My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Set PHearing_Condemnation Authority_WhiskeyCreek
>
Meetings
>
2025
>
09. September
>
2025-09-16 10:00 AM - Commissioners' Agenda
>
Set PHearing_Condemnation Authority_WhiskeyCreek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 12:15:16 PM
Creation date
9/11/2025 12:14:10 PM
Metadata
Fields
Template:
Meeting
Date
9/16/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing to consider the Exercise of Condemnation Authority under RCW 8.08.010 for the Acquisition of Right of Way and a Temporary Construction Easement for Flood Mitigation on Whiskey Creek, RE Parcel Numbers 962710 and 962712
Order
8
Placement
Consent Agenda
Row ID
135628
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA DATE: <br />ACTION REQUESTED: <br />AGENDA STAFF REPORT <br />September 16, 2025 <br />Request to Set a Public Hearing on October 21, <br />2025, at 2:00 pm local time to consider the Exercise <br />of Condemnation. Authority Under RCW 8.08.010 <br />for the Acquisition of Right of Way and a <br />Temporary Construction Easement for Flood <br />Mitigation on Whiskey Creek, RE Parcel Numbers <br />962710 and 962712. <br />BACKGROUND: The Whiskey Creek at Ellensburg Water Company <br />Siphon Project is identified in the Flood Control <br />Zone District Capital Improvement Plan. This <br />project aims to reduce flooding impacts from <br />Whiskey Creek at Bender Road and the Ellensburg <br />Water Company (EWC) canal crossing by <br />increasing flood conveyance capacity along <br />Whiskey Creek. <br />INTERACTION: <br />The project requires a temporary construction <br />easement for 24,501 square feet of property on <br />parcels 962710 and 962712, as well as a right-of- <br />way acquisition for 9,230 square feet on parcel <br />962710. The right-of-way acquisition is necessary <br />for the flood mitigation siphon project to ensure that <br />the Ellensburg Water Company retains its current <br />ability to conduct operational spills at this location. <br />Kittitas County has submitted two written offers to <br />the property owner but has not been able to reach a <br />voluntary agreement. <br />Public Works; Prosecuting Attorney <br />RECOMMENDATION: Set a Public Hearing on October 21, 2025, at 2:00 <br />pm local time to consider the Exercise of <br />Condemnation Authority Under RCW 8.08.010 for <br />the Acquisition of Right of Way and a Temporary <br />Construction Easement for Flood Mitigation on <br />Whiskey Creek, RE Parcel Numbers 962710 and <br />962712. <br />
The URL can be used to link to this page
Your browser does not support the video tag.