RESOLUTION NO. d O I q -I 0 3
<br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter
<br />of initiating a county road project designated as:
<br />CRP NO: 295-19 JOB NO: RC2090-FL
<br />IT IS HEREBY RESOLVED that the Dickey Creek Bridge #16203 Replacement mile post 2.84"2.85; is established.
<br />The Dickey Creek Bridge is functionally obsolete and currently load restricted. The project will replace the bridge with a
<br />wider and longer structure that will safely provide access for all vehicles, bicyclists, and pedestrians, while reducing flood
<br />impacts and restoring natural river processes.
<br />ARTERIAL 0
<br />ACCESS ~
<br />This project is hereby declared to be a public necessity and the Director of Public Works serving as the County Engineer is hereby
<br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
<br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of
<br />Public Works' estimate, is hereby made in the amounts and for the purposes shown:
<br />fgJ
<br />D
<br />PURPOSE I
<br />PRELMINARY ENGINEERING
<br />CONSTRUCTION ENGINEERING
<br />RIGHT-OF-WAY ACQUISITION
<br />SUB-TOTAL
<br />-
<br />Countv Forces CONSTRUCTION
<br />CONTRACT CONSTRUCTION
<br />SUB-TOTAL
<br />TOTAL PROJECT COST
<br />GRANT OR OTHER FUNDS
<br />Grant Source: FLAP
<br />TOTAL COUNTY ROAD FUND ALLOCATION
<br />AMOUNT I TOTALS
<br />$ 560,000
<br />$ 100,000
<br />$
<br />$ 660,000
<br />$
<br />$ 3,029,000
<br />$ 3,029,000
<br />$ 3,689 ,000
<br />$3,191,000
<br />$ 498,000
<br />,J1{,~,Ja-~
<br />Mark Cook, P.E.
<br />Interim County Engineer
<br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS
<br />ITEM NO. 10
<br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN
<br />ACCORDANCE WITH RCW 36.81.130
<br />IT IS FURTHER RESOLVED THAT:
<br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ.
<br />\,,,,1111 W JI I,,,,,,,
<br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY cou~:r--1~fOR_ij!t'5'1J~r(~QCORDANCE WITH RCW 36.77.065 AND
<br />WAC 136-18. .S,i:_; ~ ............ , •• ,."/-'~,. fh ~ CJo .·• .,,.....;..-..,,-------------.
<br />ADOPTED this 5 day of I Q ~( ,n,i)u,.,,v ' 2019. ::, .-·
<br />g:\base\forms\eng\crp-frm 10/28/2019
|