HomeMy WebLinkAboutAR17-007 DOE OIL SPILL GRANT - Agreement17 E P A 11 1� Ni E N I OF
ECOLOGY
Stat' of Y/ashington
Agreement No. SPPREG-2017-KiCoEM-00063
SPILL PREVENTION, PREPAREDNESS, AND RESPONSE EQUIPMENT GRANTAGREUMENT
BETWEEN
THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
KITTITAS COUNTY SHERIFF
This is binding Agreement entered into by and between the state of Washington, Department or Ecology,
hereinaller referred to as "ECOLOGY," and Kittitas County Sheriff, hereinafter referred to as the "RECIPIENT," to
carry out with the provided Funds activities described herein,
GENERAL INFORMATION
Project Title:
Total Cost:
Total Eligible Cost:
Ecology Share:
Recipient Share:
The Effective Date of this Agreement is:
The Expiration Date of this Agreement is no later than:
Prqjcct Type:
Regional oil spill and liaz-neat incident response
and vesourceacqUiSiti011
$13,350.00
$13,350.00
$13,350.00
$0.00
11/01/2016
06/30/2017
Equipment Cache Grant
Project Short Description:
Create a centralized response trailer that can be deployed in a timely milliner th1-0L1gh0Ut Kittitas and adjacent
counties, The grant would be utilized to purchase oil spill and haz-mat response tools and equipment to stock
the trailer. The grant will also be Utilized to purchase quick recover tools that can be placed on responding
apparatus to mitigate the disastrous effects ofan oil spill and/or hu -mat incident until the ftilty stocked trailer
call arrive.
Project Long, Description:
Kittitas County fire districts have limited resources to accomplish a timely and efficient response to oil spill and
hazardous material incidents. To remedy this response gap, the Kittitas County Fire Districts and the Kittitas
County Emergency iManagement Department have WalllCd Ul) to C011SOlidate resources thrOUgh a centralized
response trailer that can be stocked with response tools and equipment. 'File response trailer could be
deployable anywhere in the county in a timely manner.
Sime of Washington Depafmwnt ot'Eeok)6y
Atareenient No SPPREG-2017-KiCoEM-00063
Projcct Titic Regional oil spill and hu -mut incident response and resource acquisition
Recipient Name Kittitas County Sheriff
The grant would 'go towards the PLIrChaSC OrOil Spill and haz-mat response tools and equipment. Kittitas Co.
already has a towed trailer that will be converted to become a dedicated oil spill and hazardous material incident
response trailer. The grant would also be used to purchase quick response equipment that call be Stored on
responding apparatus to mitigate environmental damage Until the trailer can arrive Oil Scene.
Kittitas County is a Very rural area, however, %ve have Interstate 90, 1-82 and State ROLItC 10, 903, 906 and 97
that I'lln, thl-OUgh tile COLIVIty. Interstate 90 bisects our entire county and crosses many rivers and streams and also
RHIS adjacent to a large lake. 1-90 has a very heavy traffic flow this includes oil, gas and other hazardous
materials that are transported tll)'OLlgll the COUnty. Kittitas County also has a rail System that runs the entire
length of the comity. Crude oil is not shipped through the county, however, other hazardous materials are
transported by rail thl-OLIgIl the county. The rail system follows rivers and takes on almost the entire route.
An oil spill or hazardous materials incident COUld have devastating environmental effects on Kittitas County and
impact adjacent counties down river. The major waterways that could be effected are the Columbia River,
Yakima River, Easton River, Cie Emil River, Keechchis Lake, Easton Lake. The eIlVirOnIIICIItaI effect could be
catastrophic to plant and animal life throughout Kittitas County all([ counties down stream. The rivers and lakes
provide irrigation water to the entire Kittitas valley, The response equipment supplied by this grant would help
mitigate the potential catastrophic effects that all oil spill or hazardous material incident could cause to the
environment.
All local fire districts have signed oil to the plan to utilize a Kittitas Fire District 7 towed trailer that will be
converted to in oil spill / hu -mat response apparatus, The Kittitas County Emergency IvIanagenient has agreed
to apply For and distribute the purchase equipment to aII the participating Fire Districts. Future training out the
use or the response equipment will be paid for and conducted by the participating Fire Districts.
Overall Goal:
Our goat is to minimize the environmental impact or all oil spill and/or hazardous material incident by creating
an efficient, Centrally IOCatCd, III Litt i-jurisd ictional response trailer. The goal of the asset is to assist all fire
districts in Kittitas County and to include neighboring counties with a trailer that has the appropriate response
resources in all all -in -one apparatus.
Version 10/30/201 i
Page 2 of N
State ofWailungton Department of Ecology
Aiumnent No SPPREG-20t 7-KtCoEM-00063
Project Title Regional oil spill and haz-mat incident response and resource acquisition
Recipient Name Kittitas County Sherill'
RECIPIENT INFORMATION
Organization Mame: KittitasCOL111tySheriff`
Federat'Fax ID: 91-6001349
DUNS NUmber: 0102025,17
Mailing Address: 307 W. Uniptanum Rd
Ellensburg, WA 98926
Physical Address: 307 W. Umptarturn Rd
Ellensburg, Washington 98926
Organization Email: (fari,eii.iligasliiyatiia@co,kittitIS.WI. LIS
Contacts
Page 3 of H
Project Manager
Darren Fligashiyania
Commander
307 W. Uniptartum Rd
Ellensburg, Washington 98926
Email: (iii-reti.higas[iiyatiia@co.kittitas.wa.tis
Phone: (509) 933-8206
Billing Contact
Heather Seibert
Chief iriancial I'vIanager
307 W Umptanum Rd
Ellensburg, Washington 98926
Email: licattier,scibert.sli@co.kittit,,is.wa.tis
Phone: (509) 9627099
Authorized
Darren Ffigashiyama
Signatory
Commander
307 W. Uniptinum Rd
Ellensburg, Washington 93926
Email: darreti,higasliiyatna@co.kittitts.wa.LlI
Phone: (509) 933-8206
Version 10/311/20 15
Slaw of Washinglon Department of Ecology
A - No . - k Io Si'l)fZECi-2017-KiCoF,\I-O(,'(.)63
project l'itle: Rqponol oil spill and hu -mot incident response and resource acquisition
Recipient Name: Kittilas County Sheritf
ECOLOGY INFORMATION
Mailing Address: Departmerit of Ecology
Spills
110 BOX 47600
Olympia, WA 98504-7600
Physical Address: Spills
300 Desmond Drive SE
Lacey, WA 98503
Contacts
Pace -1 of W
version 10/30/2015
Laura Hayes
Project
rVI'magel.
