Background
Kittitas County imposes a lodging tax assessed on the sale or charge made for furnishings of
lodging according to RCW 67.28.180 and RCW 67.28.181. In accordance with the tax and
Washington State law, a Lodging Tax Advisory Committee (LTAC) has also been established.
The committees’ purpose is to advise and recommend to the Board of County Commissioners
how excise taxes on lodging should be allocated to support tourism which in turn generates
revenue.
Uses According to Law:
RCW 67.28.1816 states the following:
Lodging tax revenues under this chapter may be used, directly by any municipality or indirectly
through a convention and visitor bureau or destination marketing organization for: …(c)
Supporting the operations and capital expenditures of tourism-related facilities owned or
operated by a municipality…
Definitions included in state law which should be considered in any application requesting
funding include:
1. Tourism means economic activity resulting from tourists, which may include sales of
overnight lodging, meals, tours, gifts, or souvenirs.
2. Tourism promotion means activities, operations, and expenditures designed to
increase tourism, including but not limited to advertising, publicizing, or otherwise
distributing information for the purpose of attracting and welcoming tourists;
developing strategies to expand tourism; operating tourism promotion agencies;
and funding marketing or the operation of special events and festivals designated to
attract tourists.
3. Tourism-related facility means real or tangible personal property with a usable life of
three or more years, or constructed with volunteer labor that is: (a) (i) owned by a
public entity; …and (b) used to support tourism, performing arts, or to accommodate
tourist activities.
Grant Program Description
This grant program is one component of an overall strategy to enhance the economic value of
tourism in Kittitas County. The intent of the program is to develop and implement a Capital
Improvement Plan (CIP) for developing tourism-related, large-scale municipality-owned
projects throughout the County which contribute to that strategy.
Kittitas County Tourism Infrastructure Plan:
As the basis for developing this grant program and the CIP, the Board of County Commissioners
(BOCC) adopted the Kittitas County Tourism Infrastructure Plan. The plan includes, among
other things, an inventory of tourism-related facilities across the County, an evaluation of
potential tourism opportunities, goals for guiding tourism development, and a list of prioritized
Lodging Tax Grant Program for Tourism-Related, Large-
Scale, Municipality-Owned Capital Projects
actions for implementation. The plan was created with the assistance and input of various
tourism-related interest groups from across the County through a process of open meetings,
tourism surveys, open house events, focus group meetings and data research.
Municipality Ownership:
In order to be eligible for funding under this program, projects must be owned by a municipality
in Kittitas County. Projects may be privately developed, but must be transferred to municipality
ownership at completion. Proof of ownership and/or transfer agreements may be a
requirement of any funding award and reimbursement request.
Application Process:
Projects seeking funding assistance within this grant program must complete each step of a
four-step grant process.
Figure A:
The intent of the process is to create the CIP with potential projects which are eligible under
state law for receiving lodging tax funds. The list will be prioritized based on criteria derived
from the Kittitas County Tourism Infrastructure Plan. Projects must successfully navigate
through each step of the process to remain in the CIP. The CIP will be updated through this
application process at least once every five (5) years.
The CIP is managed by the County’s LTAC, with assistance from County staff and a Technical
Review Team (TRT) and as approved by the BOCC, through the four-step process described
above in Figure A. The TRT is an advisory body made up of 5 to 7 members to include
volunteers with industry experience and technical knowledge in planning, design, and
development of projects. Although the TRT may also include County staff, it is not intended to
duplicate other county or city permitting, planning, or project comp liance processes. Its scope
is to assure that the CIP strategic intent is met, that information provided in the project
application remains current and is accurate, and to advise the LTAC of the applicant’s
completion of each project requirement at each step. All members of the TRT are appointed by
the BOCC.
Steps 1 and 2 determine a project’s eligibility for funding consideration. Projects are eligible for
funding consideration in Steps 3 and 4 of the process. However, it should be noted that
completion of Steps 1, 2, and/or 3 is not a guarantee of future funding. Projects which become
Application
for CIP List
Step
1
Feasibility
Analysis
Step
2
•Design
•Permitting
Step
3 Construction
Step
4
eligible for funding consideration must compete with all other eligible projects as funds become
available. All funding decisions are subject to recommendation of the LTAC and approval by the
Board of County Commissioners. Awards may be authorized for projects which have completed
Steps 1 and 2 annually as funding allows, and may include consideration of how a project ranks
in priority with regard to all other eligible projects, project readiness, and other factors as
determined by the LTAC. All eligible projects which have completed Steps 1 and 2 of this
process will be notified each year when funding is available, the amount of funding, and the
process for funding decisions. It is the intent of this process that project funding will be
considered annually.
