My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-071
>
Meetings
>
2021
>
05. May
>
2021-05-04 10:00 AM - Commissioners' Agenda
>
Res-2021-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 12:20:13 PM
Creation date
5/10/2021 12:20:11 PM
Metadata
Fields
Template:
Meeting
Date
5/4/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution to Establish County Road Project (CRP) No: 304-20 Supporting the Reconstruction of Hungry Junction Road
Order
10
Placement
Consent Agenda
Row ID
75943
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTTON NO"4 -o <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 304-20 JOB NO: RC2093 <br />lT lS HEREBY RESOLVED for Hungry Junction Road (M.P. 0.00-1.74) lmprovements <br />The existing BST pavement is narrow with areas of significant longitudinal cracking and settling over the top of drainage <br />structures. This existing pavement will be removed and replaced per design. There are also four vertical curves that need <br />to be corrected to meet safe sight stopping distance design standards for the posted speed limit. The road will be <br />widened, and above ground obstacles will be removed or relocated, guardrail installed or slopes flattened where <br />warranted. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />osh Fred , P.E. <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED2O2l ANNUAL ROAD PROGRAM AS <br />ITEM NO. 12 <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81,130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT WITH RCW 36.77 .02O ET.SEQ <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COU <br />wAc 136-18. <br />CE WTH RCW 36.77.065 ANDuFN <br />AD.PTED ui. 4fl\ a^y or Y\\-fuy'F ,zozt <br />BOARD OF COUNTY <br />KITTITAS COUNTY <br />, Chair <br />NERS <br />Cory Wright, Commissioner <br />4t28t2021 <br />PURPOSE AMOUNT TOTALS <br />$ 504.044PRELMINARY ENGINEERING <br />CONSTRUCTION ENGINEERING $ 168,015 <br />RIGHT-OF.WAY ACQU ISITION $ 50,000 <br />SUB-TOTAL $ 722,059 <br />$County Forces coNsrRucroN <br />CONTRACT CONSTRUCTION $ 3,629.1 19 <br />$ 3.629.1 19SUB-TOTAL <br />TOTAL PROJECT COST $ 4,351 ,178 <br />GRANT OR OTHER FUNDS $ 3,631,500 <br />Grant Source: RAP <br />$ 719,678TOTAL COUNTY ROAD FUND ALLOCATION <br />m ID <br />g :\base\forms\e ng\crp-f rm <br />Vice-Chair <br />liltlll
The URL can be used to link to this page
Your browser does not support the video tag.