Loading...
HomeMy WebLinkAboutChange Order 5KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STAFF REPORT AGENDA SESSION DATE: January 5, 2016 ACTION REQUESTED: Officially enact Change Order #5 for the Tearaway Paving Project. BACKGROUND: In August of 2015 The Director of Public Works obtained verbal authorization of Change order 95 in the amount of $133,228.32. The intent was to facilitate timely direction to the contractor to proceed with the added and altered work without a negative schedule impact. Public Works Staff was directed to follow up with the appropriate enabling documents, but through an oversight, failed to do so. This oversight was recently discovered while processing final payment to the contractor for this project. INTERACTION: Public Works RECOMMENDATION: Motion to enact Change Order #5 for the Teanaway Paving Project. HANDLING: Return a copy of the Resolution to Public Works. Return two copies Change Order #5. ATTACHMENTS: Change Order 45 Resolution LEAD STAFF: Roy Chance, Construction Manager BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2016 - TO APPROVE CHANGE ORDER #5 FOR THE TEANAWAY PAVING PROJECT WHEREAS: The Board of County Commissioners authorized road improvements to Teanaway Road (Resolution 2015-104) in the amount of $3,000,300.00; and WHEREAS: Additional Costs are required for added and altered guard rail per the revised contract plans; and WHEREAS: The Contractor has offered unit price extensions for each; and WHEREAS: It has been determined that the Change Order Total is $133,228.32. The Director of Public Works recommends approval of Change Order #5. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve Change Order #5 for the Teanaway Paving Project for the amount of $133,228.32. DATED on this 5th day of January, 2016, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Chair Vice -Chair Commissioner ATTEST: Clerk of the Board SHEET 1 OF 2 KITTITAS COUNTYCHANGE ORDER NUMBER DATE: DEPARTMENT OF PUBLIC SERVICES 1 5 08/14/2015 CHANGE ORDER ® Ordered by Engineer in accordance with Section TO: Granite Construction 1-04.4 of the Standard Specifications 80 Pond Road Yakima, WA 98901 ® Change order proposed by Contractor ENDORSED Y: PROJECT TITLE: Teanaway Paving Project Signature Ifate Title: Si: Dpo/�r�jp//Z Contract No. RC1 560-B1 CONSENT GIVEN BY SURETY: (When required) By: Attorney -in-fact Date DESCRIPTION OF WORK YOU ARE ORDERED TO PERFORM THE FOLLOWING DESCRIBED WORK UPON RECEIPT OF AN APPROVED COPY OF THIS CHANGE ORDER. THE UNDERSIGNED HEREBY PROPOSES TO UNDERTAKE AND COMPLETE THIS IMPROVEMENT, IN ACCORDANCE WITH SAID PLANS, SPECIFICATIONS, AND CONTRACT, AND THE FOLLOWING SCHEDULE OR RATES AND PRICES: • This change order facilitates the added and altered guardrail work per the revised contract plans that were issued to the contractor via email on August 3,d, 2015 as itemized below. • Work is to be suspended upon completion of shift on Thursday, August 13 and resume on or before Monday, August 31 to facilitate material acquisition. CONTRACT TIME Ten (10) additional working days are added to this contract due to this change order. ORIGINAL CURRENT CONTRACT ESTIMATED NET ESTIMATED CON'T'RACT TOTAL CONTRACT AMOUNT AMOUNT CHANGE THIS AFTER CHANGE $3,000,300.00 $3,156.551.65 ORDER $3,289,779.97 $133,22832 APPROVAL RECOMMENDED APPROVED Project Engineer Date Chairperson Date APPROVED Board of County Commissioners Director Date SHEET 2 of 2 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER ESTIMATE Teanaway Paving Project Change Order#4 ITEM BID, DESCRIPTION UNIT UNIT ESTIMATED ESTIMATED NO. NO. MEAS PRICECHANGEFROM QUANTITY THE ORIGINAL CONTRACT NA Removing beam Guardrail LF $6.85 162.5 $1,113.13 NA Beam Guardrail Type 31 - 9ft Long LF $28.94 3,331.25 $96,406.38 Posts NA EA $2,200.00 -3.00 $(6,600.00) Beam Guardrail Type 31 - Non Flared Terminals (Credit) NA EA $790.65 11.00 $8,697.15 Beam Guardrail Anchor Type 10 NA LS $1,000.00 1.00 $1,000.00 Survey NA LS $13,000.00 1.00 $13;000.00 Traffic Control NA LS $7,500.00 1.00 $7,500.00 Mobilization $121,116.65 SUBTOTAL $12,111.67 General Contractor markup $133,228.32 ESTIMATED TOTAL COST