PO Box 47600
Olympia, Washingtoii 98504-7600
Email: I[iEty461@ecy.wa.gov
Phone: (360) 407-7185
Laura 1 -!ayes
Finailicial
Mallager
PO Box 47600
Olympia, Washirigtoti 93.504-7600
Email: Itiay,161@ecy.wa.gov
Phone: (360) 407-7485
Jodi Goodmati
Technical
Advisor
PO Box 47600
Olympia, Washirigtoii 985011-7600
Email: jgoo461@ecy.xva.gov
Phone: (360),107-6762
version 10/30/2015
Stale of'Washmaton Department ol'Ecolon,
A"reement No SPREO-2017-KiCoEM-00003
ProJect Tide: Regional od spill and haz-mat mcident response and resource acquisition
Recipient Name. Kitut-as Count} Sheriff
AUTHORIZING SIGNATURES
RECIPIENT agrees to rurnish the necessary I)MOMIC], e(JUipalCrIt, Materials, services, find otherwise (to all things
necessary for or incidental to the performance of work as set forth in this Agreement.
RECIPIENT acknowledges that they had tile opportunity to review tile entire Agreement, including all the terns and
conditions of this Agreement, Scope or Work, attachments, and incorporated or referenced documents, as well as all
applicable laws, statutes, rules, regulations, and guidelines mentioned in this Agreement. Furthermore, the
RECIPIENT has read, understood, and accepts all requirements contained within this Agreement.
This Agreement contains the entire understanding between the parties, and there are no other understandings or
representations other than as set Forth, or incorporated by reference, herein.
No subsequent modifications or amendments to this agreement will be orany force or effect unless in writing, signed
by authorized representatives of the RECIPIENT and ECOLOGY and made a part or this agreement. ECOLOGY and
RECIPIENT may change their respective staff contacts without the concurrence orcither party.
This Agreement shall be subject to the written approval or Ecology's authorized representative and shall not be
binding until so approved.
Thc signatories to this Agreement represent that they have the authority to execute this Agreement and bind their
respective organizations to this Agreement.
IN WITNESS WHEREOF: the partics hereto, having read this Agfcenicnt in its entirety, including all attachments, do
agree in each and every particular and have thus set their hands hereunto.
Washington State
Department of Ecology
By: K, - f
Date Jensen Date
spills
Program Ivianager
"remplate Approved to rorm by
Attorney General's Office
Version 10/30/2015
Kittitas County Sheriff
palw 3 of 19
By:
Darren Ffigashiyania Date
Commander
State Department ol'Evology
Alueemelit No SPPRLG-2017.KiCoEM-(J10063
Projoet Title Regional oil spill and lin-mat incident response and resource acquisition
Recipient Name KittIMS COLIIIL\' Sheriff
SCOPE OF WORK
Task Number: I 'I"ISI(Cost: $0.00
Task Title: Project Administration
Task DescripLion:
A. The RECIPIENT will administer the project. Responsibilities will ilICILKIC, bUt are not limited to: maintenance of
project records; submittal of requests for reirribursement acid corresponding backup doCUIllentation, progress reports
and recipient CIOSCOUt report (including photos), compliance with applicable procurement, contracting, and interlocal
agreement requirements, application for, receipt of, and compHatice with all required permits, licenses, easements, or
property rights necessary for the project, and submittal of required perrormance items.
B. The RECIPIENT BILISt manage the project. Efforts will include: conducting, coordinating, and scheduling Project
activities and assuring quality control. Every effort will be made to maintain effective communication with the
RECIPIENT's designees; ECOLOGY, all affected local, state, or federal jurisdictions; and any interested individuals
or groups. The RECIPIENT 111LISt carry out this project in accordance with any completion dates outlined in this
agreement.
Task Goal Statement.
Properly managed project that meets agreement and Ecology administrative requirements.
Task ExR�ctcd. Ott tconic:
1. Timely and complete submittal of requests for reimbursement, quarterly progress reports, and recipient el0se0Llt
report.
2. Property maintain project documentation.
Recipient Task Coordinator Darren[ligashiyarria
Project Administration
Deliverables
hvw 6 of 19
Version 10/30/2015
State or Washington Department ol'Ecology
Agreement No SPPREG-2017-KiCoEM-00063
Project Title: Regional Oil spill and 11"u -mot incident response and resource acquisition
Recipient Name Kittims County SlieFiri,
SCOPE OF WORK
Task Number: 2 Tast(Cost: $13,350.00
Task 'title: New Response Equipment Purchase
Task Descripiiota:
A. The RECIPIENT will JAII-ClIaSO only approved, eligible response equipment, tools, zind supplies in accordance with
ECOLOGY's requirement outlined in the Administrative Requirements for Recipients of Ecology Grants and Loans
iManaged In EACH., guidebook.
B. The RECIPIENT will purchase and take possession of approved, eligible oil spill and hazardous materials response
and firefighting equipment, tools, and supplies that support the described project for oil spill and hazinat response and
firefighting capacity building as described in the funding guidelines and that has been approved by ECOLOGY.
