Laserfiche WebLink
PE&CE ROW Grand TotalProg. # 6yr Prog # Project Name Road # Road Name BMP EMP FFC Proj Length proj Type Env. Assess County Funds Amount Source 595.10 595.20 Contract County All 59511Teanaway Rd Hydraulic Improv28500 Teanaway Rd 6.91 8.64 8 0.22 Br S 268 1718 FLAP 50 1936 1986( Final Design and Construction Phase) SafetyRCFP22Fairview Rd Widening & Coleman Creek 63500 Fairview Rd 5.03 6.05 8 1.02 Br S 2150 100 50 2000 2150Structures (Construction Phase)FPSafetyRC33BAR 14 Road Turnaround (Design Phase)42512 Bar 14 Rd 0.24 0.25 9 0.01 RC E 110 10 10 90 110Other44Wiehl Road Improvements (RID)10681 Wiehl Rd PRIVPRIVPRIVN/A RC S 275 600 RID 875 1475(Construction Phase)Safety55Fowler Creek Rd22520 Fowler Creek Rd 9 3R S 330 30 300 33066Fish Lake Rd (Big Boulder Creek bridge)Fish Lake Rd N/A Br S 350 100 500 600Codes:Environmental Assessment:RCReconstructionS Significant3RRehabilitate, Resurface, RestoreI Insignificant2RResurface, RestoreE ExemptFAFederal Aid BridgeBrShort Span or other BridgesDRDrainage StructureHMAHMA Overlay, Grind inlayISIntersectionSafetySigning, Striping, MarkingFerryBoats, DocksP&TPaths, Trails, BikewaysSWSidewalksIllmIlluminationFPFish PassageOtherOtherMN&MMarine Navigation and MoorageCSCost ShareOther Funds ConstructionANNUAL CONSTRUCTION PROGRAM 2019