My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CH Server Room - AC Replacement Proposal
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
CH Server Room - AC Replacement Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:13 PM
Creation date
8/27/2026 12:04:41 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Task Order #2 with Hultz BHU for the Courthouse IT Server Room A/C Project
Order
19
Placement
Consent Agenda
Row ID
148367
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hultz/BHU Engineers (253) 383-3257 <br />Consulting Engineers <br />Project:Kittitas County Courthouse Server AC Units <br />Work:Electrical Engineering Page: 2 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Site Visit See Mechanical <br />Confirm Loads 3 <br />E#-Legend/General Notes 1 1 <br />E#-Power Plan(s) 0.5 2 1 <br />E#-New Panel Schedules 1 1 <br />E#-New One Line Not Included <br />Specifications - Technical 3 1 <br />Coordination 2 <br />Meetings 1 <br />QC Review 1 1 1 <br />Progress Submittal(s) 1 1 <br />Cost Estimate(s) 0.5 2 <br />Hour Total 2 0 0 0 17 0 0 5 1 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85 <br />Labor Cost Sub-Totals $500 $0 $0 $0 $2,720 $0 $0 $550 $85 <br />DESIGN PHASE TOTAL:$3,855 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Pre-Bid Meeting Not included <br />Substitution Request Review 0.5 <br />Bidder Questions 1 <br />Addenda 1 1 <br />Hour Total 0 0 0 0 2.5 0 0 0 1 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />Labor Cost Sub-Totals $0 $0 $0 $0 $400 $0 $0 $0 $85 <br />BID PHASE TOTAL:$485 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />Pre-Con Meeting 1 <br />Submittal Reviews 4 2 <br />Submittal Re-Reviews 1 <br />Correspondence Review 1 <br />Meetings (Virtual) 2 <br />Site Visits Not Included <br />RFI's 0.5 1 0.5 <br />Punchlist See Mechanical <br />Backcheck See Mechanical <br />Closeout Review See Mechanical <br />Hour Total 0.5 0 0 10 0 0 0 0.5 2 <br />Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />Labor Cost Sub-Totals $125 $0 $0 $1,750 $0 $0 $0 $55 $170 <br />CONSTRUCTION PHASE TOTAL:$2,100 <br />TOTAL ALL PHASES:$6,440 <br />- Assoc Senior Senior Project Project Senior CAD .- <br />Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical <br />$250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 <br />NIC = Not Included <br />E N G I N E E R I N G H O U R S <br />Hourly Rates <br />DESIGN PHASE <br />BID PHASE <br />CONSTRUCTION PHASE <br />6/17/2026
The URL can be used to link to this page
Your browser does not support the video tag.