Task Cion) Statement:
Build and support spill and hazardous materials response and firefighting capacity through the purchase of approved,
eligible response equipment, tools, and supplies.
Task Expected OutcotLic�:
1. Timely and complete implementation of the task, including the purchase and acquisition of approved, eligible
response equipment, tools, and supplies.
2. Property store and maintain response equipment, tools, and supplies.
Recipient Task Coordinator: Darren Higashiyartia,
New Response Equipment Purchase
Deliverables
Number Description Due Date
2.1 Purchase approved, eligible equipment
2.2 1 Schedule equipment inspection with. Ecology
Version 10/30J2015
Paste 7 01,19
State of Washirnaton Department of Ecolo,,'�
Aureentent No: SPPIZFG-3017-KiCaEM-00063
Project Title Regional oil spill and hu -mat incident response and resource ac(jwsnion
Recipient Name hitttas Count)• Sheriff
BUDGET
Funding Distributiou EG170119
NOTE: 7he above f mcling distribution number is i(sed to identdfy this sped("le agreement rind budget ori jvayrnent
remittances artd )rrqv he re
.1<rerlcecl Oil other cornrnunications front ECOLOGY. Your agreement nla�r have lntrltiple
funding distribution numbers to identify, ectch budget.
Funding Title: Response Equipment Cache Funding Type: Grant
Funding Effective Date: 11/0 (/201.6 Funding Expiration Date: 0613012017
Funding Source:
Title: State Toxics Control Account
Type: State
Funding Sou:•ce %: 100%
Description:
Approved Indirect Costs Rate: Approved State Indirect Rate: 0%
Recipient Match %: 0%
inKind Interlocal Allowed: No
hiKind Other Allowed: No
Is this Funding Distribution used to match a federal grant? No
Response Equipment Cache Task Total
Project Administration 0.00
New Response Equipment Purchase 1 $ 13,350.00 1
Tom: S t3,350,00
Version 10/30/3015
Palle 3 of 11)
State of Washington Department ofEcolog
Agreement No SI)II[tEG-2017-KiCoEi%[.(,Oi)ti3
Project Title Regional oil spill and hu. -mat incident response and resource acquisition
Recipient Name Kituwi(-'()unt\ Sheriff'
Fundina Distribtit I !LSummary
Recipient / Ecology Share
Page 9 of 19
Fundhig Distribution Name
Recipient Match % Recipient Share
Ecology Share
Total
Response Equipment Cache
0,00 % S 0.00
$ 13,350.00
S 13,350.00
Total
0.00
$ 13$350.00
S 13,3,50.00
AGREEMENT SPECIFIC TERMS AND CONDITIONS
N/A
SPECfALTERNIS AND CONDITIONS
GENERAL. FEDERAL CONDITIONS
If a portion or all of the funds for this agreenicut are provided through federal funding sources or this
-
agreement is used to match a federal grout award, the following g teinis and conditions apply to you.
A. CERTIFICAIJON REGARDING SUSPENSION.,. I)LBARi'VIENT, INELIGIBIL11'Y OR VOLUNTARY
EXCLUSION:
1. The RECIPIENT/CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred,
proposed for debarment, declared ineligible or Otherwise MILIded from contracting with the federal
government, or from receiving contracts paid for with federal Binds. If the RECIPIENT/CONTRACTOR is
unable to certify to the statements contained in the certification, they must provide an explanation as to why they
cannot.
2. The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY irat any time the
RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become
erroneous by reason orchanged circumstances.
3. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant,
person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have
the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549.
You may contact ECOLOGY for assistance in obtaining a copy of those regulations.
4. The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction
with a person who is proposed for debarment Under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction.
5. The RECIPIENT/CONTRACTOR further agrees by signing this agreement, that it will include this clause titled
"CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY
EXCLUSION" without modification in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
6. Pursuant to 2CFRI80.330, the RECIPIENT/CON` IZACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
7. RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of
Version 10/30/2015
State ol'Washington Department of Eeo I ogc
A,-,reemen( No SIIPRF-(i-21)17-KjC'oF4I-t)1)003
project Title Regional oil spill and lin-Illat incident response and resource acquisition
Recipient Name Kittitas Count% Sliuriff
Paw 10 of 19
Federal Regulations may result in the delay or negation of' this Funding agreement, or pUI'SLlallCe or legal
remedies, including suspension and debarment.
S. RECIPIENT/CONTRACTOR agrees to keel) proof in its agreement rite, that it, and all lower tier recipients or
contractors, are not SLISPC11(10(1 or debarred, and will make this prooravai [able to ECOLOGY before requests for
reimbursements will be approve(] for paymetit. RECIPIENT/CONTRACTOR must I'Lln a search in
and print a copy of completed searches to document proorof compliance,
B. FEDERAL FUNDING ACCOUNTABILITY AND'FRANSPARENCY ACT(FFATA) REPORTING
B.EQUIREI�LENTS:
CONTRACTOR/RECIP[EN'r must complete the FFATA Data Collection Form (ECY 070-395) and return it
with the signed agreement to ECOLOGY.
Any CON'FIZACI'OR/[2ECIPIEN'I'tliat meets each or the criteria below MUSt report (301111MISatiOn for its live
top (3XCCLltiVCS Using tile FFATA Data Collection Form,
Receives more than $25,000 in federal funds under this award.
Receives more than 80 percent of its annual gross rOMILICS rrom federal funds.
Receives more than $25,000,000 in annual federal funis.
Ecology will not pay any invoices until it leas received completed and signed FFATA Data Collection Form.
