My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-122
>
Meetings
>
2020
>
06. June
>
2020-06-16 10:00 AM - Commissioners' Agenda
>
Res-2020-122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 9:26:01 AM
Creation date
6/23/2020 9:25:56 AM
Metadata
Fields
Template:
Meeting
Date
6/16/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Prospectus for the Bullfrog Road Project, CRP 300-20
Order
16
Placement
Consent Agenda
Row ID
63426
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />STAf,E OF WASHINGTON <br />RESOLUTTON No. 2o2o --LXx <br />AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY <br />FEDERAL AID PROJECT PROSPECTUS FOR THE VANTAGE HIGHWAY <br />PROJECT' CRP 298-19 <br />WHEREAS: Deterioratingpavement during the20l9l2A winter along Bullfrog Road <br />resulted in a temporary speed reduction mitigating against increasing <br />safety concerns for travels (Resolution 2020-001); and <br />WHEREAS: The Bullfrog Road Project proposed using Federal Funds (Surface <br />Transportation Block Grant and Highway Infrastructure Funding) to repair <br />the damaged and deteriorating portions of Bullfrog Road; and <br />WHEREAS: This project will remove asphalt in the damaged locations and replace it <br />with new hot mix asphalt and install new roadway striping on the entire <br />length of Bullfrog Road; and <br />WHEREAS: In preparation to advertise the project for construction in July of 2020 <br />Public Works is requesting the Washington State Department of <br />Transportation to release the Federal Funds for construction; and <br />WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the <br />Chair acknowledging the project has been reviewed and is consistent with <br />the agency's comprehensive plan for community development; and <br />NOW, TIIEREFORE BE IT RESOLVED that the Board of County Commissioners, in <br />the best interest of the public, does hereby approve the Chair's signature <br />on the Local Agency Federal Aid Project Prospectus for the Bullfrog Road <br />Project, CRP 300-20.
The URL can be used to link to this page
Your browser does not support the video tag.