Laserfiche WebLink
ThyssenKrupp Elevator <br />Americas Business Unit <br />Work Order. <br />Date: <br />02/02/2010 <br />Location: <br />Kittitas County Courthouse <br />Address: <br />205 W 5th Avenue <br />City: <br />Ellensburg, WA 98926 <br />Contract #: <br />1021F00304 <br />Telephone: (509)962-7509 <br />Equipment ID: one Western hydro <br />RWO Title: Power Unit Replacement <br />Purchaser: Kittitas County <br />Contact Name: Matthew Anderson <br />Title: Director Faciities Maintenance <br />Company: Kittitas County <br />Address: <br />205 W 5th Avenue <br />City/ST/ZIP: <br />Ellensburg, WA 98926 <br />Phone: <br />(509)962-7509 <br />Facsimile: <br />(509)962-7086 <br />n <br />Purchaser authorizes ThyssenKrupp Elevator Corporation to perform the following described work on the following elevator(s) <br />in the above building: <br />Power Unit <br />Provide material and labor to remove and replace the existing power unit(s) in the above referenced building. The power unit <br />replacement includes the motor, pump, hydraulic valve, muffler, oil reservoir tank, hydraulic fluid, isolation assembly and all <br />necessary hardware. Existing controller and oil line shall remain and be reused. Price does not include any alterations to the <br />main -line feed. <br />Purchaser agrees to pay the sum of: Seventeen Thousand Seven Hundred Twenty -Eight and 82/100 ($17,728.82) Dollars <br />which includes all applicable taxes. Delivery and shipping is included. All work is to be performed during regular working <br />days and hours, unless otherwise indicated herein. No permits or inspections by others are included in this work, unless <br />otherwise indicated herein. <br />To indicate acceptance of this work order, please sign and return one (1) original of this agreement to the address shown <br />below. Upon receipt of your written authorization and required materials and/or supplies we shall implement the work order. <br />Unless otherwise stated, you agree to pay as follows: 50% upon signed acceptance and 50% upon completion. <br />This Work Order is submitted for acceptance within 30 days from the date executed by ThyssenKrupp Elevator Corporation. <br />Purchaser's acceptance of this Work Order together with the terms and conditions printed on subsequent pages hereof and which are <br />expressly made a part of this proposal and agreed to, will constitute exclusively and entirely the agreement for the work herein <br />described. All prior representations or agreements regarding this work, whether written or verbal, will be deemed to be merged <br />herein, and no other changes in or additions to this agreement will be recognized unless made in writing and properly executed by <br />both parties. This Work Order specifically contemplates work outside the scope of any maintenance contract currently in effect <br />between the parties; any such contract shall be unaffected by this Work Order. <br />No agent or employee shall have the authority to waive or modify any of the terms of this agreement without the written approval of an <br />authorized ThyssenKrupp Elevator Corporation manager. <br />TKE - WO 03/09 Page 1 of 3 <br />