HomeMy WebLinkAboutResolutiontoApproveTaskOrder8KPFFKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: July 18th, 2017
ACTION REQUESTED: Approve the Chairman's Signature on Formal Task Order
Document Number 008 with KPFF Consulting Engineers
BACKGROUND: Public Works was awarded Rural Arterial Program (RAP)
funds from the County Road Administration Board
(CRAB) for the replacement of the No. 6 Road Bridge in
2013.
The bridge replacement project over Town Ditch was
awarded $684,900 of RAP funds. The bridge was built in
1955 and rebuilt in 1963 and at the time of the grant
application the bridge had a poor sufficiency rating of
27.82. Additionally the bridge is approximately four feet
narrower then the road approach on either side.
The cost for engineering services has been negotiated with
KPFF Consulting Engineers for the structural design of the
replacement. Public Works is in agreement that a not to
exceed $87,500.00 is a fair cost for delivery and will keep
the project at budget.
Currently the schedule for deliver indicates design will be
completed March 2018 with advertisement and award for
construction commencing May 2018. It is anticipated that
construction for the replacement bridge will occur Fall
2018 through Spring 2019.
INTERACTION: Public Works
RECOMMENDATION: Move to approve the Chairman's Signature on Formal Task
Order Document Number 008 with KPFF Consulting
Engineers
HANDLING: Return one (1) copy to Public Works
ATTACHMENTS: Formal Task Order Document Number 008
LEAD STAFF: Lucas Huck, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2017 -
TO AUTHORIZE THE CHAIRMAN'S SIGNATURE ON FORMAL TASK
ORDER DOCUMENT NUMBER 008 WITH KPFF CONSULTING ENGINEERS
WHEREAS: Public Works was awarded Rural Arterial Program (RAP) funds from the
County Road Administration Board (CRAB) for the replacement of the
No. 6 Road Bridge in 2013; and
WHEREAS: The bridge replacement project over Town Ditch is expected to have a
total cost of $684,900; and
WHEREAS: KPFF Consulting Engineers was selected as a civil on call consultant and
is under contract with Public Works through agreement number KCPW
2017-19ENG2; and
WHEREAS: Kittitas County Public Works negotiated Task Order Number 008 with
KPFF Consulting Engineers to perform the structural design of the
replacement structure; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in
the best interest of the public, does hereby authorize the Chairman's
signature on Task Order Document Number 008 with KPFF Consulting
Engineers, as attached.
DATED on this 18th day of July, 2017, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Paul Jewell, Chairman
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Obie O'Brien, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
Formal Task Order Document
(KPFF)
Task Order Number 008
Maximum Amount Payable $87,500 Completion Date
3/31/2019
The general provisions and clauses of Local Agency Agreement Number (KCPW 2017-
19ENG2) shall be in full force and effect for this Task Order.
Location of Project: Kittitas County
Project Title: Road 6 Bridge Design (PS&E)
Description of Work:
Kpff shall perform the engineering analysis and design of the Road 6 Bridge to prepare for
bidding advertisement date of April 2018.
Scope of Work:
Perform appropriate analysis and design calculations in accordance with the general and specific
guidelines and specifications as contained in the WSDOT Bridge Design Manual (BDM) and if applicable
or necessary to the LRFD AASHTO Design Specifications, and the Local Agency Design Manual. In all
cases the most current edition, manual, guidelines or specifications shall provide criteria and minimal
guidelines as required to meet all FHWA funding requirements.
The work and fee are divided into 4 segments:
Mana eg ment
The specific line items are provided in the Consultant Fee Determination sheet. In general Kpff will
manage the development of the PLANS, SPECS & ENGINEERING COST ESTIMATE (PS&E) in such
a manner to ensure the County is able to achieve the desirable bidding date. This effort will include
appropriate in-house duties such as invoicing, contract compliance assurance, file and staff organization,
client communications (emails and telephone), and general project oversight and coordination of concepts
to be followed in design, staffing, schedule and progress management.
nocx_.�
ac °"sc the co
KITTITAS COUN7V
DEPARTMENT OF PUBLIC WORKS
KITTITAS COUNTY
Meetings
One meeting is budgeted at the County either on site or at the Public Works Office in Ellensburg.
Brid eg Design & Development of Contract Documents
Perform all analysis, design and development of the plans, specifications, and engineer's cost estimate to
be used for the construction of the bridge and serve as the basis of the contract bid documents.
