Loading...
HomeMy WebLinkAboutCle Elum-capital project-WSHPSMALL -SCALE -CAPITAL -PROJECT -LT -2017 -01 -CLE ELUM-WSHP 2017 LODGING TAX SERVICES AGREEMENT BETWEEN KITTITAS COUNTY AND THE CITY OF CLE ELUM This Contract, effective August 1, 2017 is made and entered into by and between KITTITAS COUNTY ("County"), a subdivision of the State of Washington, and the City of Cie Elum ("Contractor"). WHEREAS, the purpose of this Agreement is to provide for Tourism -Related, Small -Scale Municipality -Owned Capital Projects relating to activities and expenditures designed to increase tourism, NOW THEREFORE, in consideration of the terms and conditions contained herein, or attached and incorporated and made a part hereof, the County and the Contractor mutually agree as follows: Section 1. Scope of Work. a. Contractor shall provide the services and staff described in its Application for Lodging Tax Funds submitted to the Lodging Tax Advisory Committee, attached hereto as Exhibit "A" which is attached hereto and incorporated herein by this reference. b. Except as otherwise specifically provided in this Agreement, Contractor shall furnish the following as required to perform the services, described in Paragraph (a) above, in accordance with this Agreement: Personnel, labor and supervision; technical, professional and other services. All such services, property and other items furnished or required to be furnished, together with all other obligations performed, or required to be performed, by Contractor under this Agreement are collectively referred to herein as "Services." Section 2. Pa meet. a. As full compensation for satisfactory performance of the Contractor's Services, the County agrees to pay Contractor the sum of fifteen thousand dollars ($15,000.00) to be used for capital project- Tractor for the Washington State Horse Park. b. Additional payment terms: The County will make payment to the Contractor only on a reimbursement basis, as receipts for any items are submitted to the County, not to exceed the sum of fifteen thousand dollars ($15,000.00) to be used for capital project -Tractor for the Washington State Horse Park. c. Services/Expenses that are reimbursed must be dated during the 24 (twenty-four) months (or two years) of the date of the Agreement and final date to submit reimbursements requests is August 1, 2019 after this date funds lapse. d. Requests for reimbursements must be submitted to: Kittitas County Auditor County Lodging Tax Funding Agreement Page 1 Attn: Judy Pless 205 West 5th Ave —Suite 105 Ellensburg, WA 98926 auditoraccountii co.kittitas.iva.us e. Reporting requirements of your events will be required on prescribed forms from the County Auditor. Section 3. Performance by Contractor. a. Contractor shall not (by contract, operation of law or otherwise) delegate or subcontract performance of any Services to any other person or entity without the prior written consent of the County. Any such delegation or subcontracting without the County's prior written consent shall be voidable at the County's option. b. Contractor shall at all times be an independent contractor and not an agent or representa- tive of the County with regard to performing the Services. Contractor shall not represent that it is, or hold itself out as, an agent or representative of the County. In no event shall Contractor be authorized to enter into any Agreement or undertaking for or on behalf of the County. It is understood that the Contractor and the Contractor's staff and employees are not employees of the County and are not, therefore, entitled to any benefits provided employees of the County. c. Contractor shall comply with all applicable laws, ordinances, rules, regulations, orders, licenses, permits, and other requirements, now or hereafter in effect, of any governmental authority (including, but not limited to, such requirements as may be imposed upon the County and applicable to Services). Contractor shall furnish such documents as may be required to effect or evidence such compliance. All laws, ordinances, rules, and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference. Contractor agrees to obtain all required licenses and permits, and further agrees to keep them in full force and effect during the term of this Agreement. d. The County and the Contractor agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of race, creed, color, national origin, age, sex, marital status, or the presence of a physical, sensory, or mental handicap. e. The Services shall at all times be subject to inspection by and approval of the County, but the County's making (or failure or delay in making) such inspection or approval shall not relieve Contractor of its responsibility to perform the Services in accord with this Agreement, notwithstanding the County's knowledge of defective or non -complying performance, or the substantiality or ease of discovering the same. Contractor shall provide