My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-09-14-minutes-public-works-study-session
>
Meetings
>
2026
>
10. October
>
2026-10-06 10:00 AM - Commissioners' Agenda
>
2026-09-14-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2026 12:21:38 PM
Creation date
10/1/2026 12:14:31 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
149866
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1: RECOMMENDED RIVER STAGE HEIGHT FOR NWS FLOOD RISK CATEGORIES <br />Fvictina Prnn-1 <br />Category <br />GH o <br />GH <br />Q <br />Notes regarding proposed <br />We will monitor and work to observe flooding at GH 48.7 - 48.9 to verify this action stage. Our hydraulic <br />modeling indicates that at 1,230 cfs, the channel capacity has met capacity and minor yard minor yard <br />Action <br />50 <br />48.9 <br />1,230 <br />inundation in the Elk Meadows Subdivision. USBR stage and discharge records from over the winter <br />suggests this flow is associated with a stage height of 48.9'. Recent correspondence with Elk Meadows <br />property owners indicates yard flooding at about GH 49.0' <br />Property within the Elk Meadows Subdivision is expected to see backyard flooding up to 0.5 ft and the <br />Minor <br />51.3 <br />49.9 <br />1,483 <br />Pine Glen Subdivision begins to see minor yard inundation and channel capacity being met. <br />Elk Meadows Subdivision roads past the bridge become inundated and lots along Elk Meadows road <br />Moderate <br />N/A <br />50.7 <br />2,530 <br />become inundated. Pine Glen Subdivision to see additional yard inundation. Sun Island Subdivision <br />begins to see minor yard inundation and channel capacity being met. <br />Major <br />N/A <br />53.75 <br />5,572 <br />1 Extensive inundation of structures and roads. <br />GH Gauge Height (feet) <br />Q Discharge (cubic feet per second) <br />Page 3 of 4 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.