My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureCAwithWSDOT
>
Meetings
>
2018
>
06. June
>
2018-06-19 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureCAwithWSDOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 1:49:55 PM
Creation date
6/14/2018 1:49:51 PM
Metadata
Fields
Template:
Meeting
Date
6/19/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
u
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Revised Certification Qualification Agreement with the Washington State Department of Transportation Local Programs
Order
21
Placement
Consent Agenda
Row ID
45638
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: June 19`h, 2018 <br />ACTION REQUESTED: Authorize the Chair Sign the Revised Certification <br />Acceptance Qualification Agreement with Washington <br />State Department of Transportation Local Programs <br />BACKGROUND: Kittitas County Department of Public Works (PW) is <br />currently a Certified Agency with Washington State <br />Department of Transportation (WSDOT) allowing us to <br />manage federally funded projects. The current cooperative <br />agreement (CA) does not contemplate having a licensed <br />Public Works Director. <br />The proposed CA allows either the County Engineer or <br />Licensed Public Works Director to sign numerous <br />documents required by Local Programs for state and <br />federally funded construction projects. The added <br />flexibility supports delivering projects on tights timelines <br />using either the County Engineer's authority or that of the <br />Licensed Director. <br />INTERACTION: Public Works <br />RECOMMENDATION: Authorize the Chair's signature on Revised Certification <br />Acceptance Qualification Agreement with Washington <br />State Department of Transportation Local Programs. <br />HANDLING: Return one original to Public Works. <br />ATTACHMENTS: Resolution, Certification Acceptance Qualification <br />Agreement <br />LEAD STAFF: Mark R. Cook, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.