the County with sufficient, safe, and proper facilities and equipment for such inspection and free access to such facilities. f. This contract is subject to review by any Federal or State auditor. Contractor shall promptly furnish the County or its designee, or such Federal or State auditor with such information related to the Services as may be requested by the applicable governmental entity. County Lodging Tax Funding Agreement Page 2 Contractor shall preserve and maintain all financial records and records relating to performance of Services under this Agreement for six (6) years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Contractor shall provide the County access to (and the County shall have the right to examine, audit and copy, with or without notice) all of Contractor's books, documents, papers and records related to the Services or this Agreement. g. Contractor understands and acknowledges that Contractor is solely responsible for its own reporting and accounting of all state, federal, social security, and local taxes, of every nature, arising from Contractor's performance of this Agreement. All compensation received by the Contractor will be reported to the Internal Revenue Service at the end of the calendar year in accord with the applicable IRS regulations. Section 4. Release, Indemnity, and Held Harmless. The County assumes no liability for the Contractor's actions under this Agreement. Contractor releases and shall defend, indemnify, and hold harmless the County, its officers and employees, agents, representatives, attorneys and/or volunteers, from and against all claims, costs, liabilities, damages, and expenses, (including, but not limited to, reasonable attorney fees) which arise or may arise or be alleged to arise out of or by reason of this Agreement including: ■ Any fault, negligence, strict liability or product liability of Contractor in connection with the Services for this Agreement; • Any lien asserted upon any property of the County in connection with the Services for this Agreement; • Any failure of Contractor, or of the Services, to comply with any applicable law, ordinance, rule, regulation, order, license, permit and other requirement, now or hereafter in effect, of any governmental authority; or • Any breach of or default under this Agreement by Contractor_ Section 5. Compliance with Public Records Law. a. In compliance with Washington's public records law, the County will retain copies of any documents associated with this Agreement, which may be required by law unless legally exempt from such retention, for any applicable legally required retention period. b. In the event a public records request is made to the County for documents created in relation to this Agreement, should legal uncertainty arise regarding the disclosability of any documents under federal or state public records laws, the County shall provide notice to Contractor pursuant to Washington's public records act, chapter 42.56 RCW, to allow Contractor to seek a court injunction. c. The County specifically shall not be liable to Contractor for the County's release under public records laws of any documents not protected by trademark, copyright or other law. County Lodging Tax Funding Agreement Page 3 Section 6. Industrial Insurance Waiver. With respect to performance of this Agreement and as to any claims against the County, its Additional Insureds, officers, agents and employees, the Contractor expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to Contractor's employees and agrees that the obligations to indemnify, defend and hold harmless provided in this Agreement extend to any claim brought by or on behalf of any employee of the Contractor. This waiver is mutually negotiated by the parties to this Agreement. Section 7. Insurance and Endorsements. a. The County may require through a request in writing that the Contractor provide the County with a certificate, binder, or policy of liability insurance, acceptable to the County in an amount specified by the County. b. Such liability insurance shall be such as will protect Contractor, its employees, agents and representatives, from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (including death) or property damage that may result from performance of the Services or this Agreement, whether such performance is by Contractor or any of its employees, agents or representatives. c. Should the County require such liability insurance, the Contractor agrees to provide proof of insurance prior to commencing performance of this Agreement. d. Copies of the County's written request and the insurance documents provided by Contractor shall be attached to this Agreement and by this reference will be made part hereof. e. Where insurance is requested by the County, all liability insurance policies shall be endorsed to include the County as an Additional Insured and shall stipulate that the insurance afforded by the