Laserfiche WebLink
ALSCACHITECTS <br />CHANGE ORDER NO.8 <br />PROJECT NAME:Ellensburg Rodeo Arena Completion <br />OWNER:Kittitas County <br />CONTRACTOR:Cascade Central Construction <br />PROJECT NO:2025-009 PAGE lof 137 <br />We bring our clients stones to life. <br />SPOKANE <br />203 N Washington <br />Suite 400 <br />Spokane,WA <br />99201 <br />‘509.8388568 <br />alscarchitects.com <br />DESCRIPTION OF CHANGE: <br />COP 33 -Structural Fill <br />COP 34 -RFP 8 BTC Scope Reduction <br />COP 35 -Chase Water Line <br />COP 36 -RFP 10 Post Indicator Valve Addition <br />COP 37 -Cast Iron Credit <br />Arena Cleanup Performed by Owner <br />Amount <br />$1 78,668.66 <br />($40,664.53) <br />$4,335.30 <br />$25,008.99 <br />($6,542.97) <br />($21,939.70) <br />Total This Change Order:$138,865.75 <br />Original Contract Sum <br />Net Amount of Previously Approved Changes: <br />Contract Sum Prior to This Change Order: <br />Contract Sum is increased by This Change Order: <br />Revised Contract Sum: <br />Original Contract Completion Date: <br />Previously Approved Increases in Time: <br />Completion Date Prior to This Change Order: <br />Contract time will be changed by <br />Calendar Days This Change Order <br />Revised Substantial Completion Date: <br />Revised Final Acceptance Date: <br />Iv <br />By:KC Carroll <br />Date 5/21/26 <br />Recommended By: <br />ALSC Architects,P.S. <br />$5,065,000.00 * <br />$1,371,101.33 <br />$6,436,101.33 <br />$138,865.75 <br />$6,574,967.08 <br />7/20/2026 <br />7 <br />7/23/2026 <br />0 <br />7/27/2026 <br />8/22/2026 <br />By:f€Th <br />Date <br />Approved by Owner: <br />By: <br />Date <br />*Does not include State or Local Sales Tax ALSC Architects IWe bring our clients’stories to life.