My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6 year transportation plan 2019_smf090518
>
Meetings
>
2018
>
12. December
>
2018-12-04 10:00 AM - Commissioners' Agenda
>
6 year transportation plan 2019_smf090518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 1:11:11 PM
Creation date
11/29/2018 1:11:08 PM
Metadata
Fields
Template:
Meeting
Date
12/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
l
Item
Request to Set a Public Hearing to Consider the Adoption of the Six Year Transportation Improvement Program for the Years 2019-2024 and the Annual Construction Program for 2019
Order
12
Placement
Consent Agenda
Row ID
49668
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEARING DATE:ADOPTION DATE:RESOLUTION #:PRIORITYproject numberCRP #Res. #designright of wayconstructiondesignright of wayconstructiondesignright of wayconstructiondesignright of wayconstructiondesignright of wayconstructiondesignright of wayconstructionAnticipated Construction Advertisement DateMay-18 REMAINDER OF PROJECT RC1578-E1 276-17 2018-054 130 May-18 <br />May-18 REMAINDER OF PROJECT 0 0 2017-201 45 May-18 <br />1 Mar-19 RC1569-B1 270-16 0 50 1936 Mar-19 <br />2 Mar-19 RC1581-G1 279-17 2016-102 100 50 2000 Mar-19 <br />3 May-19 RC1583-G1 286-18 2018-054 10 10 90 May-19 <br />4 May-19 RC1574-B2 281-18 2018-054 875 May-19 <br />5 May-19 0 0 2018-054 30 300 May-19 <br />6 May-19 0 0 0 100 500 May-19 <br />7 Jun-20 0 0 0 75 850 Jun-20 <br />8 Jun-20 0 0 0 40 2200 Jun-20 <br />9 Mar-20 RC1592-F1 293-18 0 50 20 500 Mar-20 <br />10 Mar-20 0 0 2018-101 50 700 Mar-20 <br />11 Apr-20 RC1582-G1 280-18 0 60 20 650 Apr-20 <br />12 Apr-21 RC1587-E1 284-18 2018-054 60 10 600 Apr-21 <br />13 Mar-21 0 0 2018-054 200 26 1650 Mar-21 <br />14 Mar-21 0 0 0 560 3129 Mar-21 <br />15 May-21 0 0 0 200 20 1300 May-21 <br />16 Mar-22 0 0 0 30 150 Mar-22 <br />17 Mar-22 0 0 0 100 1900 Mar-22 <br />18 Jun-22 0 0 0 75 850 Jun-22 <br />19 Apr-22 RC1585-F1 285-18 0 250 100 50 2500 Apr-22 <br />20 Apr-23 0 0 2018-054 50 1300 Apr-23 <br />21 Apr-23 RC1573-E1 273-16 0 178 1363 Apr-23 <br />22 May-23 0 0 2016-99 250 2250 May-23 <br />23 Jun-24 0 0 0 75 850 Jun-24 <br />24 Apr-24 RC1505-F1 226-09 0 125 50 1500 Apr-24 <br />25 Mar-24 0 0 2009-015 100 50 2000 Mar-24 <br />550 60 5876 1065 40 4900 306 100 6679 703 0 5400 225 0 4913 175 0 4350 <br />48000 <br />19972 <br />30280 <br />8203 <br />1200 <br />15370 <br />-7053 <br />25065 <br />8000 <br />33124 <br />2024 <br />KITTITAS COUNTY <br />2019-2024 <br />SIX YEAR TRANSPORTATION IMPROVEMENT PLAN <br />CAPITAL IMPROVEMENT PROJECT NAME <br />Manastash Rd Bridge MP 10.56 to MP 10.64 (BRAC and RAP awarded - 1% match) <br />Number 6 Road Bridge #79051 Replacement (RAP awarded - 10% match) <br />Teanaway Rd Hydraulic Improvement MP 6.91 to 8.64 (FLAP - 13.5% match) <br />2019 2020 2021 2022 2023 <br />Vantage Highway HMA (Assume RAP Funds - 10% match) <br />Signal at University Way and Reecer (STBG awarded for PE - 13.5% match) <br />HMA Overlay (Various Locations) <br />Kachess Lake Rd Culvert Replacement MP 2.5 (STBG for PE -13.5% match / Assume RAP for CN - 10% match) <br />Naneum Rd Culvert Replacement - Fish Passage (STBG for PE -13.5% match) <br />Airport Road Cle Elum, replace irrigation culverts crossing road MP .23 to MP 1.5 <br />Fairview Rd Widening & Coleman Creek Structures Brick Mill Rd to Rader Rd MP 5.03 to MP 6.05 <br />Bar 14 Road Turnaround <br />Weihl Road Improvements (RID - $600k from residents) <br />Fowler Road <br />Fish Lake Road (Assume Title I Funds) <br />2020 Kittitas Co. Rd Safety Improvement (Assume HSIP Funds) <br />HMA Overlay (Various Locations) <br />Manastash Road Creek Bank Stabilization and Snow Park Improvements MP 10.65 to 11.01 (FLAP 1,332,968 award, 13.5% match) <br />Sanders Road to Willard (2.5M) <br />2024 Kittitas Co. Rd Safety Improvement (Assume HSIP Funds) <br />Bowers Road Extension <br />N. Thorp Highway Bridge #97341 over Yakima River - Painting Project (Assume BRAC - 13.5% match) <br />Dickey Creek Bridge Replacement (FLAP - 3,190,898 award, 13.5% match) <br />Vantage Highway at Coleman Crk Fish Passage (Assume State Funds - 15% match) <br />N. Thorp Highway Bridge #97341 over Yakima River - Joint Repair <br />Hungry Junction Road Widening (Assume RAP - 10% match) <br />2022 Kittitas Co. Rd Safety Improvement (Assume HSIP Funds) <br />Bender Rd - Widening and Pedestrian Improvements (Assume STP - 13.5% match) <br />6486 6005 7085 6103 5138 4525 <br />DESIGN/ROW/CONSTRUCTION TOTALS <br />ANNUAL CAPITAL IMPROVEMENT TOTALS <br />ANNUAL REVENUE (MVF-TAX, ROAD, TAX, FEES)8000 8000 8000 8000 8000 8000 <br />1265 2698 <br />ANNUAL ROAD MAINTENANCE (INCL CHIP SEAL)4800 4896 4994 5094 5196 5300 <br />ANNUAL OTHER FUNDS (GRANTS,RID,ETC)2669 3602 4654 5084 <br />1408 1436 <br />LEVY SHIFT/SHERIFF DIVERSIONS 200 200 200 200 200 200 <br />ADMINISTRATION COSTS 1300 1326 1353 1380 <br />3873 1827 <br />ANNUAL IMPACT TO FUND RESERVES (NO NEW REVENUE)-2117 -825 -978 307 -2677 -763 <br />LOCAL-FUNDS USED FOR CAPITAL IMPROVEMENTS 3817 2403 2431 1019 <br />8210 9447TOTAL ROAD FUND BALANCE (PROPOSED LEVY LIFT STARTING IN 2021)6580 8887 <br />2210 1447 <br />ADDITIONAL REQUIRED FUNDING TO MAINTAIN RESERVES 2000 2000 2000 2000 <br />TOTAL ROAD FUND BALANCE (BEGINNING @9,000 NO NEW REVENUE)6383 5558 4580 4887
The URL can be used to link to this page
Your browser does not support the video tag.