My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-08-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-08-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:10:17 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAA <br />SMITH <br />BELSASCO330H <br />June 18,2026 <br />Re: Grinder Shed Building Construction <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@beismith.com <br />Per the description below, we present the following change order proposal #75 (COP#75). <br />COP #74 includes all the labor and materials needed to construct the grinder shed. As <br />determined in our meetings the grinder shed is a stick built 20' x 6' building used the house the <br />grinder control panel. The building scope includes: <br />• 2x6 framing <br />• One man door <br />• One roller door <br />• Siding and roofing <br />• Plug in AC unit <br />• Insulation <br />• Interior sheeting <br />• Grinder control panel stand <br />Please note that the electrical package for this was captured in COP 74 and that the majority of <br />the work was performed as a force account per the county. The only work currently remaining <br />is the insulation, panel stand placement, and interior sheeting. <br />Total cost added to contract: <br />Time extension required: 0 Days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />FA #06: $21,981.77 + WSST <br />COP #75: $11,698.78 + WSST <br />Complete Scope: $33,680.55 + WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.