My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res to Approve Change Order No 11 for Teanaway Road Paving Project
>
Meetings
>
2016
>
01. January
>
2016-01-05 10:00 AM - Commissioners' Agenda
>
Res to Approve Change Order No 11 for Teanaway Road Paving Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2018 9:52:14 AM
Creation date
4/7/2018 9:51:57 AM
Metadata
Fields
Template:
Meeting
Date
1/5/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
n
Item
Request to Approve a Resolution and Change Order No. 11 for the Teanaway Road Paving Project
Order
14
Placement
Consent Agenda
Row ID
27208
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />STAFF REPORT <br />AGENDA SESSION DATE: January 5, 2016 <br />ACTION REQUESTED: Approve Change Order # 11 for the Teanaway <br />Paving Project. <br />BACKGROUND: Various quantity over -runs and under -runs, when <br />calculated together, result in a cost over -run total of <br />$113,172.43. <br />Primary contributors to the over -run was the <br />significant amount of Hot Mix Asphalt needed to <br />pre -level the roadway and achieve the design cross <br />slope throughout the entire length of the project. <br />Also significant were quantity over runs in beam <br />guard rail, posts, non -flared terminals, anchors, <br />labor and traffic control made necessary when <br />guardrail sections were added due to previously <br />unanticipated steep side slope conditions. These <br />roadway sections were not identified in the original <br />FHWA topographic survey. <br />All additional work was performed in accordance <br />with appropriate design standards and best <br />engineering practices under the oversight and to the <br />satisfaction of the County Engineer. <br />INTERACTION: Public Works <br />RECOMMENDATION: Motion to approve Change Order #11 for the <br />Teanaway Paving Project. <br />HANDLING: Return a copy of the Resolution to Public Works. <br />Return two copies Change Order #11. <br />ATTACHMENTS: Change Order 411 <br />Justification and Cost Analysis <br />Resolution <br />LEAD STAFF: Roy Chance, Construction Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.