My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res to approve task assignment 26 for Westside Road
>
Meetings
>
2013
>
09. September
>
2013-09-17 10:00 AM - Commissioners' Agenda
>
Res to approve task assignment 26 for Westside Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 11:48:33 PM
Creation date
4/6/2018 11:47:56 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2013
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution Authorizing Signature for a Professional Engineering Task Order for the Westside Road Project and Terminate the Existing Task Assignment Dated July 17, 2013
Order
7
Placement
Consent Agenda
Row ID
10523
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: September 17, 2013 <br />ACTION REQUESTED: Approve and sign the professional engineering task <br />assignment for the Westside Road project and terminate the <br />existing task assignment dated July 17, 2013. <br />BACKGROUND: The County Road Administration Board (CRAB) provides <br />state funding for road improvements projects on a bi-annual <br />basis. <br />Public Works submitted a grant proposal for road <br />improvements to Westside Road. The project is funded. <br />Previously, the safety enhancement project was awarded <br />$3,800,000. Kittitas County withdrew the project from the <br />Rural Arterial Program after CRAB reimbursed the county for <br />$106,052.07. CRAB authorized KCPW to retain these funds <br />provided we commit to pursue improvements that utilize <br />existing preliminary engineering for the project prior to <br />October 2014. <br />Public Works is planning to terminate the existing task <br />assignment for engineering services and assign a new one <br />to complete the design process. <br />On November 10, 2011 the BOCC approved the chair to <br />sign the on-call engineering services contract. On July 17, <br />2012, Board of County Commissioners (BOCC) approved <br />Task Assignment 10 for Sargent Engineers to perform <br />preliminary engineering services amounting to $349,396 of <br />which $83,234.75 was paid leaving $266,161.25. <br />The new Task Assignment 26 for professional services to <br />complete this design was prepared for BOCC approval. This <br />task assignment totals $166,889. The estimate reduction <br />resulted from simplified design requirements. <br />Public Works plans to use road funds to pay for the <br />remainder of the design. <br />INTERACTION: Public Works and Sargent Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.