Ecology is required to report the FFATA information for federally Funded agreements, including the required
DUNS number, it by�v ">avitliiii3O(taysorigi-eciiietitsigiiatLire,TlieFF\:rA
Iv. rsrs,,gov ��JIIIV:" m% �V 1�Srs "ov,
information will be available to the public at %k%VNVAj.SaSp nail Alov
For more details oil FFATA requirements, see mvv.Fsrs. ;ctv
Version [0/30/2015
Situ ol'Washiqumin Department ol'Ecolopy
Agreement No: Si)(IREG-2017-Ki('ol-.41-00063
Project l'itle Re8imml oil spill and liaz-mat incidcnt FC3l)0oSC MILI resource acquismon
Recipient Name (ilums County Sherill'
GENERAL'I'EIRMS AND CONDITIONS
Pertaining to Grant and Loan Agreements With the state of Washington, Department or Ecology
I. ADMINISTRATIVE REQUIREMENTS
a) RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans— EAGL
Edition," https://fortress, wa,gov/ecy/publ ications/S u ni mary Pages/ 14 0 1002,11 trn I
b) RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper
management ofall funds and resources made available Under this Agreement,
c) R-EC[PIENTagrees to take complete responsibility for all actions taken under this Agreement, including ensuring
all subgrantees and contractors comply with the ternisand conditions of this Agreement. ECOLOGY reserves the right
to request proof ofcompliance by subgrantees and contractors.
(1) RECIPIENT's activities under this Agreement shall be subject to the review and approval by ECOLOGY for the
extent and character of all work and services.
VM211111W
2. AiMENDiMENTS AND tMODIFICATIONS
This Agreement may be altered, amended, or waived only by a written amendment executed by both pal -ties, No
subsequent modification(s) or arnendment(s) or this Agreement will be of any force or effect unless in writing and
signed by authorized representatives of both parties. ECOLOGY and the RECIPIENT may change their respective staff
contacts and administrative information without the C011CUrrenCe of either party.
3. ARCHAEOLOGICAL AND CULTURAL RESOURCES
RECIPIENT shall take reasonable action to avoid, minimize, or mitigate adverse effects to archeological and historic
I-CSOUrCeS. The R1.,.CIP[ENT must agree to hold harmless the State of Washington in relation to any claim related to
historical Or Cultural artifficts, discovered, disturbed, or damaged due to the RECIPIENT's project f.111CIC(I Linder this
AgrcenienL
RECIPIENT shall:
a) Contact the ECOLOGY Program issuing the grant or loan to discuss any Cultural Resources requirements for their
project:
0 For capital construction projects or landaCCILliSitiOnS for capital construction projects, if required, comply with
Governor Executive Order 05-05, Archaeology and Cultural Resources.
• For projects with any federal involvement, if required, comply with the National Historic Preservation Act.
• Any cultural resources federal or state requirements must be completed prior to the start of any work on tile proJect
site.
b) IT required by the ECOLOGY Program, submit an Inadvertent Discovery Plan (IDP) to ECOLOGY prior to
implementing any project that involves grOUnd disturbing activities. ECOLOGY will provide the IDP rorm,
RECIPIENT shall:
• Keep the IDP at the project site.
• 'Make the IDP readily available to anyone working at the project site.
• Discuss the IDP with staff and contractors working at the project site.
0 Implement the IDP when cultural rCSOL1rCCS Or human remains are found at the project site.
c) If any archeological or historic resources are found while conducting work under this Agreement:
0 Immediately stop work and notify the ECOLOGY Program, the Department of Archaeology and Historic
["reservation at (360) 586-3064, any affected Tribe, and the local government.
(1) Warty human remains are tbUnd while conducting work under this Agreement:
0 Immediately stop work and notify the local Law Enforcement Agency or Medical Examiner/Coroner's Office, and
then the ECOLOGY Program.
Version 10/30/2015
Suite orMt.,11111--too Department of Ecology lliwc 12 0r 19
.-Ureement No SPPREC-2017-KiCoEM-00063
Project Title Regional oil spill and ham -mat incident NSPOINC and 10011[Ce 1CLIUM111011
Recipient Name: Kittitas County Sheriff
e) Comply with RCW27.5),RCW27.44.055,and RCW68.50,64i,,incl till other iii)I)Iiciblelocal, state, and federal
hlWS protecting CUltUral resources and human remains.
4. ASSIGMAENT
No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the RECIPIENT.
5. CONEMUNICATION
RECIPIENT shall make every effort to maintain effective C011111111nications with the RECIPIENT's designees,
ECOLOGY, all affected local, state, or federal jurisdictions, and any interested individuals Or grOUPS,
6. COtvIPENSA,rION
a) Any work performed prior to eMctivc date of Chis Agreement will be at the sole expense and risk of the
RECIPIENT. ECOLOGY must sign the Agreement before any payment requests can be submitted.
b) Payments will be made on reimbursable basis For approved and completed work as specified in this Agreement.
c) RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility S1101111d be clarified
with ECOLOGY prior to incurring costs. Costs that are conditionally eligible require approval by ECOLOGY prior to
expenditure.
(1) RECIPIENT shall not invoice more than once per month. unless agreed oil by ECOLOGY,
e) ECOLOGY will not process payment requests without the proper reimbursement forms, Progress Report and
supporting (10CLUTIC11tati011. ECOLOGY will provide instructions for submitting payment requests,
0 ECOLOGY will pay the RECIPIENT thirty (30) days atler receipt of a properly completed request for payment.
g) R.ECIPIEN'r win receive payment through Washington State Department of Enterprise Services' Statewide Payee
Desk. RECIPIENT' must register as a payce by submitting a Statewide Payee Registration form and In IRS W-9 form
at the website, littp://NvNvw,(Ies.%va.gov/services/CoiltrictiiigPtit-cliasitig/BLisitiess/VetidorPay/Pages/derlLllt.,,isl)x. For
any questions about the Velldor registration process contact the Statewide Payee Help Desk at (360) X107-8180 or cillail
p,,iyeelielp(lesk@(Ies.wa.gov,
la) ECOLOGY may, tit its sole discretion, withhold payments claimed by the RECIPIENT if the RECIPIENT falls to
satisfactorily comply with any term or condition of this Agreement.
i) Monies withheld by ECOLOGY may be paid to the RECIPIENT when the work described herein, ora portion
thereof, has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according to
this Agreement, as appropriate, or upon completion oCan audit is specified herein.
j) RECIPIENT should submit final M(ILIeStS for compensation within thirty (30) days after the expiration date of this
Agreement. Failure to comply May NSUR in delayed reimbursement.
