My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:49 PM
Creation date
1/16/2018 12:17:25 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Interagency Agreement with the Federal Highway Administration Authorizing the Reimbursement of Funds to Kittitas County Public Works for the Teanaway Hydraulic Improvement Project
Order
13
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: August 15th, 2017 <br />ACTION REQUESTED: Authorize the Chair's signature on the Interagency <br />Agreement with FHWA authorizing the reimbursement of <br />funds to Public Works for the Teanaway Hydraulic <br />Improvement Project <br />BACKGROUND: In 2014, Public Works submitted an application to the <br />Washington Federal Lands Access Program for Teanaway <br />Road Hydraulics Improvements. <br />In 2016, Public Works executed the final agreement <br />documents from the Federal Highway Administration <br />(FHWA) department awarding $2,432,074 of grant funds <br />for said project. <br />Public Works successfully negotiated a change of scope <br />with FHWA in August of 2016 to change the Hydraulic <br />Improvement locations to address the top two identified <br />maintenance and flood locations. Additionally, Public <br />Works reached out to the Washington State Department of <br />Fish and Wildlife to ensure the proposed project locations <br />also addressed top priorities in the region for fish passage. <br />Following the realignment of the engineering division and <br />the addition of survey capabilities Public Works requested <br />in the spring of 2017 that the delivery method for the <br />design and construction be altered. FHWA agreed to <br />relinquish control of the project delivery and allow these <br />efforts to be conducted in house by Public Works. <br />As a result, the new project is scoped to have a total cost of <br />$2,440,221 with the County responsible for $329,430 in <br />match funds. Public Works has recently finalized the <br />Memorandum of Agreement with FHWA and received the <br />Interagency Agreement (reimbursable agreement) from <br />FHWA for signature. This agreement has been reviewed <br />and approved by the County Legal team. <br />Once the Agreement has been executed Public Works will <br />seek to execute task orders with the current on call <br />engineering support staff to assist in the environmental <br />permitting, hydraulic modeling and structural design needs <br />for the project. Extensive public outreach and coordination <br />
The URL can be used to link to this page
Your browser does not support the video tag.