My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LibertySwaukCreekBridge_Prospectus_Updated (2)
>
Meetings
>
2024
>
02. February
>
2024-02-06 10:00 AM - Commissioners' Agenda
>
Resolution_LibertySwaukCreekBridge_Prospectus_Updated (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 12:07:59 PM
Creation date
2/1/2024 12:07:20 PM
Metadata
Fields
Template:
Meeting
Date
2/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Liberty Road Swauk Creek Bridge Replacement CRP 306-21
Notes
Prospectus Updated
Order
26
Placement
Consent Agenda
Row ID
114122
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: February 6, 2024 <br />ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's <br />Signature on the Local Agency Federal Aid Project <br />Prospectus for the Liberty Road Swauk Creek Bridge <br />Replacement CRP 306-21. <br />BACKGROUND: On March 29, 2022, Kittitas County was informed that the <br />Liberty Road Swauk Creek Bridge Replacement Project <br />was selected to receive funding through the Federal Lands <br />Access Program (FLAP). The Federal Funds are <br />administered through Washington State Department of <br />Transportation (WSDOT) Local Programs per the Local <br />Agency Guidelines (LAG). <br />Public Works has also been granted additional funding <br />from the FLAP program to cover the higher than <br />anticipated construction costs. Public Works was notified in <br />November 2023 that an additional $1,200,000.00 was <br />approved for the project. Due to the continuing resolution <br />at the federal level, the Federal Highway Administration <br />has noticed Public Works that additional award will be <br />formalized at a later date. This prospectus is showing this <br />additional funding as local funds on the Prospectus but will <br />supplement our Local Agency Agreement with WSDOT <br />when the additional Federal Funding is formalized and <br />released. <br />The LAG requires Federal Funds for each phase of a <br />project to be obligated separately. The Preliminary <br />Engineering phase was obligated in May 2022. We are now <br />preparing to advertise for construction and are ready to <br />obligate the Construction Phase funds. <br />A Local Agency Federal Aid Project Prospectus must be <br />executed by the Chair acknowledging the project has been <br />reviewed and is consistent with the County's <br />comprehensive plan for community development. <br />INTERACTION: Public Works <br />RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature <br />on the Local Agency Federal Aid Project Prospectus for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.