7. COMPLIANCE WITH ALL LAWS
RECIPIENT agrees to comply fully with all applicable federal, state an([ local laws, orders, regulations, and pertilits
related to this Agreement, including but not limited to:
a) RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State
or Washington which affect wages and job safety.
b) RECIPIENT agrees to be bound by all applicable federal and state laws, regulations, and policies against
discrimination.
c) RECIPIENT certifies full compliance with all applicable state industrial insurance requirements.
(1) RECIPIENT agrees to SCCUre Enid prOV He ' aSSUratICC to ECOLOGY that all the necessary approvals and permits
required by authorities having jurisdiction over the project are obtained. RECIPIENT must include tillie ill their project
tirrieline for the permit and approval processes.
ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the
RECIPIENT fails to comply with above requirements.
Version 10/30/20:5
State or Witilmigion Depminctit ot* Eeolog�
Agreement No SNIREG-201 7-KiCoEM-OU063
Project Title Regional oil spill and haz-mat incident response and resource acquisinoll
Recipient Name Kittluis county sheriff
I rany provision ofthis Agreement violates any statute or rule of law or the state of Washington, it is considered
modified to conform to that statute Or IMIC of law,
S. CONFLICT OP INTEREST
RECIPIENT and ECOLOGY agree that any officer, member, agent, or employee, who exercises any function or
responsibility in the review, approval, or carrying out of this Agreement, shall not have any personal or financial
interest, direct; or indirect, nor affect the interest of any corporation, partnership, or association in which he/she is a part,
in this Agreement or the proceeds thereof.
9. CONTRACTING FOR GOODS AND SERVICES
RECIPIENT may contract to buy goo(is or services related to its performance Under this Agreement. RECIPIENT shall
award all contracts fOr construction, purchase ofgoods, equipment, set -vices, and professional architectural and
engineering services through a competitive process, if required by State law, RECIPIENT is required to follow
procurement procedures that (311SLIM legal, fair, and open competition.
RECIPIENT must have a standard procurement process or follow current state procurement procedures. RECIPIENT
may be required to provide written certification that they have followed their standard procurement procedures all([
applicable state law in awarding contracts under this Agreement.
ECOLOGY reserves the right to hispectand request copies ofall procurement documentation, and review PrOCLIX0111WIt
practices related to this Agreement. Any costs incurred as a result of procurement practices not in compliance with
state procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY's sole discretion,
10. DISPUTES
When there is a dispute with regard to the extent and character of the work, or any other matter related to this
Agreement the determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal
decisions as provided For below:
,a) RECIPIENT notifies the funding program of all appeal request.
b) Appeal MILIeSt must be in waiting and state the disputed issue(s).
c) RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal.
(1) ECOLOGY reviews the RECIPIENT's appeal,
e) ECOLOGY sends a written answer within tell (10) business (lays, UnIeSS More tillIC is needed, after concluding the
review.
The decision of ECOLOGY from all appeal will be final and conclusive, unless within thirty (30) (lays from tile (late of
such decision, the RECIPIENT rurnishes to tile Director of ECOLOGY written appeal. The decision of the Director or
duly authorized representative will be final and conclusive.
'file parties agree that this dispute process will precede any action in ajUdiCial or quasi-judicial tribunal.
Appeals of the Director's decision. will be brought in tile Superior Court of Thurston County. Review of the Director's
decision will not be taken to Environmental and Land Use Hearings Office.
Pending final decision ora dispute, the RECIPIENT agrees to proceed diligently with the performance of this
Agreement and in accordance with the decision rendered.
Nothing in this Agreement will be construed to limit the parties' choice of another 111URRIlly acceptable method, in
addition to the (IISPLIte resolution procedure outlined above.
11, ENVIROMMENTAL DATA STANDARDS
a) RECIPIENT shall prepare a Quality Assurance Project Plan (QAPP) for each project that collects or Uses
environmental meaSUM111CIlt (luta: RECIPIENTS unsure about whether QAPP is required for their project shall contact
the ECOLOGY Program issuing the grant or loan. Ifa QAPP is required the RECIPIENT" shall:
. Use ECOLOGY's QAPP Template provided by the ECOLOGY Program.
Version 10/30/2015
Page 13 of N
State of Washington Department ofEcolog%
Agr"Ilmlt 140 SPIIREG-2017-KiCoEM-00063
Pro.lect Title Regional ml spill and lin-mat incident response and resource acquisition
Recipient Mune Kilmas Comity Sheriff
Page 14 ot'19
# Follow ECOLOGY's Guidelines ror Preparing Quality Assurance Project Plans for Environmental Studies, Ally
2004 (Ecology Publication No. 04-03-030).