It is not the intent of this process to be the sole funding source for any non-county owned
project and some county-owned projects. Strict minimum matching fund commitments will be
required from all non-county owned projects as well as from some county-owned projects (see
page 7 “Matching Funds Requirements”.
Each step of the process is illustrated in figure 2 and further described as follows:
Step 1 – Application for CIP Project List
Applicants must first apply and be approved to be included in the program’s CIP. In order to
generate the program’s CIP, the County will request project proposals at least once every five
years. To facilitate this process, the County’s LTAC will create an application form to use in
evaluating proposals. Applicants must fill out the form and submit it to the LTAC. The LTAC will
review the proposals and make recommendations for creating the list of projects for the
program’s CIP to the Board of County Commissioners. All applications will be rated and ranked
according to the rating sheet included in this packet. The Board of County Commissioners will
make the final decision to approve or reject the list.
Step 2 – Feasibility Analysis
Applicants whose projects are included in the program’s capital improvement plan shall
propose a scope of work to determine overall project feasibility. The scope of work will be
included in a Step 2 agreement between the applicant and the County. The LTAC shall manage
all agreements and will submit the proposed Step 2 agreement to the TRT for recommendation.
The LTAC and the TRT may recommend modifications to the scope of work for project feasibility
requirements as necessary. Feasibility requirement may include, but are not limited to, long
term operations and management plan, site evaluations, funding mechanisms, market analysis,
business plan development, etc. The LTAC’s and TRT’s recommendations shall be submitted to
the Board of County Commissioners for final approval. No funding will be included in Step 2
agreements.
Step 2 agreements will be reviewed at least annually by the LTAC and the TRT to assess
progress and review compliance. The LTAC and the TRT may meet more frequently if needed
and/or requested by the applicant. Applicants who do not meet Step 2 agreement
requirements within the timeframe outlined in the agreement will not continue in this program
or remain on the CIP.
Step 2 agreement amendments, including the addition of requirements, modifications of
existing requirements, or time extensions shall be reviewed by the LTAC and the TRT.
Recommendations from the LTAC and the TRT shall be submitted to the Board of County
Commissioners for final decision.
Applicants must complete all Step 2 agreement requirements prior moving to Step 3 in this
process. To be considered complete, an applicant must request a review for completeness
from the LTAC and the TRT. The LTAC and the TRT shall review the Step 2 agreement
requirements and submit a written recommendation to the Board of County Commissioners for
approval.
If a project is accepted as part of the County’s CIP and at the time of acceptance it has
completed feasibility analysis and requirements , a Step 2 agreement may not be required.
Applicants may be granted a waiver from the Step 2 agreement requirement by making request
to the LTAC and the TRT for review of complete feasibility work and requirements. The LTAC
and the TRT shall review the waiver request and supporting documentation and submit a
recommendation to the BOCC. The BOCC shall have the final authority to accept or reject the
recommendation.
Step 3 – Design and Permitting
Applicants whose projects meet all the requirements of their Step 2 agreement shall propose a
scope of work for final project planning, design and permitting to the LTAC for approval. The
scope of work will be included in a Step 3 agreement between the applicant and the County.
The LTAC will submit the Step 3 agreement to the TRT for recommendation. The LTAC and the
TRT may recommend modifications to the proposed scope of work for final project planning,
design and permitting requirements necessary. The TRT shall limit its review to assuring
completion of project design, planning and permitting requirements; its function is considered
non-duplicative of other county and city permitting, planning, and project completion
requirements and it shall have no authority to make recommendations or decisions with regard
to funding.
The LTAC shall consult annually with county financial staff as directed by the County Auditor
and shall consider all eligible Step 3 and Step 4 agreements along with available funding
resources. The LTAC shall provide a written recommendation for funding eligible Step 3 and
Step 4 agreements to the Board of County Commissioners for consideration. The
recommendation shall include which agreements to fund , the funding amount for each, and a
written explanation for the recommendation. The recommendation shall also include a listing
of the currently eligible projects requesting funding which are not included in the
recommendation. Applicants will only be held to the timeframe requirements included in Step
3 and Step 4 agreements if adequate funding is awarded. The Board of County Commissioners
shall either accept or reject the recommendation from the LTAC.
Step 3 agreements will be reviewed at least annually by the LTAC and the TRT to assess
progress and review compliance. The LTAC and the TRT may meet more frequently if needed
and/or requested by the applicant. Applicants who do not meet Step 3 agreement
requirements within the timeframe outlined in the agreement will not continu e in this program
or remain on the CIP. However, projects may reapply to be placed on the CIP during the next
project application cycle.
