My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Agreement
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
Fully Executed Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2026 2:40:19 PM
Creation date
7/13/2026 2:40:15 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Agreement between the State of Washington Department of Ecology and Kittitas County Public Health Department
Order
14
Placement
Consent Agenda
Row ID
146084
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope lD: C3A59BA0-FE3D-8324-81 88444C3E61297 D <br />DEPARTMENT OF <br />ECOLOGY <br />State of Washington <br />AMENDMENT NO. 3 <br />TO AGREEMENT NO. AQOBC-2024-KiCPHD-00010 <br />BETWEEN <br />THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br />AND <br />KITTITAS COUNTY PUBLIC HEALTH DEPARTMENT <br />PURPOSE: To amend the above-referenced agreement (AGREEMENT) between the state of Washington Department <br />of Ecology (ECOLOGY) and KITTITAS COLINTY PUBLIC HEALTH DEPARTMENT (RECIPIENT) for the <br />Community-Led Air Quality Improvement for Ellensburg (PROJECT). <br />The purpose of amendment 3 is to update project timeline tasks and remove project deliverables that are no longer <br />relevant. This is a no-cost amendment. <br />IT IS MUTUALLYAGREED that the AGREEMENT is amended as follows: <br />Project Long Description: <br />Amended: <br />Community-Led Air Quality Improvement for Ellensburg <br />Kittitas County Public Health Department (KCPHD) proposes a six month- two year project depending upon funding <br />availability, starting in Jan2025, to reduce criteria air pollutants----carbon monoxide, lead, nitrogen dioxide, sulfur <br />dioxide, ozone, and particulate mafter-in Ellensburg, an overburdened community. The project emphasizes <br />community involvement to design emissions reduction strategies that reflect local priorities. If funding is only available <br />for six months the focus will be on the initial community engagement and data analysis needed for future projects when <br />funding becomes available. <br />Project Tasks and Deliverables <br />The project will unfold in four phases: <br />l. Community Outreach and Engagement (April 2025 - Sept 2025): <br />Conduct community engagement through meetings, focus groups, and surveys, diverse community input will be <br />collected. <br />Deliverable: Stakeholder group and initial outreach plan. <br />2.Data Collection and Needs Assessment (Oct2025 -March2026): <br />Surveys, interviews, and focus groups will assess community air quality concems. Ouheach will target <br />underrepresented groups to ensure equitable participation. <br />Deliverable: Needs assessment report summarizing community input. <br />3. Design of Emission Reduction Projects (April2026'Dec2026): <br />KCPHD will collaborate with the community to design emissions reduction strategies based on collected data. <br />Workshops and technical analysis will guide the design process. <br />Template Version 10 130 l2O1 5
The URL can be used to link to this page
Your browser does not support the video tag.