Laserfiche WebLink
HT Outlook <br />Transfer Station arch and struct revised 11-2$-2024.pdt <br />From Brandon Drexler <brandon@belsmith.com> <br />Date Wed 11/2012024 2:16 PM <br />To Kyle Miller <kmiller@seaconllc.com> <br />Cc Bryan <bryan@belsmith.com>; Riley Eres <riley@belsmith.com>; Otis Lewis <otis@belsmith.com> <br />[l| 1 attachment (4 MB) <br />Transfer Station arch and struct revised 11-20-2024.pdf, <br />Kyle, <br />This is the latest version of the transfer station- Notice the new siding atop of the tunnel openings and <br />along the area of that steel push wall. Nothing else should have changed for you in terms of structural <br />lll give you a call in a few minutes if you are around <br />Brandon