Step 3 agreement amendments shall be reviewed by the LTAC and the TRT Recommendations
from the LTAC and the TRT for amendments shall be submitted to the Board of County
Commissioners for final decision.
Applicants must complete all Step 3 agreement requirements prior moving to Step 4 in this
process. To be considered complete, an applicant must request a review for co mpleteness
from the LTAC and TRT. The LTAC and the TRT shall review the Step 3 agreement requirements
and submit a written recommendation to the Board of County Commissioners for approval.
If a project is accepted as part of the County’s CIP and at the time of acceptance it has has
completed design and permitting, a Step 3 agreement may not be required. Applicants may be
granted a waiver from the Step 3 agreement requirement by making request to the LTAC and
TRT for review of design and permitting work and requirements. The LTAC and TRT shall review
the request and supporting documentation received and submit a recommendation to the
BOCC. The BOCC shall have the final authority to accept or reject the recommendation.
Step 4 – Project Construction and Closeout Reporting
Applicants whose projects meet all the requirements of the Step 3 agreement shall propose a
scope of work for a Step 4 agreement for project construction and closeout to the LTAC and TRT
for approval. The LTAC will submit the step 4 agreement to the TRT for recommendation. The
LTAC and the TRT may recommend modifications to the proposed agreement as necessary. The
TRT shall limit its review to assuring completion of project construction and closeout; its
function is considered non-duplicative of other county and city permitting, planning, and
project completion requirements and it shall have no authority to make recommendations or
decisions with regard to funding.
The LTAC shall consult annually with county financial staff as direc ted by the County Auditor
and shall consider all eligible Step 3 and Step 4 agreements along with available funding
resources. The LTAC shall provide a written recommendation for funding eligible Step 3 and
Step 4 agreements to the Board of County Commissioners for consideration. The
recommendation shall include which agreements to fund , the funding amount for each, and a
written explanation for the recommendation. The recommendation shall also include a listing
of the currently eligible projects request ing funding which are not included in the
recommendation. The Board of County Commissioners shall either accept or reject the
recommendation from the LTAC.
Step 4 agreements will be reviewed at least annually by the LTAC and the TRT to assess
progress and review compliance. The LTAC and the TRT may meet more frequently if needed
and/or requested by the applicant.
Step 4 agreement amendments shall be reviewed by the LTAC and the TRT. Recommendations
from the LTAC and the TRT shall be submitted to the Board of County Commissioners for final
decision. . Recommendations from the LTAC shall be submitted to the Board of County
Commissioners for final decision.
Upon project completion, all step 4 agreements must be submitted to the LTAC and TRT for a
review of completeness. The LTAC and TRT shall meet as needed to review project
completeness for Step 4 agreements. The LTAC and TRT shall submit a written
recommendation regarding their finding of project completeness to the Board of County
Commissioners for acceptance and final project closeout.
Matching Funds Requirements:
All non-county owned projects require matching funds of at least 50% of total projects costs.
Matching funds may be in the form of cash or verifiable in-kind contributions. At the time of
funding considerations (Step 3 and 4), applicants will be required to provide proof of matching
funds.
County-owned projects which are located within another municipality or are located on
publicly-owned property which is owned by an entity other than Kittitas County shall also be
subject to the same 50% matching funds requirements as described above. Coun ty-owned
projects which are located in unincorporated lands and which are not located on land which is
publicly-owned by an entity other than Kittitas County are not subject to any matching
requirements.
Figure 2
Application Definitions:
Below is a list of terms and phrases which have a specific meaning within this application. It
may be helpful for you to review these as you prepare responses so that a better understanding
of the reviewer’s expectations may be obtained.
Capital Asset is any type of property that has a useful life longer than one year and is
valued at over $5,000.
Construction or “Hard” Costs are the direct contractor costs for labor, material,
equipment and services; contractor’s overhead and profit, and other dir ect construction
costs. These costs do not include the compensation paid to architects, engineers, or
consultants, the cost of land, rights-of-way, or other similar costs.
Large-scale, as it relates to projects which may be eligible for being listed on the
County’s CIP for tourism infrastructure as well as potential funding through this grant
process, are projects requesting funding of $50,000 or more.
Matching Funds is the amount of funding your organization has secured and is
contributing to the project. This includes both direct and indirect support. Direct fund s
can be in the form of cash funding from your organization or funding secured elsewhere
but dedicated to the project such as other grants, loans, donations, etc. Indirect funding
support includes in-kind support like labor, volunteer support, supplies, and services
which directly relate to the project, including those supplied by your organization and
others. A combination of direct and indirect support may be utilized as matching funds.
