Laserfiche WebLink
Basis for Project: Wilson-Naneum-Cher Assessment <br />PROJECT DESCRIPTION <br />Evaluate risks and identify mitigation and management strategies to address episodic sediment deposition <br />along Wilson-Naneum Alluvial Fan. This strategy will be informed by natural sediment transport processes, <br />feasibility of an ongoing sediment management program, the potential for capital flood alleviation project, and <br />the role of landowner stewardship. <br />FLOOD IMPACTS <br />Manage potential for infrastructure risk associated with flood related sediment mobilization and deposition. <br />SCHEDULE <br />• 2028: Assessment <br />• 2029: Landowner Outreach <br />• 2030: Project Design and Permitting <br />FUNDING <br />• State: FCAAP (Potential) <br />• Local: FCZD Levy <br />For more project information contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us <br />