. Submit the QAPP to ECOLOGY for review and approval before the start or the work.
b) RECIPIENT shall submit environmental data that was collected oil a project to ECOLOGY using the
f.-..iivi roil me n tal Information Nlanagerrient system (EINI), unless the ECOLOGY Program histructs Otherwise. 'rile data
1111.1st be successfully loaded into EINI, find instructions at: htti)://w%v%v,ccy.w-,i.gov/eitii,
c) RECIPIENT sliall follow ECOLOGY's data standards when Geographic Information System (GIS) data is collected
and processed. GUidelillOS for Creating and Accessing GIS Data are available at:
litt[)://W�vw,ccy.4va.gov/services/&,is/(I,ita/staii(far(is/stati(lar<is.litiii, RECIPIENT, when requested by ECOLOGY, shall
provide copies to ECOLOGY of all final GIS data layers, imagery, related tables, raw data collection files, map
products, and all metadata and project documentation,
12. GOVERNING LAW
This Agreement will be governed by the laws oftlic State or Washington, and the venue orally action brought
licreUnder will be in the Superior Court Of ThUrSt011 County.
0. I-NDEIVINMICATION
ECOLOGY Nvill in no way be held responsible for payment Of Salaries, consultant's fees, and other costs related to the
project described herein, except as provided in the Scope of Work.
To the extent that the Constitution and laws of the State of Washington permit, each party will indemnify and hold the
other harmless From and against any liability for any or all injuries to persons or property arising from the negligent act
or omission of that party or that party's agents or employees arising out of this Agreement.
14. INDEPENDENT STATUS
The ClllplOyeCS, VOtLinteers, or agents oreach party who arc engaged in the performance orchis Agreement will continue
to be employces, volunteers, or agents of that party and will not ror any purpose be employees, volunteers, or agents or
the other party.
15, KICKBACKS
RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this Agreement
to give Lip any part of the compensation to which lie/she is otherwise entitled to or receive any fee, commission, or gift
in return ror award Ora subcontract hereunder.
16. tMINORITY AND WOMEN'S BUSINESS ENTERPRISES (NfWBr--')
RECIPIENT is encouraged to solicit and recruit, to the extent possible, certified minority-owned QVIBE) and
women -owned (WBE) businesses in purchases and contracts initiated under this Agreement.
Contract awards or rejections cannot be made based on MWBE participation; however, the RECIPIENT is encouraged
to take the following actions, when possible, in any procurement under this Agreement:
a) 111CILide qualified minority and women's businesses oil solicitation lists whenever they are potential sources orgoods
or services,
b) Divide the total requirements, when economically reasible, into smaller tasks or quantities, to permit maximum
participation by qualified minority all([ women's businesses.
c) Establish delivery scheclttles, cvllere kvork regttiremetlts permit, which will eticourage participatioti of qualified
minority and women's bLlSi1lCSSCS.
(1) Use (lie services and assistance of the Washington State Office of Nlinority in([ Women's BLISilless Enterprises
(OiN,IWBE) (866-208-1064)and the Office of Nfinority Business Enterprises orthe U.S. Department or Commerce, as
appropriate.
version 10/30t201 5
State of %Vashm�mon Department offeoto,}
Agreement No SPPRIEG-2017-KiCAM-00063
Project Title. Revional oil spill and haz-mat incident response and resource acquisition
Recipient Name Kiallas County Sheriff
17. ORDER OF PRECEDENCE
In the event of inconsistency in this Agreement, unless otherwise provided herein, the inconsistency shall be resolved
by giving precedence in the following order: (a) applicable federal and state statutes and regulations; (b) The
Agreement; (c) Scope of Work; (d) Special Terms an([ Conditions; (e) Any provisions or terms incorporated herein by
reference, including the "Administrative Requirements for Recipients of Ecology Grants and Loans"; and (f) the
General Terms and Conditions.
IS. PRESENTATION AND PROMOTIONAL MATERIALS
ECOLOGY reserves the right to approve RECIPIENT's C01111111,111iCati011 documents and materials related to the
full'i I Iment of this Agreement:
a) if requested, RECIPIENT shall provide draft copy to ECOLOGY for review and approval ten (10) business (lays
prior to production and distribution.
b) RECIPIENT shall include time for ECOLOGY's review and approval process in their project timeline,
c) If requested, RECIPIENT shall provide ECOLOGY two (2) final copies and an electronic copy ofany tangible
products developed.
Copies include any printed materials, and all tangible products developed Stich as brochures, manuals, pamphlets,
videos, audio tapes, CDs, curriculum, posters, media, announceme tits, or gadgets with a message, 81.1011 as a rerrigerator
magnet, and any online communications, such as web pages, blogs, and twitter campaigns. If it is not practical to
provide a copy, then the RECIPIENT shall provide a description (photographs, drawings, printouts, etc.) that best
represents the item.
Any communications intended for public distribution that uses ECOLOGY's logo shall comply with ECOLOGY's
graphic requirements ,in([ any additional requirements specified in this Agreement. Before the use of ECOLOGY's
logo contact ECOLOGY for gUidClitICS.
RECIPIENT shall acknowledge in the communications that funding was provided by ECOLOGY.
t9. PROGRESS REPORTING
a) RECIPIEN"I' must Satisfactority demonstrate tine timely use of fonds by stibntitting payment rcgticsts aii(I progress
reports to ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does
not CIOCUInClIt titIlCly Use of fonds.
b) RECIPIENT must submit a progress report with each payment request. Payment requests will not be processed
without a progress report. ECOLOGY will define the elenientsand frequency of progress reports.
c) RECIPIENT shall use ECOLOGY's provided progress report format,
d) Quarterly progress reports will cover the periods From January I through March 3 1, April I through June 30, July I
through September 30, an(] October I through December 31. Reports shall be submittcd within thirty (30) (lays after
the end of the quarter being reported.
e) RECIPIENT shall submit the Closeout Report within thirty (30) (lays of the expiration (late of the project, unless an
extension has been approved by ECOLOGY. RECIPIENT shall use the ECOLOGY provided closcout report format.