Municipality is a city, county, or town.
Real Property is fixed property, principally land and buildings.
Soft Costs are cost items in addition to the direct construction cost. These
generally include architectural and engineering, permits and fees, financing fees,
construction interest and operating expenses, leasing and real estate commis sions,
advertising and promotion, and supervision.
A Tourist is defined as a person traveling away from their place of residence or business and
staying overnight in paid accommodations; to a place fifty miles or more one way from their
place of residence or business for the day or staying overnight; or from another country or state
outside of their place of residence or their business.
Please return ONE COPY of the entire original application and answers to narrative questions to:
Kittitas County Commissioners
Attn: Lodging Tax Grant Application
205 West 5th, Suite 108, Ellensburg, WA 98926
Applications must be received no later than 5:00 PM, TBD or postmarked no later than TBD.
Incomplete and/or late applications will not be considered. Applications may not be changed or
amended by the applicant after the deadline for submission
Schedule:
Application deadline TBD
Oral presentations of proposals to LTAC and LTAC recommendation TBD
BOCC deliberation and decision TBD
Project Management:
As discussed in the grant process section of this application packet, successful applicants shall be
required, as a condition of inclusion in the County’s CIP for tourism infrastructure and any funding
award (as available), to enter into a contract. The contract may include, but not be limited to, the
specific conditions or deliverables the applicant must meet in order to continue to progress through
each step of this process, the specific amount of any award if a project becomes eligible for funding and
what it may be used for, all reporting requirements associated with this funding, payment terms, and
any and all other appropriate terms of the funding. Kittitas County will be the contracting agent for all
approved projects.
All funds awarded under this program will be available in the form of reimbursable grants. The funds for
capital projects will be available for reimbursement as of the date of the contract and will remain
available for the term defined in the contract. Any unexpended funds will be returned to the Lodging
Tax account made available for re-appropriation. All requests for reimbursement shall be made to the
Kittitas County Auditor’s office at the following address:
Kittitas County Auditor
Attn: Lodging Tax Grant Funds Reimbursement
205 W 5th, Suite 105
Ellensburg, WA 98926
For specific information and requirements regarding the reimbursement process, please contact the
Auditor’s office at 509-962-7504.
Project Reporting Requirements for Tourism-Related Facilities:
State law requires that all recipients of Lodging Tax revenues must submit a report to the municipality
describing the actual number of people traveling for business or pleasure on a trip:
A. Away from their place of residence or business and staying overnight in paid accommodations;
SUBMITTAL INSTRUCTIONS
B. To a place fifty miles or more one way from their place of residence or business for the day or
staying overnight; or
C. From another country or state outside of their place of residence or their business.
A report form will be provided as part of the contract for receiving funds. We ask that you provide this
information within 60 days after your project is complete.
Applicant Eligibility:
This grant process for lodging tax funds is available only for large-scale tourism capital projects which
are municipality-owned. All applicants must be a municipality in Kittitas County. One capital project is
allowed per application. There is no limit to the number of applications a municipality may submit per
cycle. Projects must be compatible with the Kittitas County Tourism Infrastructure Plan as a low,
medium, or high priority to be eligible for inclusion in the CIP.
Other Information:
Insurance: As part of its contract for performance, a municipality may require contractors to maintain
liability insurance in the amount of $1,000,000 or more and name the municipality as an additional
insured on its liability insurance policy.
Application Form: This packet will be available on Kittitas County’s website as a word document and as
a pdf. It can also be obtained directly as a hard copy or in digital format by contacting the Kittitas
County Board of Commissioners office at 509-962-7508. Kittitas County’s website address is:
www.co.kittitas.wa.us.
Applicant Information
Name of Municipality: _______________________________
Mailing Address: ________________________________
________________________________
Contact Person and Title: ________________________________
Phone: ________________________________
Email: ________________________________
Project Title: ________________________________
Project Location: ________________________________
Application Requirements
____ 1. The project qualifies for lodging tax funds as a capital expenditure of a tourism-
related facility owned or operated by a municipality.
____ 2. If this application is not from Kittitas County, the municipality’s lodging tax advisory
committee (or equivalent) has been informed of the project and endorsed it. A letter
from the municipality is included.
____ 3. Lodging tax capital project funds are not being substituted for other funds that are
already secured or applied for (if applicable).
____ 4. A completed project budget is included in the application.
____ 5. A detailed 8 ½ X 11 vicinity map that clearly shows the location of the project is
included.
