HomeMy WebLinkAboutResolution Authorizing Director Signature on Task Order 13 WatershedKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: May 3, 2016 ACTION REQUESTED: Authorize the Director's Signature on Task Order No. 13 with Watershed Science and Engineering Supporting Final Preparation of 2016 Floodplain by Design Grant Applications in the amount of $49,956.00. BACKGROUND: Recently, the Board of County Commissioners approved a task order with Watershed Science and Engineering (WS&E) supporting preparation and submittal of preliminary 2016 Floodplain by Designs grants. The granting agency has since noticed us that our applications have been selected to move to the final evaluation round. Lack of staffing in Public Works requires outside grant preparation support. WS&E has an open task order contract with Public Works. Jacobs has recently acquired grant writing expertise as a result of company purchase. We propose having Jacobs subcontract to Watershed Science producing final Floodplain by Design (FBD) grant applications for: Phase III Reecer Creek, Yakima River Corridor Implementation and Manastash Creek. The cost for WS&E plus Jacobs is $49,956.00. INTERACTION: Public Works RECOMMENDATION: Move to authorize the Director's signature on Task Order No. 13 with Watershed Science and Engineering. HANDLING: Return one original to Public Works ATTACHMENTS: EXHIBIT 1: Task Order No. 13 with Watershed Science and Engineering LEAD STAFF: Mark R. Cook, Director Page 1 of 1 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2016 - WHEREAS: Kittitas County Public Works submitted three preliminary Floodplain by Design grant applications prepared by Watershed Science and Engineering on January 28, 2016; and WHEREAS: Grant agencies have selected all three preliminary grant applications for final grant submittal; and WHEREAS: Public Works has an open task order contract with Watershed Science and Engineering; and WHEREAS: Unfilled positions in Public Works generate sufficient cost savings to offset the $49,956.00 needed for Watershed Science and Engineering to complete the three Floodplain by Design grant applications (Phase III Reecer Creek, Yakima River Corridor Implementation and Manastash Creek Land Acquisitions); NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Director's signature on Task Order No. 13 with Watershed Science and Engineering preparing three final Floodplain by Design grant applications (Reecer, Yakima and Manastash) submitted by July 1, 2016. DATED this 3rd day of May, 2016, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Obie O'Brien. Chairman Paul Jewell, Vice -Chairman Laura Osiadacz, Commissioner Formal Task Assignment Document Task Number The general provisions and clauses of Agreement KITT-2015-2017 shall be in full force and effect for this Task Assignment Location of Project: Kittitas County Project Title: Floodplain by Design Grant Application Preparation Maximum Amount Payable per Task Assignment: $49,956 (Detailed budget breakdown attached) Contractor: WATERSHED Science & Engineering 110 Prefontaine Place South, Suite 508 Seattle, WA 98104 (206) 521-3000 Completion Date: 12/31/2016 Description of Work: Scope WSE with subconsultant Jacobs, will prepare full grant applications for three Floodplain by Design projects (detailed scope attached). Schedule Final Grant applications will be submitted to the Washington State Department of Ecology by July 1, 2016. Task order will remain open through 12/31/2016. Agency Project Manager Signature: Oral Authorization Date: Consultant Signature: Date: See Letter Dated: Date: 4/25/2016 Agency Approving Authority: Date: Kittitas County Floodplain by Design Grant Support Scope of Work Kittitas County Department of Public Works intends to submit full grant applications to the Washington State Department of Ecology (DOE) for three Floodplain by Design projects: 1. Yakima River Corridor Plan Implementation Project 2. Manastash Creek Corridor Plan Phase II 3. Reecer, Currier and Whiskey Creek Phase III Watershed Science and Engineering will serve as the project lead; however, Jacobs will complete the majority of the grant preparation, to which WSE will provide technical content. Tasks to be completed by WSE are described below and those by Jacobs are presented on the following page. 1. Technical Content The grant applications will require input from technical specialists in the fields of hydrology, hydraulics, and geomorphology. WSE staff will provide this input as needed for each of the three grant applications. 2. Administration WSE will perform standard Task Order administrative activities including: • Regular communication with the County project manager and Jacobs staff. • Prepare and submit monthly invoices each of which will include a brief progress report. Schedule: Final grant applications will be submitted to the Washington State Department of Ecology by July 1, 2016, the grant submission deadline. Budget: Total budget $49,956 (Detailed breakdown provided on attached spreadsheets) ✓ 4,A WATERSHED JACOBS Memorandum 600 108th Avenue, N.E. Suite 700 Bellevue, Washington 98004 United States T +1,425.452.8000 F +1.425.452.1212 w jaoobs.com Date April 22, 2016 Attention Jeff Johnson, Watershed Science and Engineering From Craig Broadhead, Project Manager Subject Kittitas County Floodplains by Design Grant Support The intent of this memorandum is to provide a draft scope and fee for the preparation of three Floodplains by Design grant packages to the Department of Ecology. Tasks to be completed by Jacobs include: Task 1 — Grant Preparation - This task includes grant writing, review, technical editing, and QA/QC for three Floodplains by Design grants. Task 2 - Grant Application Support - This task includes project history and review, engagement and coordination with stakeholders, and grant coordination with Ecology and the County. Task 3 - Project Management - This task includes Jacobs project controls and administrative tasks. Assumptions: The Jacobs Project Manager has the ability to move budget/hours between Tasks to meet deliverables as requested by the County. Effort between tasks may be scalable depending on level of effort required for each grant. Savings due to this scaling will be used on the larger, more complex grant applications or will remain unspent at completion. • Project Management is estimated at 2.5 hours per month. Deliverables: Jacobs will work with WSE to provide full grant submittal packages for three Floodplains by Design grants. Jacobs will coordinate with WSE and the County during grant preparation, and will provide draft and final grant packages for review. Jacobs will coordinate with WSE, the County and Department of Ecology to provide complete and thorough applications. Jacob= Enginee;'ng Group Inc. JACOBS Budget (budget detail attached): Memorandum Kittitas County Floodplains by Design Grant Support April 22, 2016 Total - $41,005 (see attached budget breakdown spreadsheet). Schedule: Complete grant applications will be submitted to the Washington State Department of Ecology by July 1, 2016, the grant submission deadline. Task Order will remain active until December 31, 2016. 411 WATERSHED -aia� SCIENCE & ENGINEERING 110 Pretontaine Pau South, Suite 503 Seattle, WA 96104 Tel. (206) 521-3000 Estimate of Professional Services Prepared for: Kittitas County Project: Floodplain by Design Grant Application Preparation Date: April 25, 2016 Prepared By: Jeff Johnson TASK DESCRIPTIONPr— Hwrs Sr. SCMna rt Sr. Eng. II Staff are. Jr. Eng. GIS Slefti ict Coararm Admin Totals 1. Teandical Content Freparafflon Vaklma River corridor Plan Implementation PFojd a 11 $2,618 Melaklaeh creek CmMm Ran Phase a 3 10 $t wo Reemr, Cuubr W WNsk, Creek Phase III 3 14 $2.322 2. mins ion Total Houn no Direct Labor Cast la) Labor Rete Itmr) TOTAL LABOR COST 1 12.01 1 $197.601 12,371 41.4110.0 1. $1Ma0I1 61 1 SIM NJ $9033 1 $10o.75 11 $0 to SD $0 5132 S>.66i (Assume Mo trips 0 James ofhce M Bellevue. WA) am and Communice5on Markup an Jambs fee to cover taxes etc. Labor Direct Expenses 100 $054a Total Total NMdlrG Oram Buppm sompm