20. PROPERTY RIGHTS
a) Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable
property under this Agreement, the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty free,
nonexclusive, and irrevocable license to reproduce, publish, recover, or otherwise use the material(s) or property, and to
authorize others to use the same for federal, state, or local government purposes.
b) Publications. When the RECIPIENT or persons employed by the RECIPIENT Use Or publish ECOLOGY
information; present papers, lectures, or seminars involving information supplied by ECOLOGY; or use logos, reports,
maps, or other data in printed reports, signs, brOC111.1reS, pamphlets, etc., appropriate credit shall be given to ECOLOGY.
Version 10130/2015
Pave 15 of N
State o I' WaAmigton Deparinmit or Eeolog�
Agreement No 511PREC-201 7-KtCoE%ko0o63
Project Title Regional oil spill mid hu,mat incident response and resource acquisition
Recipient Name Kittims County sherill,
llim,e 16 of 19
c) Presentation and Promotional I'vlaterials. ECOLOGY shall have the right to Use or Mpt-OdUCC any printed Or graphic
materials produced in fill rill incrit ol.'this Agreement, in any manner ECOLOGY deems appropriate. ECOLOGY shall
acknowledge the RECIPIENT as tile sole copyright Owner in every use or reproduction of the materials,
(1) Tangible Property Rights. ECOLOGY's current edition of "Administrative Requirements for Recipients orEcology
Grants and Loans," shall control the use and disposition ofall real and personal property purchased wholly or in part
with funds furnished by ECOLOGY in the absence of state and federal statutes, regulations, or policies to the contrary,
OrUpOtl specific instrt.16011S with respect thereto in this Agreemclit.
c) Personal Property Furnished by ECOLOGY, When ECOLOGY provides personal property directly to the
RECIPIENT for use in performance of the project, it shall be I -CRU -1112d to ECOLOGY prior to final payment by
ECOLOGY. If said property is lost, stolen, or damaged while in the RECfPIENT's possession, then ECOLOGY shall
be reimbursed in cash or by setoff by the RECIPIENT for tile fair market value Of SUCII property.
1) Acquisition Projects, The following provisions shall apply if tile project covered by this Agreement includes binds
for the acquisition Orland or facilities:
1. RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement or funds provide([ for in
this Agreement.
2. RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to
disbursement of funds provided by this Agreement. Such evidence may include title insurance policies, Torrelis
certificates, or abstracts, and attorney's opinions establishing- that tile land is free fromany impediment, lien, or claim
which would impair the uses intended by this Agreement,
g) Conversions. Regardless or the Agrecillon t expiration ion (late, the RECIPIENT shall not at any time convert any
equipment, property, or facility acqUirCd or developed under this Agreement to uses other than those for which
assistance was originally approved without prior written approval of ECOLOGY. Stich approval may be conditioned
upon payment to ECOLOGY of that portion of the proceeds of the safe, lease, Or Other COnVerSi011 or C11CUmbratice
which monies granted pursuant to this Agreement beat, to tile total acquisition, purchase, or COIlStrLicti011 Costs Orsuch
property.
21. RECORDS, AUDITS, AND INSPECTIONS
RECfPIEN,r shall maintain complete program and financial records relating to this Agreement, including any
engineering documentation and field inspection reports oral] construction work accomplished.
All records shall:
a) Be kept in a manner which provides in audit trail for all expenditures.
b) Be kept in a common file to facilitate audits and inspections.
c) Clearly indicate total receipts and expenditures related to this Agreement.
d) Be open for audit or inspection by ECOLOGY, or by any duly authorized audit representative of the State or
Washington, Fora period of at least three (3) years after the final grant payment of, loan repayment, or ally dispute
IVSOIL16011 hereunder.
RECIPIENT shall provide clarification and make necessary adjustments if myaudits or inspections idcntify
discrepancies in the records.
ECOLOGY reserves the right to audit, of- have designated third party audit, applicable records to ensure that the state
has been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed will be
enforced. Repetitive instances of incorrect invoicing or inadequate records may be considered cause for termination.
All work performed under this Agreement and any property and eqLliplllellt purchased shall be made available to
ECOLOGY and to any authorized state, federal or local representative for inspection at any time (hiring tile course of
this Agreement and for at least three (3) years following grant of, loan termination or dispute resolution hereunder.
RECIPIENTshall provide right of access to ECOLOGY, or any other authorized representative, at all reasonable times,
in order to monitor and evaluate performance, compliance, and any other conditions under this Agreement,
Version 10/30/2015
State of Waillington Department offxolog\
Agreement No SIIPREG-101 7-KiCoUNI-000,63
Project Title Regional oil spill and hu -neat incident response and r0t)UrCe iMIMS111011
Recipient Name Kittims Counts slient),
22 RECOVERY OF FUNDS
The right or the RECIPIENT to retain monies received as reinibUrSC111011t PaYBIC[ItS is Contingent Upon SaliSfi`1001-y
performance of this Agreement and completion of the work described in the Scope or Work.
All payments to the RECIPIENT are subject to approval and audit by ECOLOGY, and any unauthorized expenditure(s)
or unallowable cost charged to this Agreement shall be refunded to ECOLOGY by the RECIPIENT.
RECIPIENT shall refund to ECOLOGY the full anIOLInt of any el-1-011COUS payment or overpayment Under this
Agreement.
RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction orpayments or repayments
within thirty (30)days oCawritten notice. Interest will accrue at the rate or twelve percent ( 12%) per year from the
time ECOLOGY demands repayment or Funds.
Any property acquired Under this Agreement, at the option of ECOLOGY, may become ECOLOGY's property and the
RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value oCsuch property.
23. SEVERABlLfTY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid,
such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid
provision, and to this end the provisions of this Agreement are declared to be severable.
24. S'I*A,rE ENVIRONMENTAL POLICY ACT(SEPA)
RECIPIENT must demonstrate to ECOLOGY's satisfaction that compliance with the requiremetits of the State
Environmental Policy Act (Chapter 43.2 tC RCW and Chapter 197-11 WAC) have been or will be met. Any
reimbursements are subject to this provision.
