My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RestoApproveTaskOrder3JacobsTeanawayHydraulics
>
Meetings
>
2017
>
10. October
>
2017-10-17 10:00 AM - Commissioners' Agenda
>
RestoApproveTaskOrder3JacobsTeanawayHydraulics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:12:56 PM
Creation date
1/16/2018 12:30:00 PM
Metadata
Fields
Template:
Meeting
Date
10/17/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution Authorizing Chairman's Signature on Formal Task Order Document No. 003 with Jacobs Engineering Group Inc. for the Teanaway Road Hydraulics Improvements
Order
12
Placement
Consent Agenda
Row ID
40001
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: October 17, 2017 <br />ACTION REQUESTED: Approve the Chairman's Signature on Formal Task Order <br />Document Number 003 with Jacobs Engineering Group Inc <br />BACKGROUND: In 2014 Public Works submitted an application to the <br />Washington Federal Lands Access Program for Teanaway <br />Road Hydraulics Improvements. <br />In 2016 Public Works executed the final agreement <br />documents from the Federal Highway Administration <br />(FHWA) department awarding $2,432,074 of grant funds <br />for said project. <br />Public Works successfully negotiated a change of scope <br />with FHWA in August of 2016 to change the Hydraulic <br />Improvement locations to address the top two identified <br />maintenance and flood locations. Additionally Public <br />Works reached out to the Washington State Department of <br />Fish and Wildlife to ensure the proposed project locations <br />also addressed top priorities in the region for fish passage. <br />Following the realignment of the engineering division and <br />the addition of survey capabilities Public Works requested <br />in the spring of 2017 that the delivery method for the <br />design and construction be altered. FHWA agreed to <br />relinquish control of the project delivery and allow these <br />efforts to be conducted in house by Public Works. <br />Public Works followed contracting guidelines for second <br />tier competition with the current three civil on call firms <br />selected through the Request for Qualifications (RFQ) <br />process that was finalized in February 2017. Following <br />scoring on the Request for Additional Information received <br />for the Teanaway Hydraulic project Jacobs Engineering <br />was the successful consultant selected to perform the work. <br />The cost for engineering services has been negotiated with <br />Jacobs Engineering Group for the Hydraulic, Geotechnical, <br />Environmental and Real Estate Services portions of the <br />design. Public Works is in agreement that a not to exceed <br />$327,653 is a fair cost for delivery and will keep the project <br />within budget including costs associated with the civil <br />design provided in house. <br />
The URL can be used to link to this page
Your browser does not support the video tag.