Loading...
HomeMy WebLinkAboutRes to approve Change Order No 11 Teanaway Paving ProjectKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS STAFF REPORT AGENDA SESSION DATE: January 5, 2016 ACTION REQUESTED: Approve Change Order 411 for the Teanaway Paving Project. BACKGROUND: Various quantity over -runs and under -runs, when calculated together, result in a cost over -run total of $113,172.43. Primary contributors to the over -run was the significant amount of Hot Mix Asphalt needed to pre -level the roadway and achieve the design cross slope throughout the entire length of the project. Also significant were quantity over runs in beam guard rail, posts, non -flared terminals, anchors, labor and traffic control made necessary when guardrail sections were added due to previously unanticipated steep side slope conditions. These roadway sections were not identified in the original FHWA topographic survey. All additional work was performed in accordance with appropriate design standards and best engineering practices under the oversight and to the satisfaction of the County Engineer. INTERACTION: Public Works RECOMMENDATION: Motion to approve Change Order #11 for the Teanaway Paving Project. HANDLING: Return a copy of the Resolution to Public Works. Return two copies Change Order 411. ATTACHMENTS: Change Order 411 Justification and Cost Analysis Resolution LEAD STAFF: Roy Chance, Construction Manager S� CPSCPDLS... TO 7yt,cOC .L, p0� G'tl 9 KIRITAS COUNTY KZTTZTAiS COUNTY DEPARTMENT OF PUBLIC WORKS Mark Cook, Director CHANGE ORDER JUSTIFICATION & COST ANALYSIS Date: January 5, 2016 Change Order #11 Project Name: Teanaway Paving Project Project Number. RC 1560-B1 Prepared by. Roy Chance, Construction Manager Justification: A significant amount of Hot Mix Asphalt was needed to pre -level the roadway and achieve the design cross slope throughout the entire length of the project. The existing roadway crown was "rounded" and did not support the design cross-section. The additional amount of hot mix asphalt re-establishing roadway crown was not anticipated during final engineering plan preparation. Quantity over runs in beam guard rail, posts, non -flared terminals, anchors, labor and traffic control were also experienced when guardrail sections were added, or field adjusted due tosite conditions not anticipated during final plan preparation. Cost analysis: The contractor offered extensions of unit costs on all material over runs, which was deemed reasonable by Public Works. The unit costs are the same as those submitted by the contractor in the original bid as awarded by the Board of County Commissioners. 411 N. Ruby St., Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 BOARD OF COUNTY COMMISSIONERS COUNTY OF HITTITAS STATE OF WASHINGTON RESOLUTION NO. 2016 - TO APPROVE CHANGE ORDER #11 FOR THE TEANAWAY PAVING PROJECT WHEREAS: The Board of County Commissioners authorized road improvements to Teanaway Road (Resolution 2015-104) in the amount of $3,000,300.00; and WHEREAS: Additional Costs are required for Hot Mix Asphalt, guard rail and other associated items; and WHEREAS: The Contractor has offered unit price extensions for each; and WHEREAS: It has been determined that the Change Order Total is $113,172.43; the Director of Public Works recommends approval of Change Order #11. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve Change Order #11 for the Teanaway Paving Project for the amount of $113,172.43. DATED on this 5th day of January, 2016, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS HITTITAS COUNTY, WASHINGTON Chair Vice -Chair Commissioner ATTEST: Clerk of the Board SHEET 1 OF 2 KITTITAS COUNTYCHANGE ORDER NUMBER DATE: 01/05/16 DEPARTMENT OF PUBLIC SERVICES 11 CHANGE ORDER ® Ordered by Engineer in accordance with Section TO: Granite Construction 1-04.4 of the Standard Specifications 80 Pond Road Yakima, WA 98901 ® Change order proposed by Contractor ENDORSED BY: PROJECT TITLE: Teanaway Paving Project Signature Date Title: Contract No. RC 1560-B1 CONSENT GIVEN BY SURETY: (When required) By: Attorney -in-fact Date DESCRIPTION OF WORK YOU ARE ORDERED TO PERFORM THE FOLLOWING DESCRIBED WORK UPON RECEIPT OF AN APPROVED COPY OF THIS CHANGE ORDER. THE UNDERSIGNED HEREBY PROPOSES TO UNDERTAKE AND COMPLETE THIS IMPROVEMENT, IN ACCORDANCE WITH SAID PLANS, SPECIFICATIONS, AND CONTRACT, AND THE FOLLOWING SCHEDULE OR RATES AND PRICES: This change order facilitates payment to the contractor for quantity over runs in pre -level HMA, culvert installation and additional guardrail. CONTRACT TIME No (0) additional working days are added to this contract due to this change order. ORIGINAL CURRENT CONTRACT ESTIMATED NET ESTIMATED CONTRACT TOTAL CONTRACT AMOUNT AMOUNT CHANGE THIS AFTER CHANGE $3,000,300.00 $3,295,206.38 ORDER $3,408,378.81 $ 113,172.43 APPROVAL RECOMMENDED APPROVED Project Engineer Date Chairperson Date APPROVED Board of County Commissioners Director Date SHEET 2 of 2 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS CHANGE ORDER ESTIMATE Teanaway Paving Project Change Order#11 ITEM BID DESCRIPTION UNIT UNIT PRICE ESTIMATED ESTIMATED NO, MEASCHANGE QUANTITY NO. FROM THE ORIGMAL CONTRACT 51--11 LS $113,172.43 1 $113,172.43 ESTIMATED TOTAL COST $113,172.43