My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_STBG Funding Award
>
Meetings
>
2021
>
12. December
>
2021-12-21 10:00 AM - Commissioners' Agenda
>
Resolution_STBG Funding Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 12:46:34 PM
Creation date
12/16/2021 12:46:20 PM
Metadata
Fields
Template:
Meeting
Date
12/21/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award Transportation Funding in the Amounts of $870,000.00 to Kittitas County supporting the Vantage Highway over Cascade Canal Bridge Replacement; $1,284,000.00 to the City of Ellensburg supporting Brick Road Improvements; and $747,708.00 to the City of Cle Elum supporting the First Street Phase 3B Project
Order
20
Placement
Consent Agenda
Row ID
84393
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: December 21, 2021 <br />ACTION REQUESTED: Request to approve a Resolution to award Transportation Funding in <br />the amounts of $870,000.00 to Kittitas County supporting the Vantage <br />Hwy over Cascade Canal Bridge Replacement, $1,284,000.00 to the <br />City of Ellensburg supporting Brick Rd Improvements, and <br />$747,108.00 to the City of Cle Elum supporting the First Street Phase <br />3B project. <br />BACKGROUND: Kittitas County Public Works has obligation authority from <br />Washington State Department of Transportation (WSDOT) to manage <br />the Surface Transportation Block Grant (STBG) funds as a County <br />Lead Agency. Funding is typically allocated on a three-year cycle (FY <br />22-25) with a call for projects to eligible agencies, and then <br />monitoring progress to ensure obligation of awarded funds within the <br />allocated time frame. A recent call for projects was made to <br />qualifying agencies in the County. Four (4) applications were <br />received, one (1) from the City of Ellensburg, two (2) from the City of <br />Cle Elum, and one (1) from Kittitas County Public Works. A <br />technical advisory committee comprised of City of Ellensburg staff <br />and Kittitas County Public Works staff reviewed; scored, ranked, and <br />met to recommend awarding funds. <br />Kittitas County requested $870,000.00 to support the construction of <br />Vantage Hwy over Cascade Canal Bridge (No. 89342). The proposed <br />project will replace the damaged and load restricted bridge at milepost <br />5.25 Vantage Hwy. The existing structure will be replaced with a new <br />bridge, guardrail, and approaches. The roadway will be repaved, and <br />shoulders reconstructed, to meet current WSDOT standards and <br />specifications. <br />The City of Ellensburg requested $1,284,000.00 to support <br />construction of Brick Rd Improvements from Radio Rd to the <br />northern city limits. The proposed project will include roadway <br />widening and overlaying of the existing roadway to maintain the <br />existing two lanes of travel and will include the installation of <br />curb/gutter, stormwater facilities, illumination, and other <br />improvements. <br />The City of Cle Elum requested $747,108.00 to support construction <br />of the First Street Downtown Revitalization — Phase 3B. Beginning in <br />2017, the city has been implementing a phased approach to a <br />
The URL can be used to link to this page
Your browser does not support the video tag.