My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-08-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-08-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:10:17 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B E LSA AS P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />& 509-925-9747 FAX: 509-962-3031 <br />SMITHbrandon@belsmith.com <br />no <br />BELSASC0330H <br />June 20,2026 <br />Re: MRW North Wall <br />Per the description below, we present the following change order proposal #76 (COP#76). <br />COP #76 includes all the labor and materials needed to construct the additional northern wall <br />of the MRW Facility. The items included in this proposal are as shown below. <br />• Steel Framing and misc. need brackets <br />• All fasteners and anchors <br />• Metal siding and trim <br />• Gutter extension <br />• Any needed equipment <br />A more detailed cost breakdown is shown below along with the plans that we will be building <br />off. If the plans have changed or if you have any additional questions, please feel free to reach <br />out. <br />Total cost added to contract: <br />Time extension required: 0 Days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />$70,477.93+WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.