HomeMy WebLinkAboutResolutiontoRatifyCoEngSignatureTO12KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: March 6, 2018 ACTION REQUESTED: Ratify the County Engineer's Signature on Task Order No. 12 with KPFF BACKGROUND: KPFF is Public Work's contract structural engineer through 2018. Recognizing our desire for supporting 2017 bridge inspections, we entered into a bridge inspection task order with KPFF (Task Order No. 9 — EXHIBIT 1). In fall of 2017, we became aware that our lead bridge inspector (Construction Manager Folk) was going to be out on extended leave beginning in December 2018. Knowing that we would require supplemental inspection support from KPFF through November 2015, the Public Works Director requested the County Engineer prepare an additional task order with KPFF covering the absence of the Construction Manager. The Public Works Director failed to direct a supplement to Task Order No. 9 extending the amount through December 2017 be prepared and, if over $50,000, bringing the action to the Board of County Commissioners for authorization. Rather, staff prepared a separate task order covering November through June of 2018 pursuant to Task Order No. 12 (EXHIBIT 2). Task Order No. 12 overlaps Task Order No. 9 and presents the appearance that Public Works is circumventing our authorized Task Order authority — this was not an intentional action. The Public Works Director discovered the error while paying consultant invoices on February 23`d, 2018. Ratifying the County Engineer's signature on Task Order No. 12 removes any perception that Public Works attempted to circumvent our purchasing authority. All other task orders since 01/01/2016 have appropriate Board of County Commission signature on tasks exceeding $50,000. The Public Works Director regrets missing the applied appropriate contract measures prior to authorizing Task Order No. 12. INTERACTION: Public Works RECOMMENDATION: Ratify the County Engineer's signature on KPFF Task Order No. 12 HANDLING: Return one original to Public Works ATTACHMENTS: Exhibit 1: KPFF Task Order No. 9 Exhibit 2: KPFF Task Order No. 12 LEAD STAFF: Mark R. Cook, Director ,ns<rrv. - ro nip.. DEPARTMENT OF PUBLIC WORKS nrrrr,s curn-rr Formal Task Order Document (KPFF) Task Order Number 009 Maximum Amount Payable $37,000 Completion Date 12/31/2017 The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- 19ENG2) shall be in full force and effect for this Task Order. Location of Project: Kittitas County Project Title: 2017 Routine Bridge Inspections Description of Work: A KPFF Certified Bridge Inspector and Team Leader (per WSDOT & NHI) will perform an "Cheer the Shoulder ", on site, review of County Routine Bridge Inspections working collaboratively with a County WSDOT certified Team Leader for bridge inspections. The certified KPFF Inspector will accompany the County Bridge Inspector (Team Leader) on the 2017 Routine Bridge Inspections. The KPFF Inspector will serve as the Co-ln,spector for each bridge. The intent of the collaborative effort is to provide the County with access, on site and in report development, with an experienced WSDOT trained bridge inspector to assist the County in the development of their in-house bridge inspection skills. Scope of Work: 1. The Kpff Inspector will review the last Inspection Report for each bridge prior to the 2017 inspection —goal is to gain familiarity with the bridges' general condition and any specific concerns/ repairs to check on. We recommend the County Inspector also perform this effort. • Perform all inspections in conformance with the WSDOT general methods of practice and requirements. 