My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOU Regional Onsite Sewage System Loan Program
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
MOU Regional Onsite Sewage System Loan Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:36 PM
Creation date
8/27/2026 12:04:51 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Authorize an Interlocal Agreement between Kittitas County and the Washington State Department of Ecology and the Washington State Department of Health for the Regional Onsite Sewage System Loan Program
Order
25
Placement
Consent Agenda
Row ID
148367
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jurisdictions may withdraw from this AGREEMENT provided written notice is provided to <br />each of the other Partners thirty (30) days prior to withdrawing from this AGREEMENT. <br />The Partners agree to collaborate on the RLP as specified in the Roles and Responsibilities <br />attached and incorporated as Appendix A to this MOU. <br />The FIP will provide competitive loan rates and flexible terms to property owners to finance <br />OSS repairs, replacements, or conversion to sewer to protect water quality and public health. <br />Financial responsibility for repayment to Ecology of any State Revolving Fund <br />disbursements under the RLP will belong to the FIP. The Partners will provide property <br />owner referrals to the FIP. <br />The program guidelines define program structure and service delivery during <br />implementation of the RLP. The roles and responsibilities described in this MOU coincide <br />with the period of operation of the RLP as spelled out in the contract between Ecology and <br />FIP. The Partners intend to administer and continue this RLP as long as sufficient loan and <br />grant funds are available to recapitalize and effectively sustain it. <br />The LHJs will fulfill their responsibilities for septic system permitting and technical <br />assistance as required by chapter 246-272A WAC, including review of septic design repair <br />applications, and record drawings; completing final inspections, and notifying FIP upon <br />request that the project is completed so payment is authorized to contractors for completed <br />work. <br />Each party to this agreement shall be responsible for its own acts and/or omissions and those <br />of its officers, employees and agents. Each party shall fully indemnify and hold harmless the <br />other parties against all claims arising out of the indemnifying party's own negligent acts or <br />omissions in performance of this agreement. <br />This MOU may be executed by facsimile or electronic mail in any number of current parts <br />and signature pages hereof with the same effect as if all Members had all signed the same <br />document. All executed current parts shall be construed together, and shall, together with the <br />text of this MOU, constitute one and the same instrument. <br />Name: <br />Title: <br />Agency: <br />Date: <br />REGIONAL LOAN PROGRAM MEMORANDUM OF UNDERSTANDING Page 2 of 3 <br />July 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.