HomeMy WebLinkAboutRes to Approve Change Order 14 Kittitas HwyKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS AGENDA SESSION STAFF REPORT WORK SESSION DATE: January 19, 2016 TOPIC: Kittitas Highway Closeout Change Order ACTION REQUESTED: Approve the Change Order LEAD STAFF: Mark R. Cook RECOMMENDATION: Approve the final change order closing out the contract with Belsaas and Smith for 2015 Kittitas Highway improvement construction. BACKGROUND: During much of 2015, Public Works has worked with Belsaas and Smith constructing safety improvements to Kittitas Highway. During the course of construction, numerous bid items ran over quantity. Inspector field note records validate all quantity over -runs. DISCUSSION: Rather than bring multiple change orders for each bid item over -run, we have worked with our contractor (Belsaas and Smith) electing to bring all items to the Board of County Commissioners on a single change order request. All bid item quantities have been installed in the construction improvement. Public Works does not dispute the installation of the materials nor the quality of the installation. FISCAL IMPACTS: The amount of the final Kittitas Highway Improvement change order is $196,547.84. The current total amount of change orders on the project is $157,308.86. The combined amount of construction change orders for the project is $353,856.70 or approximately 8.2 percent of the cost of construction. ATTACHMENTS: Exhibit 1: Resolution authorizing Change Order #14 increasing the contract amount to $4,332,728.20 Exhibit 2: Change Order #14 Page 1 of 1 PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2016 - TO APPROVE CHANGE ORDER #14 FOR KITTITAS HIGHWAY SAFETY IMPROVEMENTS PROJECT WHEREAS: The Board of County Commissioners authorized road improvements to the Kittitas Highway Safety Improvement Project (Resolution 2014-146) in the amount of $3,978,871.50; and WHEREAS: Additional Costs are required for numerous bid item quantity over runs; and WHEREAS: The Contractor has offered equivalent unit costs for quantity extensions; and WHEREAS: The total quantity over run amounts to $196,547.84; NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve Change Order #14 for the Kittitas Highway Safety Improvements Project for the Amount of $196,547.84. DATED on this 19th day of January, 2016, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Obie O'Brien, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Paul Jewell, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Gary Berndt, Commissioner SHEET 1 OF 2 KITTITAS COUNTY CHANGE ORDER NUMBER DATE: 01/19/16 DEPARTMENT OF PUBLIC SERVICES 14 CHANGE ORDER Ordered by Engineer in accordance with Section 1- TO: Belsaas and Smith Construction Inc. 04.4 of the Standard Specifications PO Box 926 Ellensburg, WA 98926 Change order proposed by Contractor ENDORSED BY: PROJECT TITLE: Kittitas Highway Safety Improvements Signature Date Title: Contract No. RCI 545 -JI CONSENT GIVEN BY SURETY: (When required) Federal Aid No. STPD -C 190(003) By: Attorney -in-fact Date DESCRIPTION OF WORK YOU ARE ORDERED TO PERFORM THE FOLLOWING DESCRIBED WORK UPON RECEIPT OF AN APPROVED COPY OF THIS CHANGE ORDER. THE UNDERSIGNED HEREBY PROPOSES TO UNDERTAKE AND COMPLETE THIS IMPROVEMENT, IN ACCORDANCE WITH SAID PLANS, SPECIFICATIONS, AND CONTRACT, AND THE FOLLOWING SCHEDULE OR RATES AND PRICES: • This change order facilitates payment for quantity adjustments in several line item cost overruns and underruns as itemized in Pay Request # 12. CONTRACT TIME 0 additional working days are added to this contract due to this change order. ORIGINAL 1 11 CURRENT CONTRACT ESTIMATED NET ESTIMATED CONTRACT TOTAL CONTRACT AMOUNT AMOUNT CHANGE THIS AFTER CHANGE $3,978,871.50 $4136180.36 ORDER $4,332,728.20 $196,547.84 APPROVAL RECOMMENDED APPROVED Project Engineer Date Chairperson Date APPROVED Board of County Commissioners Director Date SHEET 2 of 2 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER ESTIMATE Kittims Highway Safety Improvements Project Chane Order 414 ITEM BID. DESCRIPTION UNIT UNIT PRICE Quantity CHANGE FROM NO. NO. MEAS THE ORIGINAL CONTRACT 129 Change Order #14 (cost over runs) LS $196,547.84 1 $196,547.84 TOTAL COST $196,547.84 �E�pSUDLS. _Tp ,E., 24 �O KITTITAS COUNTY KITTITAtS COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director CHANGE ORDER JUSTIFICATION & COSTA Date: January 19, 2016 Change Order #14 Project Name: Kittitas Highway Safety Improvements Project Number: RC 1545-J1 Prepared by: Roy Chance, Construction Manager Justification: Throughout the project numerous bid items exceeded contract quantity associated with the following construction operations. Project inspection identified multiple culverts in need of repair, extension or replacement that were unanticipated because their condition could not be assessed until exposure during construction. Further, the project encountered an increase in concrete slab replacement volume necessitated upon discovery of deteriorated existing condition after exposure. A significant increase in the paint line removal pay item was experienced due to the old paint line's relationship to design road centerline. To facilitate proper location of the new paint line, the old paint line needed to be removed. Unsuitable material at various locations resulted in excavation increases and suitable replacement material increases. Cost analysis: The contractor offered extensions of unit costs on all material over runs, which was deemed reasonable by Public Works. 41.1 N. Ruby St., Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663