Laserfiche WebLink
Basis for Project: 2019 Crystal Creek flood study <br />PROJECT DESCRIPTION <br />Crystal Creek flood conveyance will be increased so that flood risk is decreased. Project to be selected based <br />on evaluation of 2019 flood study and with input from Cities of Roslyn and Cle Elum. <br />FLOOD IMPACTS <br />Decreased flooding along Crystal Creek <br />SCHEDULE <br />FUNDING <br />• 2029: Project Selection • TBD <br />• 2030: Final Design and Permitting <br />• 2031:Implementation <br />