policies shall be primary insurance, and that any insurance, self-insured retention, deductibles, or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Contractor shall furnish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect. Section 8. Termination. The County may, by written notice thereof to Contractor, terminate this Agreement as to all or any portion of the Services not yet performed, whether or not Contractor is in breach or default. Upon receiving such notice of termination, Contractor shall, except as otherwise directed by the County, immediately stop performing the Services to the extent specified in the notice. In the event the County terminates the Contractor's Services, the Contractor is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Contractor, if any, as of the date of the notice of termination. Section 9. Miscellaneous. County Lodging Tax Funding Agreement Page 4 a. Contractor shall not (by contract, operation of law or otherwise) assign this Agreement or any right or interest in this Agreement without the County's prior written consent. b. This Agreement embodies the entire Agreement between the County and Contractor, and supersedes any and all prior oral or written communications, proposals, conditions, promises, representations, or understandings regarding the Services. No change, amendment or modification of any provision of this Agreement shall be valid unless set forth in a written amendment to the Agreement signed by both parties. c. Notice for any purpose under this Agreement, except service of process, shall be given by the Contractor to the Kittitas County Commissioners and the Kittitas County Auditor, 205 West 5th Ave. Ellensburg, WA 98926. For all purposes under this Agreement, any notice by the County to the Contractor shall be given to the Contractor's address provided on the signature page. Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage prepaid, certified mail, return receipt requested. d. The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict, affect or be of any weight in interpreting or construing the provisions of such sections or paragraphs. e- This Agreement may be executed in one or more counterparts and by facsimile, each of which will be deemed an original, but all of which together will constitute one and the same instrument. f. Contractor warrants to the County that the individual signing on Contractor's behalf has the requisite power and authority to enter into and to perform Contractor's obligations under this Agreement. Contractor further warrants to the County that Contractor has made no misrepresentation or misleading statement in connection with this Agreement, and is not in violation of any applicable law, ordinance, or regulation the consequence of which will or may materially affect Contractor's ability to perform its obligations under this Agreement. g. If any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect the other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Agreement are declared severable. h. The exclusive venue for any action brought to enforce this Agreement or any of its terms shall be in Kittitas County, State of Washington. KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS CONTRACTOR Chair Vice Chair [Print Name] County Lodging Tax Funding Agreement Page 5 Commissioner ATTEST: Clerk of the Board APPROVED AS TO FORM: Deputy Prosecuting Attorney [Address] [Telephone] County Lodging Tax Funding Agreement Page 6 EXHIBIT "A" �.. APPLICATION FOR LODGING TAX FOR TOURISM -RELATED, SMALL. -SCALE MUNICIPALITY -OWNED CAPITAL PROJECTS AND OPERATIONS Applicant Information: Ca ital Proiect or qaetions (Circle One or Both) Name of Municipality: City of Cle Elum, WA JUN 2 Mailing Address: 119 West First St. Cle Elum, WA 98922 Contact Person and Title: Robert Omans, City Administrator Phone: (509) 674-2262 Email: robert@cityofcleelum.com Project Title: Tractor for Washington State.Horse Park Project Location: 1202 Douglas Munro Blvd, Cle Elum, WA 98922 Funding Request: $15,000 Application Requirements X 1. The project qualifies for lodging tax funds as a capital expenditure of a tourism- related facility owned or operated by a municipality or is supporting the operations of tourism - related facilities owned or operated by a municipality. X 2. The municipality has submitted no more than two applications for capital project funding in the current year. X 3. The municipality's lodging tax advisory committee (or equivalent) has been informed of the project and endorsed it (not required for Kittitas County). A letter from the municipality is included. X 4. Lodging tax capital project funds are not being substituted for other funds that are already secured or applied for (if applicable). X 5. Municipality has secured matching funds of at least 50% of the total project costs. X 6. A completed project budget is included in the application (if applicable). X 7. A detailed 8 1/2 X 11 