My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES-2022-156
>
Meetings
>
2022
>
08. August
>
2022-08-02 10:00 AM - Commissioners' Agenda
>
RES-2022-156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 8:43:56 AM
Creation date
8/9/2022 8:43:54 AM
Metadata
Fields
Template:
Meeting
Date
8/2/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Establish County Road Project (CRP) Number Supporting the Replacement of Bridge #80181 Cooke Canyon Road Bridge over Hiline Canal
Order
11
Placement
Consent Agenda
Row ID
92041
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESoLUnoN no. J pAA- I blo <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />GRP NO: 315-22 JOB NO: RC 2194-BR <br />lT lS HEREBY RESOLVED that Cooke Canyon Rd Bridge #80181 be improved as follows: <br />The project will replace the existing single span, structurally deficient, load posted concrete bridge with a single span, <br />prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE AMOUNT TOTALS <br />PRELMINARY ENGINEERING $ 745,170.00 <br />CONSTRUCTION ENGINEERING $ 536,522.00 <br />RIGHT-OF-WAY ACQU ISITION $ 100,000.00 <br />SUB-TOTAL $ 1,381,692.00 <br />Countv Forces coNSTRUcroN $ <br />CONTRACT CONSTRUCTION $ 1.341.308.00 <br />SUB-TOTAL $ 1.341.308.00 <br />TOTAL PROJECT COST $ 2.723.000.00 <br />s <br />Grant Source: FY 2022 WSDOT Local Bridoe Prooram <br />TOTAL COUNry ROAD FUND ALLOCATION $0 <br />X <br />Zs <br />)doshua Fred ridk-son, P. E.- County Engineer <br />x THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2022 ANNUAL ROAD PROGRAM AS <br />ITEM NO. 08 <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.1 30 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN E WITH RCW 36.77.020 ET.SEQ. <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO <br />wAc 136-18. <br />WTH RCW36.77.065 AND <br />ith, Commissioner <br />ADoPTED this YA day ot LJql$t ,2022 <br />BOARD OF COUNTY COMMISSIONERS <br />S& <br />,/ <br />Lau ra <br />g : \base\forms\e n g\crp-frm <br />HINGTON <br />cory Vice-Chair <br />n^"'......,' <br />)l'U,r,rv ru,''tll ttt lIttttr <br />Brett <br />7t26t2022
The URL can be used to link to this page
Your browser does not support the video tag.