My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-23-minutes-public-works-study-session
>
Meetings
>
2016
>
11. November
>
2016-11-01 10:00 AM - Commissioners' Agenda
>
2016-05-23-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:34:14 PM
Creation date
5/12/2020 1:33:39 PM
Metadata
Fields
Template:
Meeting
Date
11/1/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32766
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... nnE1.. WQig. <br />�� �`` KITTZTASS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />FITT,TAS COUNTY Mark Cook, Director <br />Public Works <br />STUDY SESSION MINUTES <br />May 23rd, 2016 <br />THOSE PRESENT: Obie O'Brien, Laura Osiadacz, Paul Jewell (BOCC), Mark <br />Cook, Gail Weyand, (PW) Stephanie Mifflin, Angela San <br />Filippo, Doc Hansen (CDS), Jim Goeben (IT) <br />Guests Present: Lindsey Ozbolt (Chamber), Chad Bala (Terra Design <br />Group), Pat Deneen <br />Request to Approve a Mark Cook, PW Director, asked the board to Approve a <br />Resolution to Award the resolution to award the 2016 Annual Paint Stripe program. <br />2016 Annual Paint Stripe <br />Program and Authorize <br />The Public Works Director <br />To sign said contract <br />Documents: <br />Board Direction: The board approved Resolution 2016-67. <br />Request to Approve a Mark asked for the authority to ratify this resolution to <br />Resolution to Authorize Atkinson/as the sub -contractor. <br />The Public Works Director <br />To sign a Professional <br />Services Agreement with <br />Jacobs Engineering Group, <br />Inc. for the Via Kachess <br />Culvert Replacement <br />Project: <br />Board Direction: The board approved to leave the resolution as written <br />and if this is a problem, let them know. Approved <br />resolution 2016-68. <br />Construction Proiects <br />Updates: Cook said there were significant savings from the No. 6 <br />project in asphalt that allowed all the approaches to be <br />paved. They ran under budget on the pre -level. Cook said <br />that Ken Bamford did a great job filling in for other <br />411 N. Ruby, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.