vicinity map that clearly shows the project is included (if applicable). Tourism -Related, Small -Scale Municipality -Owned Capital Project Narrative Project Description: Please describe the project in detail. Indicate the major work to be completed, any milestones that need to be overcome for the project to move forward, and include a comparison of existing and proposed conditions. The Washington State Horse Park ("the Park") operates on 112 acres owned by the City of Cie Elum, plus an additional 110 acres owned by Suncadia and managed by the Kittitas Conservation Trust. The Park uses a tractor to operate and maintain its extensive facilities on a day to day basis and during more than 40 events each season. These tasks include: a. Grooming four competition arenas that total 170,000 sq ft plus 20,000 sq ft of exercise "lunge pads" multiple times each day when in use b. Transporting, bedding and manure for up to 300 stalls c. Moving shavings bags, gravel, logs and other materials around the property d. Lifting equipment, offloading deliveries, relocating port -a -johns, etc. e. Moving more than 75 large jumping obstacles around five cross country courses The Park's ability to swiftly and efficiently complete these tasks is paramount to successfully managing and hosting its customers' activities. Currently, all of these tasks are handled by one 105 horsepower ("HP") tractor owned by the Park. Occasionally Park management is able to leverage personal connections to borrow a tractor, and sometimes even rent tractors if available. But usually those tractors are too small (30-45 HP) and are not capable of handling the heavy commercial tasks of the Park. The Park's current tractor is often used continuously throughout the day, causing event activities to be delayed waiting for it to become available. For example, the delivery of shavings to customers is frequently late because the arenas are being dragged and prepared for the show. In some extreme situations, a major mechanical issue causes all tasks to stop, creating predictable displeasure. At least two large event organizers have opted to borrow tractors or loan their own equipment in order to get things done at the Park. The Park has reached a size that a second tractor is required to keep up. The equipment needs to be of sufficient strength, at least 60 HP, to handle routine tasks. There is growing frustration from event organizers, participants, spectators, volunteers and Park staff about delays and an inability to service customer needs. This proposal seeks $15,000 toward acquiring a good quality, pre -owned 60-70 HP tractor. Based on research and discussions with the local John Deere dealership, the Park has determined that such a tractor with delivery and sales tax should cost about $30,000. The tractor will be maintained by the Washington State Horse Park Authority as part of its lease agreement with the City of Cie Elum. 2. Kittitas County Tourism Infrastructure Plan: Please explain how the project meets the goals and priorities in the Kittitas County Tourism Infrastructure Plan as adopted. Also, describe the specific county tourism infrastructure needs the project addresses and how the project directly increases tourism. Explain how the improvements will promote tourism in Kittitas County and indicate specifically how the improvements will directly increase economic activity resulting from tourists (see the definition of tourist on page 3 of this application). Action 5, The WA State Horse Park Master Plan, ranks as the only high priority in the Recreational Tourism category of the Kittitas County Tourism Infrastructure Plan. Acquisition of a second tractor is critical to customer service of the Park. This project aligns with the following goals of the Tourism Infrastructure Plan: Goal 1: Develop and maintain integrity of place. The WA State Horse Park is an asset for recreation that distinguishes Kittitas County from other areas and engenders local community pride. The statewide park was sited here as the, preferred location by the state legislature. It is the region's premier equine facility, attracting some 27,000 visitors (2015), 93% of whom reside outside our County (annual Horse Park surveys). Goal 2: Be market selective. The Horse Park encourages growth in a highly -valued tourism market segment, attracting families. Four percent of Washington residents are engaged in equestrian activities (WA State Recreation and Conservation Office 2006). Washington ranks among the top 11 states for horse ownership, with 250,000 horses. Fully 85% of equestrian eventers are women; women drive over 92% of all vacation planning decisions for their families (source: Greenfield Online Marketing Insights). Nearly 40% of equestrian eventers report net household income exceeding $500,000. The equestrian market offers extraordinary potential for Cie Elum and Kittitas County as a recreational tourism destination. Goal 4: Satisfy tourists. Delay in meeting deliverables is damaging to customer relationships and eventually to our ability to satisfy our clients. Horse Park participants of all disciplines actively use social media to promote and share their stores of events, competition standings, and stabling facilities. Meeting this requirement for first class customer service and facility management will ensure that visitors share the very best stories about the destination and their experiences while visiting the county's premier equestrian competition asset. This project will directly impact tourism activity and numbers. In 2017, the Horse Park will host 40 prestigious events of all disciplines from cross-country to horse clinics, hunter/jumper shows, carriage -driving, rodeo and more; 30,000 participants and spectators are anticipated in 2017, accounting for over 9,000 lodging nights (Horse Park surveys, Dean Runyan Assoc.). The Park competes with other facilities in the state and region to host these events and relies on its reputation to book them. Our ability to maintain excellent customer service and to continue secure new customers relies heavily on our ability to professionally and quickly execute these basic operational tasks. Negative experiences concerning services and maintenance has affected Park event participation this year and it is feared that event bookings will be strongly impacted if our inability to meet customer expectations continues. 3. Use of Grant Funds: Please explain exactly how the requested funds will be used. Include an itemized list. To purchase a good quality, pre -owned 60-70 HP Tractor with minimum 3 -point hydraulics and 2 wheel -drive. 4. Real Property: If real property acquisition is a component of the project, please explain. Include any information of property already secured or evidence of the ability to secure the real property. N/A 5. Capital Assets: If capital asset acquisition is a component of the project, please explain. Include any bids solicited and received from potential vendors willing to supply the asset. All capital asset purchases require at least three bids. If you have already selected one of the bids, please provide justifications in writing. Attached are descriptions and prices for three used tractors in the 60-70 HP based on research on-line and with Washington Tractor in Ellensburg. These prices range from a low of $21,500 to a high of $40,000 reflecting each tractor's age, condition, features and hours of use. The Park believes that once funds are available it should be able to locate and purchase an appropriate tractor for $30,000. 6. Coordination: Please explain how this project has been coordinated with other jurisdictions as well as affected stakeholders. Please include letters of support from stakeholders. The City of Cie Elum has worked with the Horse Park Board and Authority to define this project as a priority and secure its support. Now in its seventh season of operations, the Park communicates extensively with users and discipline specialists, monitoring social media, and surveying visitors. Attached are letters of support from two organizers of the Park's larger events that attract thousands of daily visitors during five weeks each season, as well as a letter from the President of the Authority Board. 7. Studies: Please attach any feasibility or other studies that demonstrate linkages between the proposed project and the anticipated tourism impacts. Also please include your operations/maintenance funding strategy and business plan for long-term project sustainability (how the facility or facilities will be operated and maintained for at least three years following completion). With funding from the state legislature in 1986, the Washington State Department of Agriculture completed a study recommending the creation of an equestrian center to "promote and serve the recreational horse industry in the state and provide economic benefits through equine activities." In 1995, the state legislature passed RCW 67.18 (recodified 79A.30), to create the framework for the facility, authorizing the Horse Park Authority to establish "3) a first-class horse park facility in Washington to,meet the important needs of the state's horse industry, attract investment, enhance recreational opportunities, and bring new exhibitors and tourists to the state from throughout the region and beyond; and 4) A unique opportunity exists to form a partnership between state, county and private interest to create a major horse park facility that will provide public recreational opportunities and statewide economic and employment benefits." The Financial Feasibility and Economic Impact of the Washington State Horse Park (FFEI- WSHP) study was conducted by Central Washington University in 2006 (attached to this application). Legislative support continued with appropriation of $3.5 million in the 2007- 2009 capital budget for Phase I of construction of the Horse Park. The work included completion of design, development, permitting and engineering components, as well as the more visible site clearing, road grading and utility improvements the site required in preparation for constructing the arenas and other revenue generating facilities. In an Oct 12, 2009 posting on houserepublicans.wa.gov, Rep. Judy Warnick included in the list of reasons for her support: "Most of all, these facilities will help the local economy and provide much-needed jobs." This view by the state legislators was reinforced most recently by Senator Holquist Newbry on April 22, 2013 on the same website. The WA State Horse Park manages an annual operating budget of $473,000, employs a seasonal maintenance crew that operates and maintains all Park equipment. The Park also benefits from "work parties" comprising up to 20 volunteers. 8. Project Readiness: Please provide a detailed project schedule, including milestones necessary for completion as mentioned in question 1 above. On the schedule, indicate items completed and exactly where in the schedule the project is at this time. Be sure to include expected completion date. The Park is ready to actively acquire and use a pre -owned tractor as soon as funding is available. Tourism -Related, Small -Scale Municipality -Owned Capital Project Budget All applicants for capital project funding must supply -a detailed and complete project budget utilizing the following basic format: WA State Horse Park Tractor Funding Sources Lodging Tax Funds Request $ 15,000 Other Grant Funds (list by source) $ - Other Local Government Funds (list by source) $ - Private Funds $ 15,000 In -Kind Support $ Total Available Funding $ 30,000 Project Expenses Hard Costs $ 30,000 Soft Costs Total Project Costs $ 30,000 Matching Funds as % of Total Costs: 50% The Park currently has $10,000 in restricted funds available for this project, and a pledge for another $5,000 from a private donor. *Verifying documentation must be provided and attached to this budget. This documentation may include award letters, letters of commitment, or loan approval documentation. You must include this in order to meet the matching funds requirement. If the funding source includes applicant funds, proof of available funding in the form of a letter of commitment from an authorized body or representative of the applicant is adequate. 9. Applicant Certification: Please sign below in agreement with statement of certification. Certification is hereby given that the information provided is accurate and the applicable attachments are complete and included as part of the application package. I further certify that the application thresholds are met at the time of application. Jay McGowan 6.2.3-/7 Mayor, Date City of Cle Elum, WA Tourism -Related Facility Operational Funding Narrative (Municipality Applications Only) 1. Operational Spending: Please explain your request for operational funding and how it is directly related to supporting the operations of a tourism -related facility owned or operated by a municipality or public facilities district. 2. Sustainability Strategy: Please describe your strategy for long-term operational sustainability. Include any specific progress toward this goal. 3. Applicant Certification: Please sign below in agreement with statement of certification. Certification is hereby given that the information provided is accurate and the applicable attachments are complete and included as part of the application package. I further certify that the application thresholds are met at the time of application. Signature of Official Representative Title Date Lodging Tax Capital Project Rating Form Criteria Points Possible Application Questions Points Awarded Low Priority = 5 iKittitas County Tourism Infrastructure Plan Medium Priority = 15 Q High Priority = 20 --------- :Stakeholder Support Up to 5 +Q Feasibility Analysis and Business Plan Yes = 1S �Q Completed No = 0 Promotes Tourism/ Increases Economic Up to 20 Activity Resulting From Tourists Project Readiness piicant's Matching Funds ................. Up to 20 Up to 20 Less than 50% = 0 50% - 55% = 5 56% - 59% = 10 60%-70%= 15 71% or more = 20 estion 2 ion 6 ion 7 Question 2 estion 8 Capital Project Budget eeE&M 119 West First Street Cle Elum, WA 98922 June 22, 2017 -- PP C". ,%4F. - Telephone: (509) 674-2262 Fax: (509) 674-4097 www.cityofcieelum.com Kittitas County Board of Commissioners Attn: County Lodging Tax Advisory Committee Lodging Tax For Tourism -Related, Small -Scale Municipality -Owned Capital Projects And Operations 205 West 5th Avenue, Suite 108 Ellensburg, WA 98926 Dear Commissioners: The Cie Elum Lodging Tax Advisory Committee hereby expresses support of the City's 2017 application for Lodging Tax for Tourism -Related, Small -Scale Municipally -Owned Capital Projects and Operations application to purchase a good quality pre -owned Tractor to be used by the Washington