17, 2017 that the design funding necessary for the project had been awarded in the amount of $315,480; and WHEREAS: Resolution 2017-146 authorized the signing of project agreement #1917- 01 with CRAB for the expenditure of the design funding; and WHEREAS: On December 6, 2017 Public Works was awarded Federal Funding from the Local Bridge Program (BRAC) in the amount of $2,746,970 with a 13.5% local match requirement; and WHEREAS: Kittitas County is requesting to reduce the original RATA fund request from $1,300,000 to $686,325 this request allows Kittitas County to complete the design ($315,480) and fund the 13.5% local match requirement for the BRAC funds ($370,845); and WHEREAS: Kittitas County is also requesting authorization and advancement of the RATA construction funds to quarter four 2018; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on a Letter to the County Road Administration Board for RAP project 41917-01 requesting the reduction of Rural Arterial Trust Account Funds and advancement of construction funding for the Manastash Road Bridge Replacement Project DATED on this 6th day of February, 2018, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Obie O'Brien, Vice -Chairman Paul Jewell, Commissioner „SCP�ES_]e THS o��He c c r y 4p All Il1A\ fOl \T\ February 6, 2017 John Koster Executive Director Kittitas County, Washington BOARD OFCOUNTY COMMISSIONERS District One District Two District Three Paul Jewell Laura Osiadacz Obie O'Brien County Road Administration Board 2404 Chandler Ct. SW, Ste. 240 Olympia, WA 98502-0913 Re: Manastash Road Bridge Project, RAP Project Number 1917-01 Dear Mr. Koster, Kittitas County previously requested $1,300,000 in RATA funds for RAP project number 1917- 01. Kittitas County is currently authorized to expense $315,480 of said RATA funds for right of way and the design. Kittitas County is anticipating the remaining $984,520 RATA funds for the construction of the project to be authorized in 2020-2021. Following this original request Kittitas County successfully secured Federal Funding through the Local Bridge Program (BRAC). This success has resulted in Kittitas County requesting to reduce our initial RATA fund ask and for authorization and advancement of RATA construction funds. The BRAC program authorized funding in the amount of $2,746,970 with a 13.5% local match requirement if the project is constructed prior to 2020 and a 20% local match requirement post 2020. In anticipation of successfully securing Federal Funding, Kittitas County began the design and right of way process utilizing RATA and Local funds Fall of 2017 and is on track to advertise the project March of 2018 with construction completed November 2018. Please accept this letter as the official request from Kittitas County to reduce our original RATA fund request from $1,300,000 to $686,325 releasing the remaining funds to the Southeast Region Array. This new request would allow Kittitas County to complete the design as scheduled and fund the 13.5% local match requirement. Additionally, Kittitas County is requesting that the remaining RATA funds $370,845 would be authorized and advanced to quarter four, 2018 to align with our current construction schedule and Federal Funding expenditure plan. Kittitas County Courthouse 205 West 5” Avenue, STE 108 Ellensburg, WA 98926 (509) 962-7508 FAX (509) 962-7679 Should you require additional information or have any questions, please contact Lucas Huck County Engineer at 509-962-7523. Respectfully Submitted, Laura Osiadacz Board of County Commissioners, Chairman Kittitas County Courthouse 205 West 5i°Avenue, STE 108 - Ellensburg, WA 98926 (509) 962-7508 FAX (509) 962-7679