APPLICATION FOR TOURISM-RELATED, LARGE-SCALE
MUNICIPALITY-OWNED CIP LISTING
Tourism-Related, Large-Scale Municipality-Owned Capital Project Narrative
1. Project Description: Please describe the project in detail. Indicate the major work to be
completed, any milestones that need to be overcome in order for the project to move forward,
and include a comparison of existing and proposed conditions.
2. Kittitas County Tourism Infrastructure Plan: Please explain how the project meets the Goals
and Actions in the Kittitas County Tourism Infrastructure Plan as adopted. Also, describe the
specific county tourism infrastructure needs the project addresses and how the project directly
increases tourism. Explain how the improvements will promote tourism in Kittitas County and
indicate specifically how the improvements will directly increase economic activity resulting
from tourists.
3. Real Property: If real property acquisition is a component of the project, please explain.
Include any information of property already secured or evidence of the ability to secure the real
property.
4. Coordination: Please explain how this project has been coordinated with other jurisdictions
as well as affected stakeholders. Please include letters of support from stakeholders.
5. Studies: Please attach any feasibility or other studies that demonstrate linkages between
the proposed project and the anticipated tourism impacts. Also please include your
operations/maintenance strategy and other plans for long-term project sustainability (how the
facility or facilities will be operated and maintained over at least five years following
completion).
6. Project Readiness: Please provide a detailed project schedule, including milestones
necessary for completion as mentioned in question 1 above. On the schedule, indicate items
completed and exactly where in the schedule the project is at this time. Be sure to include
expected completion date.
7. Applicant Certification: Please sign below in agreement with the statement of certification.
Certification is hereby given that the information provided is accurate and the applicable
attachments are complete and included as part of the application package.
I further certify that the application thresholds are met at the time of application.
______________________________ ____________________ _______________
Signature of Official Representative Title Date
Tourism-Related, Large-Scale Municipality-Owned Capital Project Budget
All applicants must supply a detailed and complete project budget utilizing the following basic
format:
Funding Sources
Lodging Tax Funds Request
*Other Grant Funds
List By Source (indicate if secured or applied)
*Other Local Government Funds
List By Source (may include in-kind)
*Private Funds
List By Source (may include in-kind)
Total Available Funding
Project Expenses
Real Property or “Right-of-Way” Acquisition Cost
Capital Asset Cost
Construction Cost or “Hard” Cost
Include an itemized list of general costs
For example: asset type and cost, site prep, building foundation and structure,
mechanical work, finish work, site restoration, electrical work, technology, etc.
Soft Cost
Include an itemized list of soft costs
For example: feasibility analysis, design fees, construction management fees,
survey costs, engineering fees, permitting costs, special inspections, cultural
resource surveys, etc.
Total Project Costs
This project budget, being submitted as part of this application, will be considered an estimate.
As the project progresses through the four-step process, applicants will be required to update
the project budget as more information becomes available and at the time of funding award.
*At the time funding awards are being considered (Steps 3 and 4), v erifying documentation
shall be required and attached to the final project budget. Verifying documentation may
include award letters, letters of commitment, or loan approval documentation. If the funding
source includes applicant funds, proof of available funding in the form of a letter of
commitment from an authorized body or representative of the applicant is adequate.
Ratings Criteria and Score Card
Tourism-Related, Large-Scale, Municipality-Owned Capital Projects
1. Criteria: Kittitas County Tourism Infrastructure Plan
Points Possible: 60 Score Awarded: _____
How closely does the application
meet the goals to further
geotourism opportunities as
presented in Section 6 of the Plan?
Up to 20 points
Awarded:
_______
Comments:
How closely related is the
application to the high, moderate,
or low priority Action Tasks
contained in Section 7 of the Plan?
High = 20
Moderate = 15
Low = 10
Awarded:
________
Comments:
How effective will the project be
in directly promoting tourism and
increasing economic activity
resulting from tourists?
Up to 20 Points
Awarded:
________
Comments:
2. Criteria: Stakeholder Support
Points Possible: 10 Score Awarded: _____
Has the applicant clearly described
how the project is being
coordinated with other interested
parties? Are the stakeholders
supportive?
Up to 10 points
Awarded:
________
Comments:
3. Criteria: Project Readiness and Feasibility
Points Possible: 30 Score Awarded: _____
Can the project be completed
within 5 years?
Yes = 10
No = 0
Awarded:
________
Comments:
Has the applicant clearly
articulated a feasible long term
maintenance and operations
strategy for the project?
Up to 20 points
Awarded:
________
Comments: