My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reolution 2024-094
>
Meetings
>
2024
>
05. May
>
2024-05-21 10:00 AM - Commissioners' Agenda
>
Reolution 2024-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 9:26:28 AM
Creation date
5/30/2024 9:26:26 AM
Metadata
Fields
Template:
Meeting
Date
5/21/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Initiating County Road Project Designated as CRP No. 320-24, 2024 Vantage Highway Paving
Order
11
Placement
Consent Agenda
Row ID
118340
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO.)n94''l <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, iN thc MAttCT <br />of initiating a county road project designated as: <br />CRP NO: 320-24 JOB NO: RC 2299 <br />lT lS HEREBY RESOLVED that the 2024Vantage Highway Paving be improved as follows: <br />The project will ptane the existing asphalt surface on Vantage Highway MP 6.56 - MP 1 1.17 and replace the asphalt with <br />a new hot mixed asphalt wearing surface and install new roadway striping and markings. The project will also contemplate <br />necessary safety upgrades to existing infrastructure. <br />ARTERIAL X <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80'030, 36'80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimaie, is hereby made in the amounts and for the purposes shown: <br />Cameron C , P.E <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2023 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO CE WITH RCW 36.77.020 ET.SEQ. <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO <br />wAc 136-18. <br />WITH RCW 36.77.065 AND <br />ADOPTED this 21st day of MaY,2024 <br />BOARD OF COUNTY <br />KITTITAS COUNTY, <br />ght, Commissioner <br />511512024 <br />B <br />TOTALSPURPOSE <br />PRELMINARY ENGINEERING 2 000 <br />$ 250,000CONSTRUCTION ENGINEERING <br />$RIGHT-OF-WAY ACQUISITION <br />$ 450,000SUB-TOTAL <br />$County Forces coNSTRUcrtoN <br />$ 2,500,000CONTRACT CONSTRUCTION <br />$ 2.500,000SUB-TOTAL <br />$ 2,950,000TOTAL PROJECT COST <br />s 2.551.750GRANT OR OTHER FUNDS <br />$ 398,250FUND ALLOCATION <br />Grant Source: STBG <br />TOTAL COUNTY <br />Q,Ittt Ly \\) <br />/i <br />SEAL <br />g :\base\forms\en g\crp-f rm <br />IONERS <br />hair cory
The URL can be used to link to this page
Your browser does not support the video tag.