25. SUSPENSION
Wheii in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement or
any portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT. RECIPIENT shall
resume performance on the next business (lay following the suspension period unless another (lay is specified by
ECOLOGY.
26. SUSTAINABLE PRACTICES
In Order to sustain Washington's natural resources and ecosystems, the RECIPIENT is fully encouraged to implement
stistaiiiable practicesand to purchase environmentally prcfierablc pr0dL1CtS tinder this Agreement.
a) Sustainable practices may include such activities as: use ofc1can energy, use oFdouble-sided printing, hosting low
impact meetings, and setting tip recycling art([ composting programs.
b) Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers
and imaging equipment, hidependently certified green cleaning products, remanufactured toner cartridges, products
with reduced packaging, office products that are refillable, rechargeable, and recyclable, and 100% post -consumer
recycled paper.
For [note suggestions visit ECOLOGY's web page: Green Purchasing, littp://wvw.ecy.wa.gov/progi-aiiis/s%vfi/opl).
27, TERM NiATION
a) For Cause
ECOLOGY may terminate for caLISC this Agreement with seven (7) calendar days prior written notification to tile
RECIPIENT, at the sole discretion of ECOLOGY, for failing to perform an Agreement requirement or For a material
breacliof,iiiytenniot-cotidition. If this Agreement is so terminated, the parties shall be liable only for performance
rendered or costs incurred in accordance with the terms of this Agreement prior to the effective (late of termination.
Failure to Commence Work, ECOLOGY reserves the right to terminate this Agreement if RECIPIEN'r rans to
commence work on the project funded within Four (4) months after the effective date of this Agreement, or by any date
Version 10/30/2015
Page 17 of N
State of Washington Department of Ecology
Aizreement No SPPREG-20 t 7-KICOFAI-00003
Prqject 11fle Regional mi spill and hoz-111itt meldent response and resource ickluisition
Recipient Name Kittims Comm. Sherif'
mutually agreed upon if) writing For commencement of work, or tile time period defined within the Scope of Work.
Non- Pei, rormance, -File obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by the
RECIPIENT oral[ OF its obligations under this Agreement. In the event the RECIPIENT UnJustirtably fails, in the
opinion or ECOLOGY, to perform all), obligation required of it by this Agreement, ECOLOGY may refuse to pay ally
Farther funds, terminate in whole of, in part this Agreement, and exercise any other rights Under this Agreement.
Despite the above, the RECIPIENT shall not be relieved of any liability to ECOLOGY For damages sustained by
ECOI,OGYaticIttieSt-,it.cofWasilitigtolibecatiscofaiiybreaci)oCtliisAgi-eciiictitbyt1icRECIPIF.N,r. ECOLOGY
may withhold payments for the purpose OCSOtOff Until such tune M the exact aniount or damages (tile ECOLOGY from
the RECIPIENT is determined,
b) For Convenience
ECOLOGY may terminate for convenience this Agreement, in whole of in part, for any reason when it is tile best
interest of ECOLOGY, with a thirty (30) calendar days prior written notification to the RECIPIENT, except as noted
below. I f this Agreement is so terminated, the parties shall be liable only for performance rendered or costs incurred in
accordance with the terms of this Agreement prior to the effective (late of termination.
Non -Allocation or Funds. ECOLOGY's ability to make payments is contingent on availability of funding. In the event
funding from state, federal. of, other sources is withdrawn, reduced, or limited in any way after the effective date and
prior to the completion or expiration (late orthis Agreement, ECOLOGY, at its sole discretion, may elect to terminate
the Agreement, in whole or part, of, renegotiate the Agreement, subject to new funding limitations or conditions.
ECOLOGY may also elect to suspend performance of the Agreement until ECOLOGY determines the ftinding
insufficiency is resolved. ECOLOGY may exercise any orthese options with no notification or restrictions, although
ECOLOGY will make a reasonable attempt to provide notice.
If payments have been discontinued by ECOLOGY due to unavailable funds, the RECIPIENT shall not be obligated to
repay monies which had been paid to the RECIPIENT prior to such termination.
RECIPIENT's obligation to continue or complete tile work described in this Agreement shall be contingent upon,
availability of funds by the RECIPIENT's governing body.
c) By IVilitUal Agreement
ECOLOGY and the RECIPIENT may terminate this Agreement, in whole or in part, it any time, by IllUtUal written
agreement.
(1) In Event offernlination
All finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, reports or other
materials prepare([ by tile RECIPIENT Under this Agreement, at the option of ECOLOGY, will become property of
ECOLOGY and tile RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work
completed oil such documents and other materials.
Nothing contained herein shall preclude ECOLOGY from demanding repayment ofall funds paid to the RECIPIENT in
accordance with Recovery or Funds, identified herein.
28. THIRD PARTY BENEFICIARY
RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENTPUrSUallt to this Agreement, tile state
of Washington is named as an express third party beneficiary of such subcontracts with full rights as such.
29. WAIVER
Waiver Ora deft -cult or breach of any provision orthis Agreement is not a waiver Of any SUbseqUellt derault or breach,
and will not be construed as a modification oFthe terms oFthis Agreement unless stated as such in writing by the
Version 10/3012015
Pau IS of' 19
State of washin6ton Deparmtent nr ficologc
\�recntent No SPPRt:G•Z017-ltiC'otlt00063
Prgject Title Regional oil spill and h.vnrtt incident response and resource acquisition
Recipient Name Kittims Comm Sheriff
authorized representative of ECOLOGY.
GENERAL TERtNIS AND CONDITIONS LAST UPDATED 12/27/2016
Version 10/30/2015
Parte 19 or 14