My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Award_TaxilaneRehab
>
Meetings
>
2024
>
05. May
>
2024-05-07 10:00 AM - Commissioners' Agenda
>
Resolution_Award_TaxilaneRehab
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 12:15:29 PM
Creation date
5/2/2024 12:15:02 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Award the Contract for the Bowers Field East Taxilane Pavement Rehabilitation and Apron Reconfiguration and to Authorize the Public Works Director to Execute the Same
Order
20
Placement
Consent Agenda
Row ID
117448
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: May 7, 2024 <br />ACTION REQUESTED: Request to Approve a Resolution to Award the Contract for the <br />Bowers Field East Taxilane Pavement Rehabilitation and Apron <br />Reconfiguration and Authorize the Public Works Director to <br />execute the same. <br />BACKGROUND: On March 5, 2024, the BOCC approved a Notice of Call for <br />Sealed Bids for the construction of the Bowers Field East <br />Taxilane Pavement Rehabilitation Project. Sealed bids were <br />opened publicly on March 28, 2024, at Kittitas County Public <br />Works. There were three (3) responsive bids received. The <br />lowest responsive bid was from Central Paving, LLC in the <br />amount of $351,414.94. <br />The Federal Aviation Administration (FAA) reviewed bid <br />documents and responded on April 19, 2024, with concurrence <br />to award. <br />Pavement rehabilitation of the east taxilane and apron area are <br />identified as a priority need in the Bowers Field Capital <br />Improvement Plan (CIP). The Bipartisan Infrastructure Law as <br />enacted in the Infrastructure Investment and Jobs Act authorized <br />additional allocation for airport projects. Funding for pavement <br />rehabilitation work for Bowers Field project FAVAIP No. 3-53- <br />0026-022-2023 was awarded for 90 percent of construction with <br />a 10 percent local match. A grant application has been submitted <br />to the Washington State Department of Transportation Aviation <br />Division for funding to cover 5 percent of the required match. <br />The FAA has not yet released funds for the grant. This is <br />anticipated. The anticipated start of construction is June 2024. <br />INTERACTION: Public Works. <br />RECOMMENDATION: Approve the Resolution to Award the Contract for the Bowers <br />Field Taxilane Pavement Rehabilitation and Apron <br />Reconfiguration Project and Authorize the Public Works <br />Director to execute the same. <br />HANDLING: Return one (1) copy to Public Works. <br />ATTACHMENTS: Resolution with Bid Tab <br />LEAD STAFF: Joshua Fredrickson <br />Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.