My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Preliminary Budget_Final
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
Preliminary Budget_Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 3:37:42 PM
Creation date
8/27/2026 3:37:36 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge Submission of the Preliminary 2027 County Wide Budget
Order
2
Placement
Consent Agenda
Row ID
148367
Type
Correspondence
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Wide – 2027 Capital Project Requests <br />Preliminary requests do not reflect proposed funding offsets,which will be presented for <br />consideration during the budget hearing process.The attached project list excludes Public Works <br />projects and Sheriff’s Office vehicle replacements,both of which are included in the preliminary <br />budget figures. <br />Continuing Project completion estimates are being finalized and not included above – at this time, these <br />projects do not require additional funding and will expend the balance that has been set aside. <br />Total Cost <br />EVENT CENTER Cement in Goat Barn 60,000 <br />Master Plan Creation Update 120,000 <br />New Bathroom stanchions Western Village 10,000 <br />Replace floors in Manastash/Heritage 55,000 <br />Rock North Lot 40,000 <br />RV Park Project Continued 50,000 <br />South Grandstands HVAC system 90,000 <br />Tractor 120,000 <br />Upgrade Expo Hall Sound Systems 30,000 <br />MAINTENANCE Bathroom Tile Refinish 20,000 <br />Clerks front counter wall 35,000 <br />HVAC Replacement Upper District Court 50,000 <br />IT HVAC 25,000 <br />LDC Mens Bathroom Tile Repair 15,000 <br />Seal Coat and Stripe Parking Lots 40,000 <br />Sheriff Door/Wall 35,000 <br />Various Mini-Split Replacements 20,000 <br />PUBLIC WORKS Airport Subsidize 386,000 <br />Grand Total 1,201,000
The URL can be used to link to this page
Your browser does not support the video tag.