AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents”
<br />are trademarks of The American Institute of Architects. This draft was produced at 12:36:58 PT on 07/15/2024 under Order No.4104243047 which
<br />expires on 09/08/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®
<br />Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
<br />1
<br />User Notes: (810440546)
<br />
<br />® AIA Document A101® – 2017
<br />Standard Form of Agreement Between Owner and Contractor
<br />
<br />AGREEMENT made as of the 3rd day of September in the year 2024.
<br /> BETWEEN the Owner:
<br />
<br />Kittitas County
<br />205 West 5th Avenue, Suite 108
<br />Ellensburg, Washington 98926-2887
<br />
<br />and the Contractor:
<br />
<br />Belsaas & Smith Construction, Inc.
<br />PO Box 926
<br />Ellensburg, WA 98926
<br />
<br />
<br />for the following Project:
<br />
<br />Lower Valley Transfer Station 2600 West
<br />Green Avenue
<br />Ellensburg, Washington 98950
<br />
<br />The project includes the following components as defined by the contract documents, including, but not limited to:
<br />
<br />1. Mobilization and demobilization of equipment and personnel for the project.
<br />2. Construction layout and surveying, including location of existing, below grade and above grade utilities
<br />in the work area.
<br />3. Establishment and maintenance of erosion and sediment control throughout the project.
<br />4. Clear and grub work areas.
<br />5. Removal of unsuitable soil.
<br />6. Placement and compaction of soil embankment material.
<br />7. Installation of water, sanitary sewer, electric, stormwater and fire suppression systems/structures.
<br />8. Construction of Transfer Building, Scales, Scalehouse, MRW Building, Administration Building.
<br />9. Rough grading, fine grading, geotextile installation, subgrade preparation, base course, and asphalt for
<br />road and parking lots.
<br />10. Installation of fencing and gates, signage, and striping.
<br />11. Construction Quality Control (CQC) testing.
<br />12. Completion of record drawings and related documentation.
<br />13. Repair/replacement of existing features impacted during construction.
<br />The Architect/Engineer:
<br />
<br />SCS Engineers
<br />2405 140th Avenue NE, #107
<br />Bellevue, Washington 98005
<br />
<br />The Owner and Contractor agree as follows.
|