Laserfiche WebLink
Item <br />No.Description <br />Approx. <br />Qty Unit Unit Price Total Price <br />1 Mobilization 1 LS $29,000.00 $29,000.00 <br />2 Traffic Control 1 LS $10,000.00 $10,000.00 <br />3 Construction Staking 1 LS $10,000.00 $10,000.00 <br />4 Contractor Quality Control 1 LS $20,000.00 $20,000.00 <br />5 Temporary Erosion and Sediment Control 1 LS $5,000.00 $5,000.00 <br />6 Unclassified Excavation 700 CY $20.00 $14,000.00 <br />7 Embankment in Place 60 CY $25.00 $1,500.00 <br />8 4" Asphalt (P-401)400 TN $200.00 $80,000.00 <br />9 6" Crushed Aggregate Base (P-209)520 CY $65.00 $33,800.00 <br />10 Pavement Marking 300 SF $4.00 $1,200.00 <br />11 Topsoil 200 CY $55.00 $11,000.00 <br />12 Seeding 0.8 AC $5,000.00 $4,000.00 <br />Subtotal $219,500.00 <br />September, 2021 <br />CENTURY WEST ENGINEERING <br />PLANNING LEVEL COST ESTIMATE <br />Kittitas County <br />BOWERS FIELD <br />Hangar Taxilane