HomeMy WebLinkAboutCRPTaneumRoadKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: February 7`h, 2017 ACTION REQUESTED: Approve County Road Project for the repair and re-establishment of Taneum Road from MP 3.80 to MP 3.98 BACKGROUND: Currently Taneum Road from MP 3.80 to MP 3.98 is restricted to one lane of traffic and under a stop controlled condition. This was required due to the washout and erosion of the roadway by Taneum Creek during a high flow event in 2016. Public Works intends to design the project in house which will include repair of the roadway, bank and stream stabilization measures, and possibly some realignment in order to re-establish two lanes of traffic. During the budget adoption process the BOCC recommended including the proposed project and adopted it as part of the 2017 budget. The project is formally included in the annual construction program for 2017. Upon CRP approval the project will be designed and constructed by Public Works staff in 2017. The project will be paid using county road funds. INTERACTION: Public Works RECOMMENDATION: Board of County Commissioners to approve and sign the CRP form for the Taneum Road Realignment — Slope Stabilization MP 3.80 to MP 3.98 Project. HANDLING: Return one original to Public Works ATTACHMENTS: CRP form for Board approval LEAD STAFF: Lucas Huck County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 274-17 JOB NO: RC1571-E1 IT IS HEREBY RESOLVED that the Taneum Road from MP 3.80 to MP 4.00 be improved as follows: Repair a portion of the roadway that has washed out; construct slope stabilization, re -align, and re-establish two lanes of traffic. ARTERIAL ACCESS ❑ This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of Public Works' estimate, is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 90,000 CONSTRUCTION ENGINEERING $ 19,000 RIGHT-OF-WAY ACQUISITION $ 20,000 SUB -TOTAL $ 129,000 COUNTY FORCES CONSTRUCTION $ 0 CONTRACT CONSTRUCTION $ 626,000 SUB -TOTAL $ 626,000 TOTAL PROJECT COST $ 755,000 GRANT OR OTHER FUNDS $ Grant Source: WSDOT is TOTAL COUNTY ROAD FUND ALLOCATION 755,000 i G. Lucas Ruck, P.E. County Engineer ® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM AS ITEM NO. 04 ❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: ® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. ADOPTED this 7th day of February 2017. Attest: Clerk of the Board BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Vice -Chair Commissioner