2. The field inspection schedule is anticipated to be as follows: We assume the Comity inspector is also available for these time frames. DEPARTMENT OF PUBLIC WORKS K111 ELLS COUNT1 • September 2017: i. 27 routine bridge inspections ii. 3 separate trips iii. 8 days of inspection, on site. iv. Per -diem: 8 nights and 9 days including travel. one person. • October 2017: 1. 37 routine bridge inspections ii. 4 separate trips iii. 11 days of inspection, on site. iv. Per -diem: I I nights and 12 days including travel .. one person 3. KPFF Bridge Inspector will provide a review of draft -final inspection reports to ensure accuracy with Yield conditions, consistency with the co -inspector's notes, and conformance with NBI and WSDOT inspection standards. 4. If requested by the Team Leader, or the County, the Kpff Co- Inspector with also the sign the final Inspection Report for each bridge. Assumptions: I. County Bridge Inspector will provide a schedule and the route for each bridge inspection trip. County Bridge Inspector will enter all reports into WSBIS/Bridgeworks bridge database. County Bridge Inspector will act as Lead Inspector and sign all inspection reports and add to bridge file. 2. If, for whatever reason, the County desires Kpff to have a greater role in the inspections (such as serve as Team Lead, and/ or provide a second co -inspector this would be considered an extra and we would like to revisit the budget accordingly. Cost Breakdown: See Attached Completion Date: December 31, 2017 Agency Signature: Consultant Signature: 14,Jrw GCl Thomas 11 Whiteman, Associate Date: Date: 07/12/17 Manager CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET Iii CONSULTING ENGINEERS June 22, 2017 Protect Technical Propel Design Protect 1 Manager Specialist Engineer Engineer Coordinator. MULTIPLIER ITEM - SCOPE DESCRIPTION 6]50 '. $4558 $4039 $3589 $2550 26552 1 -- MANAGEMENT I Contract Cori20 $358 InOi vcmroject g B PSummaries 4.0 4 0 $986 Client Comuntion mica 4.0 '. 40 S1.146 Pribect Coordination 60 80 $1.933 _ Management Labor Subtotal: 16.0 0.0 12.0 0.0 4.0 $4,425 $0 2 TRAVEL TO SITE - RT .Travel Ellensburg) Sear, RT Assume Ym TO 4.0 280 230 33003 Travel Labor Subtotal: 1 3 0.0 0.0 28.0 0.0 0,0 $3,003 3 INSPECTION i 31 This PlanninglReviewlEpuipment Prep E4,078 SePlendxr Tnps 3 4.0 12.0 3A 120 ��- $1.025 October Lips c r j 40 16.0 30 16 C' $2254 32 Bridge Inspection - Field Work f1b.643 September Trips 27 225 60.8 $6.515 October Trips 3? 2.25 BY 3 $8,928 33 '.Inspection R ports - ORice Work i $4 633 Prep areLen lby COunlyl � I Review Hope. (before FinaO 64 05 14.0 32.0 $4.149 Plot Soundings@y Coanly; Technical Review ° " $484 Inspection Labor Subtotal: _136 _'. 0.0 125 0.5 1 28.0 10.0 4.0 204.0 00 0,0 $24,164 TO 34 Management Reserve ACditiOnal Inspection Time 80 lime Adel Per Diem $191 Labor Subtotal: $1.039 80 TOTAL LABOR HOURS 26.0 a,0 244.0 0.0 4.0 27BD TOTAL LABOR COSY. $ 3262! 'o � o TOTAL REIMBURSABLE COSTS: 5 387$ TOTAL PROJECT COST S 36,48617 '; YiYTTZTAS COUNTY - _ DEPARTMENT OF PUBLIC WORKS FITI'I I'AII N;N1I Formal Task Order Document (KPFF) Task Order Number 012 ]Maximum Amount Payable 547,000 Completion Date 6/30/2018 The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- 19ENG2) shall be in full force and effect for this Task Order. Location of Project: Kittitas County Project Title: Routine and Under 20 ft. Bridge Inspections Description of Work: Kpff will provide a WSDO Certified Bridge Inspector to serve as Team trader of a total of 86 County bridge inspections. 'There are 25 bridges that meet the NHI definition of a "Bridge", namely the abutment to abutment distance is greater than 20 feet. There are 61 small span structures that do not meet the Nt'II definition of a "Bridge" because the abutment to abutment distance is 20 feet or less- However, regardless of the bridge span length or definition all bridge structures will receive an inspection which is to be in general conformance with the standard WSDOT Routine Bridge Inspection methods and formats. Some modifications of the general WSDOT methodology may be employed for the under 20 It bridges. The Comity will provide a Co -Inspector that will assist the KPFF Team Leader on all inspections. The intent of the collaborative effort is to promote the development of the County's on-site bridge inspection skills and report development skills. Scope of Work: The Kpff Inspector will print, file, and review the last Inspection Report and photo documentation for each bridge prior to the 2017/2018 inspection — goal is to gain familiarity with the bridges' general condition and any specific concerns/ repairs to check on. We recommend the County Inspector also perform this effort. Assume 15 min per bridge. • Perform all inspections in conformance with the WSDOT general methods of practice and requirements. � IiZTTIT�iac3 GOLY7nTT`Y DEPARTMENT OF PUBLIC WORDS AITTI'lAS COLNiY 2. The field inspection schedule is anticipated to be as provided below (November -April). KPFF assumes the County inspector is also available for these time frames. 3. Note: Good ambient light for bridge inspections is often in short supply during the months of November through February. Accordingly, the days below are generated based on the estimated time to drive from bridge -to -bridge and perform the inspection, within the hours each day from sun -rise to sun -set minus two hours_ 4. No allowance is made for weather in the attached fee. Our general policy is to inspect in difficult weather conditions but not engage in conditions or situations resulting from the weather that the Team Leader feels are clearly un -safe- If such situations arise the inspection will be rescheduled for as -soon -as possible. Additional costs resulting from weather delays will be issued to the County prior to any changes of the current schedule or budget, for approval. 5. The attached budget also assumes the following; • The County, will provide a detailed schedule, day-to-day program and map of all the bridges for months of November and December. For the months of Feb -April the County will share their CAU map of the bridge locations, and KPFF will provide a detailed schedule and day-to-day program and map (assume 10 min per bridge). November 2017: • 23 routine bridge inspections 0 19 under 20 ft. bridge inspections • 2 separate trips 0 8 days of inspection, on site. 0 Per -diem: 8 nights and 8 days - includes travel, one person. December 2017: • 28 under 20 ft. bridge inspections • I trip • 6 days of inspection, on site. • Per -diem: 6 nights and 6 days - includes travel, one person. February 2018: • 9 under 20 ft. bridge inspections • 1 trip 0 2 day of inspection. on site. KZTTZT�� aC��FNTY g - DEPARTMENT OF PUBLIC WORKS KI 11 COUNTY • Per -diem: 1-2 nights and 1-2 days - includes travel, one person. March 2018: April 2018: a 5 under 20 ft. bridge inspections 0 1 trip a I day of inspection, on site. Per -diem: I night and I day - includes travel, one person. • 2 routine bridge inspections • 1 trip • 1 days of inspection, on site. • Per -diem: I day - includes travel, one person. 6. County Staff Co -Inspector will prepare reports for November and December structures. County Inspector will submit selection sets to WSDOT for reports to be released. KPFF Bridge Inspector will review draft reports and sign inspection reports for NBI reportable bridges. 7. KPFF Bridge Inspector will prepare and sign reports for February, March and April structures. County Staff will review draft reports. County inspectors will take the November and December field notes to enter the data into the WSDOT Reports, and KPFF will review before final. 8. If, for whatever reason, the County desires Kpff to have a greater role in the inspections (by providing a second co -inspector for example) this would be considered an extra and we would like to revisit the budget accordingly. Cost Breakdown: See Attached Completion Date: June 1, 2018 Agency Signature: Consultant Signature: 1lw.+ndb.^u i'om Whiteman. Project Manager Date: Date: Sept 8n'. 2017 CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET KPFF CONSULTING ENGINEERS August 24, 2017 ivoieyc ns detweed sunrise, and sunset - znr = available inspection ugrit Total number of bridges / structures - a5 AVERAGE COST PER STRUCTURE _ S53567 Pr act TobmW91 Protect Design Prated ! Manager Specialst Engineer- Engineer 9 Adminisbabo'',. MULTIPLIER - (OA/OC) Team Leader r. ITEM SCOPE DESCRIPTION 6923 $5923 $4240 $3989 $2648 2.6552 1 MANAGEMENT (5 months) ContraU Co planta 1.5 3.0 $613 l i P ,act Summaries _ I 20 5.0 50 ¢1.2x2 Client C0,1,11cations me, email phone) __._.. a.0 15.0 $3 159 Project Coordination (ntemal l external) 6.0 15.0 $2792 Management Labor Subtotal: 17.5 0.0 ___... 38.0 0.0 6.0 E7,e46 2 TRAVEL TO SITE - RT Tai Ellensburg I Seattle RT - Assume 6 trips 6.0 4.0 240 $2,702 Travel Labor Subtotal:l 0.0 ! 0.0 24.0 0.0 0.0 $2,702 .77 3 INSPECTION MarJReviewlEquipment P.P laswme 15 in per 31 bridge November -December and 25 min per bridge $4,278 Feb -April). November Trips 12) 2 150 15.0 15o -� $i 589 December Trip 1 90 90 9.0 gp1a February Trip 1 6.0 - 6.0 6.0 Si '.. March Trip 1 '.. 5.0 50 -0 _ $563 'April Trip 1 30 30 _ 3.0 ... $335 32 'Bridge Inspection - Field WOM 613,059 November Trips (2) Q5 hrlday = 8 days) 42 03 10 55.4 56 $5305 December Trip (] Mlday = 6 tlays) 28 03 1 C 37 2 360 gq 276 February Trip (8 hrday=2days) 9 03 10 120 12.0 $1351 all Trip Shirai l day) a 03 10 67 ] 0 $780 April Trip (11 M/tlay=1day) 2 ; 03 10 27 3,0 Ill 3 3 Inspection Reports -ONice Work $12,616 Preparation (by County) (assume 10,,n Irbil 70 Review Report- Rputind 23 iC 230 40 230 $3325 Review Report- Under 20 FT 4. 05 '' 23.5 80 240 $4,172 Preparation toy KPFF)- Urdar 20 FT 14 . ' 5 21 0 23 21 C 52787 Preparation toy KPFF)- Routine "e 2 5 'I, 5 0 C.5 5.0 6655 S!gmngl Subm4ti1g Final 39 0.3 'I 98 30 100 $1.677 Inspection Labor Subtotal: 1] q3.0 6.0 234.6 0.0 11.8 237.0 0.0 0.0 629,954 34 Management Reserves Additional Inspectionr Report Time 20 80 $1.208 Adtati Per Diem _ - $181 - Labor Subtotal E1 449 60 TOTAL LABOR HOURS ITS 17.0 299.0 0.0 5.0 3"3 TOTAL LABOR COST: 5 41,951 r O TOTAL REIMBURSABLE COSTS $ 4,116 TOTAL PROJECT COST 6 46,06).22 ivoieyc ns detweed sunrise, and sunset - znr = available inspection ugrit Total number of bridges / structures - a5 AVERAGE COST PER STRUCTURE _ S53567 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2018 - TITLE: Ratify the County Engineer's Signature on KPFF Task Order No. 12 WHEREAS: Public Works solicited structural engineering firms for service pursuant to a duly published and executed public process; and WHEREAS: KPFF was selected to serve as a Task Order provider of structural engineering services for Public Works pursuant to Resolution 2017-033; and WHEREAS: The County Engineer authorized bridge inspection support services in Task Order No. 9 with KPFF; and WHEREAS: Public Works lost lead bridge inspection services from the Department's Construction Manager in mid-October 2017; and WHEREAS: Public Works authorized a separate task order with KPFF overlapping the same contract period in Task Order No. 12 rather than supplementing Task Order No. through December 2017; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby ratify the County Engineer's signature on KPFF Task Order No. 12. DATED this 6th day of March, 2018, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Laura Osiadacz, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Obie O'Brien, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Paul Jewell, Commissioner