My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Acceptance Letter_Change Order No5
>
Meetings
>
2025
>
04. April
>
2025-04-01 10:00 AM - Commissioners' Agenda
>
Change Order Acceptance Letter_Change Order No5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:05:16 PM
Creation date
3/27/2025 12:05:13 PM
Metadata
Fields
Template:
Meeting
Date
4/1/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 5 for the Lower County Transfer Station
Order
11
Placement
Consent Agenda
Row ID
129428
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br /> <br />March 24, 2025 <br /> <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 5 <br /> <br />Mr. Nelson, <br /> <br />I am writing to formally acknowledge and award change order number 5, addressing partial <br />acceptance of Change Order Proposal (COP) #09, for the increase of the tipping floor height and <br />addition of retaining walls. <br /> <br />Approved Items: <br />• Inside Tunnel Footings – $7,290.00 <br />• Stair Footing Reduction – <$23,400.00> <br />• Outside Tunnel Wall Reduction – <$80,680.00> <br />• Tunnel Wall to Bottom of Slab – $31,150.00 <br />• Piers Increase Height – $6,380.00 <br />• Bollards – $9,000.00 <br />• Retaining Wall Footings – $63,700.00 <br />• Added Exterior 4' Wall – $35,380.00 <br />• Exterior Retaining Walls – $91,040.00 <br />• Cold Weather Protection – $17,600.00 <br />• Concrete Sidewalk – $816.00 <br />• Exterior Concrete Curb – $21,220.00 <br />• Additional Rebar – $25,576.00 <br /> <br />The approved subtotal for these items is $204,072.00. Overhead, profit, and bonding costs for this <br />approved scope have been calculated proportionally to the accepted work. <br /> <br />Subtotal of changes $ 204,072.00 <br />Overhead 3% $ 6,122.16 <br />Profit 10% $ 20,407.20 <br />Bonding 1.5% $ 3,061.08 <br />TOTAL $ 233,662.44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.