My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureProspectusNaneumRoadCulvert
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureProspectusNaneumRoadCulvert
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 12:45:37 PM
Creation date
8/2/2018 12:45:30 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Naneum Road Culvert Replacement Project
Order
29
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: August 7, 2018 <br />ACTION REQUESTED: Approve the Resolution Authorizing the Chair's signature <br />on the Local Agency Federal Aid Project Prospectus for the <br />Naneum Road Culvert Replacement Project <br />BACKGROUND: Public Works is planning to rehabilitate Naneum Road at <br />approximate milepost 3.1 by replacing an undersized <br />culvert. Water overtops the road at this culvert crossing <br />every year, and the resulting erosion has washed away <br />about half of the shoulder. The culvert also presents a <br />barrier to upstream fish passage and contributes to local <br />residential and agricultural flooding. <br />Project work includes replacing the undersized corrugated <br />metal pipe with a larger structure meeting the hydraulic <br />demand and fish passage requirements. The project will <br />also provide for installation of guideposts to improve <br />delineation, and improving the shoulders to comply with <br />current design standards. <br />Construction is planned for summer/fall of 2020. Public <br />Works is preparing to commence with design work on the <br />project and is requesting the release of the federal funds for <br />the Preliminary Engineering phase. This requires the Local <br />Agency Federal Aid Project Prospectus to be signed and <br />approved by the Chair of the BOCC. <br />INTERACTION: Public Works <br />RECOMMENDATION: Motion to approve the Resolution Authorizing the Chair's <br />signature on the Local Agency Federal Aid Project <br />Prospectus for the Naneum Road Culvert Replacement <br />Project <br />HANDLING: Return one (1) original to Public Works <br />ATTACHMENTS: Resolution <br />LEAD STAFF: Sara Folk, Engineering Services Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.