Perform the necessary quality assurance and checks as deemed appropriate for this project.
Provide load rating for bridge upon completion of the design or construction as requested by County.
Estimate 10-11 plan sheets.
Civil Design & Development of Contract Documents
• Develop plans and drawings as needed for final profile, super elevation, roadway cross-sections
on the north and south approach and driveway grades, detour plan and temporary erosion control.
• Assist to write deviations as needed for the potential guardrail alignments and radius.
• Review and assist in guardrail design and layout.
• Develop / advise on specs related to civil items including cost estimate.
Construction Support
Provide on-call construction support services as requested by the County. At this time Kpff assumes we
will perform shop -drawing reviews, some RFI reviews (assume 10 max), and provide consultation and
quick response to contractor and County questions during the course of construction. One site visit is
budgeted.
Assumptions:
This Scope and Fee are premised on the following assumptions:
1. County to provide all environmental permitting and Cultural Resource's and regulatory
coordination for this project.
2. County to provide Kpff with a base survey map including utility types and locations from which
Kpff can perform the most cost effective bridge layout. County will collect additional data as
necessary per request by Kpff. Contours shall be in at least 2 ft increments and shall preferably
extend at least 100 feet to the north, south, east and west of the bridge to include all driveways,
ditches, and other items which are reasonable likely to impact the bridge layout and design.
3. County to provide geotechnical data for the design of the foundation. Currently it is believed that
a pile cap foundation will provide the most cost effective design. However, a spread footing
Ln5CF1)FS _. TO 7ryE
KITTITA6 COUNTY
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
layout will be quickly reviewed to ensure this is the case. Kpff to discuss the pros and cons with
the County before proceeding with a final decision and design.
4. Kpff to layout new bridge to ensure, as best as possible, that no right-of-way takes will be
required.
5. Kpff to design guardrail layout in collaboration with the County. Guardrail on the bridge will
meet current WSDOT/AASHTO design specifications and criteria based on road use and speed.
Guardrail off the bridge will follow as best as possible the WSDOT Standard Plans for guardrail
layout. The final guardrail alignment will achieve a best fit between the WSDOT Standard Plans
and the actual space available to fit it. Based on early site visits it appears that the rail will need
to make some very short radius turns to fit into the irrigation canal access roads and nearby
residential driveways.
6. KPFF will provide all necessary Civil engineering effort including specifications, quantities and
costs as needed for the development of these plans. This is assumed to include roadway sections,
grade profiles, drainage issues, utility concerns, and shoulder and ditch layouts. County to
coordinate with Kpff regarding guardrail off the bridge.
7. Kpff to provide specifications related to the PS&E they develop only. An effort will be made to
consolidate all specs on to the plans to work in conjunctions with the WSDOT Standard
Specifications (2016 and all amendments and GSP revisions to the latest date possible — likely
January of 2018).
8. The bridge will be closed during construction.
9. Currently the new bridge is assumed to be designed for two 12 foot lanes, and two 2 foot
shoulders. The width shall meet approach widths at a minimum, and as prescribed by the County.
10. No sidewalks.
11. County will inform Kpff if curbs are required and if they are what type, size, and the extent of
layout beyond the bridge is desirable.
12. Bridge superstructure will have a 2% crown from the centerline of the roadway, or as prescribed
by the County.
13. Stripping and final channelization of the approach and bridge will be provided by the KPFF.
14. There will be no drains on the bridge.
15. Bridge will be a single span.
16. Voided pre -cast box slabs with a 5 inch topping and overlay will likely provide the most cost
effective design and will serve as the basis of the Kpff design unless prescribed differently by the
County.
17. Kpff, as EOR, to make use of the Sargent concept development plans for efficiency to the extent
possible but are not obligated to follow the Sargent layout and design explicitly.
Milestones:
Kpff will provide a PDF of the plans for the 30%, 75%, and 100% design at the dates shown below. For
efficiency, the design will continue following milestone submittal while the county performs review of
\F Cn\InIJL ..TO TIfC((/
G�
KI MTAS COON'rV
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
the submitted plans. The county will endeavor to complete and return to Kpff all comments asap
following receipt of them, but in no case more than 10 days following the milestone date - this is to
reduce the likely -hood of redesign.