State Horse Park. The Horse Park is a significant driver of tourism for the City of Cie Elum and beyond. We endorse the Park's continued success and growth in local, state and regional tourism activities and priorities. As that role expands and its facilities grow, the Park needs more equipment and other resources to maintain its reputation as a first class venue. If funded by the requested grant, a pre -owned Tractor will significantly enhance the Park's ability to achieve Its mission and serve its customers. Dated and signed this 22nd Day of June, 2017 .000�� � Steven Harper, Chairman City of Cie Elum Lodging Tax Advisory Committee C.r'SGC'L�e 1-1016F SHOWS June 22, 2017 Kittitas County Board of Commissioners Attn: County Lodging Tax Advisory Committee Lodging Tax for Tourism -Related, Small -Scale Municipality -Owned Capital Projects and Operations 205 West 5th Avenue, Suite 108 Ellensburg, WA 98926 Dear Commissioners: We are Cascade Horse Shows LLC, a Hunter Jumper Show company that puts on 2 USEF National Horse Shows and 1 USEF Regional horse show at the Washington State Horse Park each year. Our shows are the biggest at the horse park and bring in 150 to 300 horses and accompanying trainers, grooms, friends and family providing a very positive impact on the local economy. We run 4 rings simultaneously for 6 days at each of the shows. Dragging each arena takes 20 to 30 minutes each. In order to keep our ring schedule on time and running smoothly and the footing in top condition, we require the use of 2 tractors and drags. The horse park now provides only 1 tractor and drag. The 2nd tractor we borrow from a nearby farmer. Doing this has many downsides. It requires both time and expense to pick up and return the tractor. The liability for using the tractor and the wear and tear are a huge risk. To rent a tractor is very expensive and beyond our budget. Growing our shows in the future requires the right equipment and having a tractor onsite and owned by the horse park would alleviate all of these problems and help the shows immensely with cost, efficiency and meeting the needs of our competitors. Best regards, Nasi y Lewis Managing Partner Cascade Horse Shows LLC 9z3 zi1'Avc B Seat lc,NA,'A 98iiz 4z5.503.5o6i June 22, 2017 Kittitas County Board of Commissioners Attn: County Lodging Tax Advisory Committee Lodging Tax For Tourism -Related, Small -Scale Municipality -Owned Capital Projects And Operations 205 West 5th Avenue, Suite 108 Ellensburg, WA 98926 Dear Commissioners: I am on the Board of Equestrians Institute, a non-profit organization that puts on two 3 -day horse trials each season at the Washington State Horse Park. These events take several weeks of preparation, including moving large cross country jumps and other materials around 200 acres of competition tracks on two different parcels of land. At the event we attract about 250 horses and related visitors for four days, while using all the Park's arenas. The Park's tractor is critical to our activities, but it is not adequate to serve all these requirements. We have had to borrow tractors owned by volunteers and other personal friends in order to get all the work accomplished and meet necessary timetables. Borrowing a tractor is unprofessional and risky since the equipment is unfamiliar and riot always up to the task. On the other hand, renting a tractor is not always possible and requires minimum hours that we cannot afford. Please approve funding for the purchase of a good quality, used tractor to meet the Park's needs, allow us to accomplish more in less time and provide an opportunity to take more entries for our events. Meika Decher, Eventing Board Member Equestrians Institute -A� WASHINGTON STATE HORSE PARK June 22, 2017 Kittitas County Board of Commissioners Attn: County Lodging Tax Advisory Committee Lodging Tax For Tourism -Related, Small -Scale Municipality -Owned Capital Projects And Operations 205 West 5th Avenue, Suite 108 Ellensburg, WA 98926 Dear Commissioners: The Washington State Horse Park Authority Board acknowledges that the City of Cle Elum has made Application for Lodging Tax for Tourism—related, Small-scale Municipality -owned Capital Projects for the purchase of a second Tractor to meet growing demands. The Horse Park hosts over 40 events each season, several of which utilize all of the Park's competition facilities on up to 230 acres, and require as many as 300 stalls for many days in a row. The Park owns just one tractor to meet a wide variety of needs from bedding and cleaning stalls to moving gravel and other materials, pulling equipment to groom arenas, lifting heavy objects, blading ground and many other tasks. These same demands occur on a day-to-day basis. Often these are conflicting priorities that should be handled at the same time. The time it takes to wait until the tractor is available is inefficient for Park staff and causes frustration and dissatisfaction with