My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07.01.26-12.31.31 Interagency between State of WA and KCPHD (Wells)
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
07.01.26-12.31.31 Interagency between State of WA and KCPHD (Wells)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:07:05 PM
Creation date
8/27/2026 12:05:03 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing an Interlocal Agreement Between Kittitas County and the State of Washington Department of Ecology for Administration and Enforcement of Certain Water Well Construction Regulations
Order
24
Placement
Consent Agenda
Row ID
148367
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington, Department of Ecology <br />IAA No. C2600194 <br />Entity Name: Kittitas County Public Health Department <br />TECHNICAL AND ENFORCEMENT SUPPORT <br />ECOLOGY shall provide technical and enforcement support throughout the term of this Agreement. The <br />primary point of contact for technical and enforcement assistance will be the Well Construction and <br />Licensing Program Coordinator (360) 407-6648. <br />VIOLATIONS PROCEDURES <br />KCPHD shall supply ECOLOGY with a copy of their enforcement procedures relating to the delegated <br />items of this Agreement within ninety (90) days from signing. <br />Violations identified by KCPHD which are not covered by this Agreement shall be reported to ECOLOGY's <br />Central Regional Office (509) 575-2639. Verbal notification of these types of violations shall be given <br />within 24 hours. To facilitate ECOLOGY's role in future enforcement actions, written documentation of <br />suspected violations may be required and will be evaluated by ECOLOGY on a case -by -case basis. <br />Specific enforcement procedures will be included in the basic training instructions. <br />ANNUAL REVIEW <br />KCPHD and ECOLOGY shall review and evaluate the terms of this Agreement annually upon a mutually <br />agreed month. At a minimum, the evaluation must include an audit of construction inspections, <br />decommissioning inspections, enforcement activities, variances, and other driller interactions that <br />occurred during the year. The evaluation will also address the need to update or otherwise change <br />portions of this Agreement, changes will be handled via amendment. ECOLOGY shall prepare a report of <br />the findings. The report shall be made available via the internet or upon request. <br />11 <br />Version 1/5/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.