Mile Stone
Milestone Delivery Date
Description
30%
October 2017
Permit set. 3 sheets estimated. Layout,
Elevation, Cross-section, basic notes
75%
January 2018
10 sheets, all items including further
development of the notes, specs, and
quantities.
100 % Draft
March 2018
10-11 sheets, all items developed and
ready for construction, pending final
review by county. Complete PS&E.
100% Stamped and Signed
April 2018
Stamped and Signed Contract
Documents — bid ready.
Cost Breakdown: See Attached
Completion Date: March 31, 2019
Agency Signature:
Consultant Signature:
Date:
Date: July 12, 2017
Thomas H Whiteman, Associate / Project Manager
Kinins County CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET
On -call -20$]
Task Order
CONSULTANT FEE DETERMINATION BY KPFF FOR KITTITAS COUNTY ON CALL
ROAD 6 BRIDGE PSBE
ESTIMATION OF MANAGEMENT AND ENGINEERING HOURS
COST
TASK ORDER8
vnnc Dave
w(
MOMullen)
Project
Man ager
ITom
Whiversho
Teahnkal
6wdalm
(Tam
Whose n)
semar
Erglneer
(9lrvho 4
CNi)
Daagn
Engineer
(91ructurN8
CM)
caD Tenn
(so-uclural$04minelrarer
CNII)
wojeM
IA
Femoro.)
MLLTPLIER'.
REM SCOPE OF WORK
$62.50
$6923
$6923
$4240
$35.16
$3900
$26,48
26552
t CONTRACT MANAGEMENT AND COORDINATION
cont.ct compliance a On,l Mbn
16
2
2
$757
Client Communiwipns
8
$1471
Ia6
SFIlsr&General Projev1 Coordinahon
18
4
$3,590
SUMnnswei nl Coordination
0
Inwicing B Project Summaries
1.5
6
8
51.914
Labor Subtobl l:
3
34
0
0
0
0
14
$1.732
So
2 SITE OR CLIENT VISIT Iu a[v.Esrsowaaawot
Td.NIE T)
4
4
4
$1.559
Prep. Meet WCMY
2
4
2
$1005
Lahr Sul 2:1
8
0
8
6
0
0
$2,564
$200
3 DEVELOPMENT OF PSSE- CONTRACT BID DOCUMENTS
Sheet 1 -corer
1b
30
10.0
$1 s57
Sheel2-Gen Notes, OsenNies. space. Cron section
40
24.0
8.0
200
$6255
Sheri B- General Plan. Layout B Flair
Bo
220
80
28.0
$1,226
She. 4- Foundatun. Abatmrm. W. Wane 1
20
4.0
20.0
200
$4,756
Sheet 5- Fourche, ACWmess W Willal
20
4.0
16.0
180
54,176
Sheet 6-Fral leg Plan and Gine. 1
3.0
4.0
16.0
20.0
$4,567
Sheet 7- Gore, 2, Orleans. Joint
20
4,0
16.0
180
$4.176
Shdrl Approach Slabts)
10
20
8.0
18.0
$3,020
Sheer 9- Bridge Ran 8 Gnarl 1
3.0
200
40
20.0
$5,248
Sheol Guartl Ra,128Mec
10
120
4.0
180
$3712
Plan orad Calculatun OulaAy LaMrol LM1ecb and ReWevrs
6.0
80
24.0
40
12.0
$6,]89
Plan Coordinalbn uilh Caunty(Survry, C.I. G..N.Innkal)
60
100
20
40
$2,830
LoaU Rating
20
20.0
40
$2,993
Ciui Engineering (wbw c, Al ,ad. oad.. detour
plan, deWatbns. guardrail review, Stripping. TE50, drainage review,
ac)
80
40.0
40.0
36.0
$13,436
Labor Subbtal 3:
6
8
41
193
150
242
0
$70.794
$0
4 COSTRUCTION SUPPORT - dvnexu
Consolation, RFI and Shop Rei Questions
Did or County Vold
1
4
12
12
6
1
$4 064
labor Subtobl4:
1
0
4
12
12
6
t
$4,064
TOTAL LABOR
10
48
45
213
188
246
15 $
86154
TOTAL REIMBURSABLE
ii
f
MANAGEMENT RESERVE (OPTIONAL)
I
$
A
GRAND TOTAL -NOT TO E%CEEB
$825
$3,523
$3,115
$9,031
$5,90]
$9.672
f3W