our customers. Yet having to rent a second tractor is very expensive and borrowing one of sufficient horsepower is impractical for prolonged, heavy use. I strongly urge you to approve funding for the purchase of a good quality, pre -owned Tractor to meet the Park's growing facility and customer needs. This will allow the Park to maintain and grow current events and attract new activities and visitors while providing a high level of service. Sincerely, Todd D. Trewin, President Washington State Horse Park Authority Board 501c(3) Organization Tax ID # 33-1197391 PO Box 278 Cle Elum, WA 98922 877-635-4111 wahorsepark.org 6/23/2017 WASHINGTON STATE NURSE PARK quotes 1 message Washington State Horse Park Mail - quotes Zack Olson <zolson@washingtontractor.com> To: "director@wahorsepark.org" <director@wahorsepark.org> Leslie Thurston <director@wahorsepark.org> Thu, Jun 22, 2017 at 4:15 PM There is a 5083en that was recently sold for 26,500 excluding tax. This was a 2010 with 2700 hours on it, low tread, front weights, and 2 scv hydraulic hookups. These are just to give examples of the range in pricing. Given if we have something in that fits your needs I would expect 20-30,000. All depending on what model, condition, year, attachments, etc. I hope this helps. This e-mail is covered by the Electronic Communications Privacy Act, 18 U.S.C. 2510-2521 and may be legally privileged. This communication, together with any attachments hereto or links contained herein, is for the sole use of the intended recipient(s) and may contain information that is confidential or legally protected. If you are not the intended recipient, you are hereby notified that any review, disclosure, copying, dissemination, distribution or use of this communication is STRICTLY PROHIBITED. If you have received this communication in error, please notify the sender immediately by return e-mail message and delete the original and all copies of the communication, along with any attachments hereto or links herein, from your system. IRS CIRCULAR 230 DISCLOSURE: Tax advice contained in this communication (including any attachments) is neither intended, nor written to be used, and cannot be used, to avoid penalties under the Internal Revenue Code or to promote, market or recommend to anyone a transaction or matter addressed in this communication. ------------------------------------------------------------ ------------------------------------------------------------ 2 attachments in 2015 5065e with h240 loader.pdf 35K carraro.pdf 35K https:Hmail.gocgle.com/mail/ca/u/0/?ui=28jk=57cO65b2-/&jsver=VO 5girutes.en.&view=pt&search=inbox&th=15cd216837e65Ac.Q&s1ml=15cd21U37e654e9 1/1 JOHN DEERE Prepared For: Equipment Summary 2008 CARRARO TN8400 - 72876003172 Equipment Total Salesperson : X Quote Summary Prepared By: Zack -s1259 Olson Washington Tractor, Inc. 3110 Fruitvale Blvd Yakima, WA 98902 Phone: 509-452-2880 zolson@washingtontractor.com Quote Id: 15592671 Created On: 22 June 2017 Last Modified On: 22 June 2017 Expiration Date: 30 June 2017 Selling Price $ 19,900.00 X Quote Summary Equipment Total LICENSE FEES SubTotai Sales Tax - (8.20%) Est. Service Agreement Tax Total Down Payment Rental Applied Balance Due Confidential Qty Extended 1 - $ 19,900.00 Accepted By: X $ 19,900.00 $ 19,900.00 $ 0.00 $ 19,900.00 $ 1,631.80 $ 0.00 $ 21,531.80 (0.00) (0.00) $ 21,531.80 6/23/2017 2009 Kubota M7040HD Tractor - Lynden, WA i Machinery Pete . -- I —... %-1 Find Used Equipment (https://www.machinerypete.com/) > Tractors (https://www.machinerypete.com/tractors) > 40-99 HP (https://www.machinerypete.com/tractors/40-99-hp) > Kubota (https://www.machinerypete.com/tractors/40-99-hp/kubota) > M704OHD (https://www.machinerypete.com/tractors/40-99-hp/kubota/m7O4Chd) 2409 Kubota M7044HD Tractor 1 $25,004 ci Save Seller Scholten's Equipment, Inc. - Lynden (/store/scholten-s-equipment-inc-lynden) Lynden, WA Driving Directions (http://maps.google.com/?q=8223 Guide Meridian, Lynden, Washington, 98264) 9 rw' �.twees (/store/scholten- s- equipment- inc-lynden) Mike Scholten (800) 433-5480 Ow Email Seller Key Specifications Drive: 4 WD HP: 67 Hours: 122 https M".machirierypete.com/details/40-99-hp/2009/kubota/m7O4Ohd/187..2867 1/2 JOHN DEERE Quote Summary Prepared For: Prepared By: Zack -s1259 Olson Washington Tractor, Inc. 3110 Fruitvale Blvd Yakima, WA 98902 Phone: 509-452-2880 zolson@washingtontractor.com Quote Id: 15592671 Created On: 22 June 2017 Last Modified On: 23 June 2017 Expiration Date: 30 June 2017 Equipment Summary Selling Price Qty Extended JOHN DEERE 2015 5065E Utility $ 37,000.00 X 1 = $ 37,000.00 Tractor - 1 PY5065EVFY111604 Equipment Total Salesperson: X Quote Summary Equipment Total LICENSE FEES SubTotal Sales Tax - (8.20%) Est. Service Agreement Tax Total Down Payment Rental Applied Balance Due Confidential Accepted By: X $ 37,000.00 $ 37,000.00 $ 0.00 $ 37,000.00 $ 3,034.00 $ 0.00 $ 40,034.00 (0.00) (0.00) $ 40,034.00