Laserfiche WebLink
RESoLUnoN No. AoA,l-o2, <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />GRP NO: 310-21 JOB NO: RC2292-G1 <br />lT lS HEREBY RESOLVED Vantage Highway over Cascade Canal (89342) Bridge Replacement <br />The project will replace bridge #89342 on Vantage Highway crossing the Cascade Canal at Milepost 5.25. The bridge is <br />currently load restricted and was recently damaged in a vehicle accident. The project will include replacing the existing <br />bridge, guardrail, approaches, and shoulders to meet current WSDOT safety specifications and requirements. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the Director of Public Works is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />Mark Cook, P.E. <br />Public Works Director <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2O2l ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN RCW 36.77.020 ET.SEQ. <br />WITH RCW 36.77.065 ANDn THE coNSTRUcroN rs ro BE ACCoMpLTsHED By couNTy <br />X <br />wAc 136-18. <br />ADoPTED tni" Al *a^v or <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS WASHINGTON <br />2021 <br />Commissioner <br />//lilll\ <br />PURPOSE AMOUNT TOTALS <br />PRELMINARY ENGINEERING $ 304,000 <br />CONSTRUCTION ENGINEERING $ 90.000 <br />RIGHT-OF-WAY ACQUISITION $ <br />SUB-TOTAL $ 394,000 <br />County Forces coNSTRUcloN $ <br />CONTRACT CONSTRUCTION $ 1.270.000 <br />SUB-TOTAL $ 1,270,000 <br />TOTAL PROJECT COST 1 664 000 <br />GRANT OR OTHER FUNDS $ 1,526.000 <br />Grant Source: STBG / American Rescue Plan <br />TOTAL COUNTY ROAD FUND ALLOCATION $ 138,000 <br />g :\base\forms\eng\crp-frm <br />acz, Vice-Chair Cory Wrig <br />12t15t2021