Laserfiche WebLink
Roads. The County Road Safety Plan identifies improvements for Kittitas Highway and No. 6 Road as priority 1 in the <br />plan. The Road Safety Plan is the basis for application to the State for funding through the Highway Safety Improvement <br />Plan( HSIP). Project funding is based on State allocation to the HSIP. The six -year plan includes projects for funding <br />received through the HSIP. Passmore Road is currently identified as a Primitive Roadway with a gravel surface. Primitive <br />roads are not part ofthe County' s primary road system. Maintenance is performed including grading the roadway on an <br />annual basis. <br />Kittitas County has failed to perform even the most basic safety work at the intersection of Kittitas Highway and No. 6 <br />Road, including clearing vegetation and other obstructions from the public right-of-way to improve sight distance. <br />Clearing the right-of-way should happen immediately, but it is not a complete solution. The County should begin planning <br />and securing funding for a roundabout to reduce vehicle speeds and lessen the severity of crashes. Roundabouts have <br />worked successfully on Bullfrog Road and in comparable traffic settings near Mattawa and Quincy. <br />The danger at this intersection is known and foreseeable. The County has been put on notice. If officials continue to delay <br />meaningful safety improvements, they must accept responsibility for the consequences of that decision. <br />AIRPORT <br />BRIEFING SUMMARY: <br />• Bowers field is a County owned public use airport <br />• Capital projects are underway and proposed for the airport <br />• Funding to the airport includes grants, lease payments and County General fund <br />transfers <br />Capital projects are funded primarily through funding allocated by the Federal Aviation Administration (FAA). The current <br />project is the construction of a hangar taxilane project which will allow for hangar space to be developed. The recent <br />completion of a wetland mitigation site met the requirement for mitigation of wetland impacts of a proposed project. Future <br />work will include items on the Capital Improvement Plan. The largest capital project proposed is the parallel taxiway <br />project. This project has an estimated design and construction cost of $15 million. Funding for capital projects is typically <br />supported by the Federal Aviation Administration ( FAA) through an annual allocation. This allocation is programmed. For <br />larger projects the FAA may use discretionary funding. A local match, typically 10%, is required. The parallel taxiway is <br />proposed to be designed in 2027 and construction beginning in 2029. <br />Kittitas County needs to get serious about Bowers Field <br />The County should place $1.5 million of distressed -area sales -tax revenue in reserve now to provide the anticipated local <br />match for the future $15 million FAA airport -improvement project. Securing the match would demonstrate that the County <br />is prepared to move forward when federal funding becomes available. <br />The County was legally gifted the airport incubator building more than two years ago, yet there is still no clear plan for its <br />use. That is not responsible management of a public asset. <br />Wetlands near an active airport runway create a potential wildlife -attraction and bird -strike hazard. The County should <br />determine which wetlands can legally be filled and mitigate those impacts by restoring or protecting wetlands elsewhere — <br />potentially as part of the County's Yakima River floodplain property acquisitions. <br />Waiting for a bird strike involving an aircraft flown by a student pilot is not an acceptable safety policy. The County must <br />act before a preventable accident occurs —not afterward, when condolences are all it has left to offer. <br />