<br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br /> <br />March 24, 2025 <br /> <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 5 <br /> <br />Mr. Nelson, <br /> <br />I am writing to formally acknowledge and award change order number 5, addressing partial <br />acceptance of Change Order Proposal (COP) #09, for the increase of the tipping floor height and <br />addition of retaining walls. <br /> <br />Approved Items: <br />• Inside Tunnel Footings – $7,290.00 <br />• Stair Footing Reduction – <$23,400.00> <br />• Outside Tunnel Wall Reduction – <$80,680.00> <br />• Tunnel Wall to Bottom of Slab – $31,150.00 <br />• Piers Increase Height – $6,380.00 <br />• Bollards – $9,000.00 <br />• Retaining Wall Footings – $63,700.00 <br />• Added Exterior 4' Wall – $35,380.00 <br />• Exterior Retaining Walls – $91,040.00 <br />• Cold Weather Protection – $17,600.00 <br />• Concrete Sidewalk – $816.00 <br />• Exterior Concrete Curb – $21,220.00 <br />• Additional Rebar – $25,576.00 <br /> <br />The approved subtotal for these items is $204,072.00. Overhead, profit, and bonding costs for this <br />approved scope have been calculated proportionally to the accepted work. <br /> <br />Subtotal of changes $ 204,072.00 <br />Overhead 3% $ 6,122.16 <br />Profit 10% $ 20,407.20 <br />Bonding 1.5% $ 3,061.08 <br />TOTAL $ 233,662.44 <br />